Linkage Projects - Grant ID: LP0991701

Funding Activity

Does something not look right? The information on this page has been harvested from data sources that may not be up to date. We continue to work with information providers to improve coverage and quality. To report an issue, use the .

Funded Activity Summary

Time-dependent in-service behaviour of composite concrete slabs with profiled steel decking. At present, the in-service behaviour of composite floor slabs is incompletely understood, and structural designers have no reliable means to assess the effects on structural behaviour of shrinkage warping, time-dependent cracking, temperature gradients and the influence of prestress on bond-slip at the concrete-deck interface. This project will, through laboratory testing and theoretical analysis, provide the necessary data to develop and calibrate models to simulate structural behaviour and provide rational guidance for design engineers. The project will result in more serviceable and more economical composite floor slabs in Australian buildings, thereby reducing the costs of construction, maintenance and repair.

Funded Activity Details

Start Date: 12-2009

End Date: 12-2013

Funding Scheme: Linkage Projects

Funding Amount: $255,000.00

Funder: Australian Research Council

Research Topics

ANZSRC Field of Research (FoR)

Civil Engineering | Structural Engineering

ANZSRC Socio-Economic Objective (SEO)

Civil | Civil | Cement and concrete materials |