Linkage Projects - Grant ID: LP0349294

Funding Activity

Does something not look right? The information on this page has been harvested from data sources that may not be up to date. We continue to work with information providers to improve coverage and quality. To report an issue, use the .

Funded Activity Summary

Geological controls on high-grade oreshoots in the Wallaby gold deposit, Western Australia: Understanding the role of magmatic fluids in an Orogenic Au system. This project aims to understand the geological controls on high-grade (>2 g/t Au) oreshoots at the world-class Wallaby gold deposit (>7 Moz Au). In particular, the role of magmatic fluids in the transport and deposition of gold will be investigated. The Wallaby gold deposit is an ideal natural laboratory to investigate the complex relationship between the geometry and timing of faults, influx of multiple hydrothermal fluid events and the deposition of gold. In particular, the study will investigate the relative importance of intrusion-related, and fault zone-related events in the formation of high-grade ore shoots. The outcomes of this study will include a clear understanding about the timing and relative contribution of magmatic and fault zone related events and their significance to the formation and geometry of high-grade oreshoots.

Funded Activity Details

Start Date: 01-07-2003

End Date: 31-12-2008

Funding Scheme: Linkage Projects

Funding Amount: $84,000.00

Funder: Australian Research Council