Linkage Infrastructure, Equipment And Facilities - Grant ID: LE140100010
Funder
Australian Research Council
Funding Amount
$900,000.00
Summary
National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique fac ....National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique facility will offer a national and international hub for industry-driven research and consulting. The project outcomes will propel more Australian researchers to be among the world-leaders of rail technologies providing better solutions to challenging track environments. Prototype testing will ensure safer and cost-effective track designs.Read moreRead less
Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechani ....Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechanisms of mud pumping, incorporating train loads and frequencies, will be studied, and the role of vertically installed drains will be quantified for improved practical design. The project aims to contribute to improved track longevity and reduced maintenance costs, with a corresponding boost in rail productivity.Read moreRead less
ARC Centre of Excellence for Geotechnical Science and Engineering. To pioneer new scientific approaches for geotechnical design of Australia's energy and transport infrastructure. Australia will spend over $250 billion during the next five years on the provision of physical infrastructure for energy and transport, which is the critical importance to the nation's future prosperity. The Centre for Geotechnical Science and Engineering will develop new computational and experimental approaches to un ....ARC Centre of Excellence for Geotechnical Science and Engineering. To pioneer new scientific approaches for geotechnical design of Australia's energy and transport infrastructure. Australia will spend over $250 billion during the next five years on the provision of physical infrastructure for energy and transport, which is the critical importance to the nation's future prosperity. The Centre for Geotechnical Science and Engineering will develop new computational and experimental approaches to underpin the geotechnical design of this infrastructure and provide a national focus for geotechnical research. New scientific approaches and software for designing cheaper and safer infrastructure in the energy and transport sectors.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE120100011
Funder
Australian Research Council
Funding Amount
$700,000.00
Summary
The national geotechnical centrifuge facility. A new geotechnical centrifuge will enable the modelling of complex offshore and onshore structures. The new facility will support many geotechnical fields, associated with the economical and geographical development of Australia, and ensure that Australia will maintain its leadership within the international physical modelling community.
Spatial network analysis for multimodal urban transport systems: a planning decision support tool. This research explores and assesses the development and use of accessibility tools for integrated land use and transport planning. It will establish international benchmarks for sustainable accessibility providing evidentiary support for government decision making and investment in sustainable urban development and public transport infrastructure.