ARC Future Fellowships - Grant ID: FT190100735

Funding Activity

Does something not look right? The information on this page has been harvested from data sources that may not be up to date. We continue to work with information providers to improve coverage and quality. To report an issue, use the .

Funded Activity Summary

Game changing anchoring solution for Australia’s deep water gas development. This Fellowship aims to establish a novel dynamically installed anchor shape for economic and safer mooring of floating gas drilling platforms in Australia’s deep water calcareous seabed. The novel anchor pairing with the advanced floating platforms are expected to allow for unlocking Australia’s 50% gas reserves that are considered to be stranded. This Fellowship expects to extend a sophisticated numerical analysis technique and a soil constitutive model, and use field testing in the Swan River and centrifuge modelling for extensive investigation on the novel anchor shape, leading to calculation methods for assessing the anchor embedment during dynamic installation and capacity under operational monotonic and cyclic loadings.

Funded Activity Details

Start Date: 17-08-2020

End Date: 16-08-2024

Funding Scheme: ARC Future Fellowships

Funding Amount: $992,000.00

Funder: Australian Research Council