A New Phase and New Issues of Rural-Urban Migration in China. China’s urbanisation has come to a turning point. The large pool of rural young workers (16-25 years of age), which fed the industrialisation needs of the 1990s and 2000s, has exhausted. Future growth needs to rely on the increase in the length of stay of the existing migrants and the increase in older new migrants. Due to this shift, the institutional restrictions, which deter family migration, become the key challenge. This project ....A New Phase and New Issues of Rural-Urban Migration in China. China’s urbanisation has come to a turning point. The large pool of rural young workers (16-25 years of age), which fed the industrialisation needs of the 1990s and 2000s, has exhausted. Future growth needs to rely on the increase in the length of stay of the existing migrants and the increase in older new migrants. Due to this shift, the institutional restrictions, which deter family migration, become the key challenge. This project examines the cost of the migration restrictions (shortened labour supply and reduced human capital accumulation for the current and next generation migrants: their education, health and pro-social behaviour); and the best way to reform the restrictions on family migration and the priority for the reform.Read moreRead less
Addressing race-based discrimination in Australia: a cost-benefit analysis. This project is designed to produce sustainable benefits to Australian society through the provision of important data needed to promote investment in strategies to address race-based discrimination. This will benefit both the lives of individuals experiencing race-based discrimination, including those from Indigenous and culturally and linguistically diverse backgrounds. It will also benefit society as a whole through p ....Addressing race-based discrimination in Australia: a cost-benefit analysis. This project is designed to produce sustainable benefits to Australian society through the provision of important data needed to promote investment in strategies to address race-based discrimination. This will benefit both the lives of individuals experiencing race-based discrimination, including those from Indigenous and culturally and linguistically diverse backgrounds. It will also benefit society as a whole through promotion of social cohesion and community connectedness and the economic benefits resulting from increased productivity and workforce participation and reduced burden on health, social and welfare systems.Read moreRead less
The early tectonic evolution of the Curnamona Province. This project aims to test the hypothesis that the Curnamona Province preserves evidence for an extension-related structural geology architecture. This will allow a comparison of the basin evolution, crustal architecture and mechanisms of basin development between the Curnamona Province and well-understood basins of the Mount Isa Inlier. The project is expected to add value to pre-existing databases, and deliver a plate tectonic and str ....The early tectonic evolution of the Curnamona Province. This project aims to test the hypothesis that the Curnamona Province preserves evidence for an extension-related structural geology architecture. This will allow a comparison of the basin evolution, crustal architecture and mechanisms of basin development between the Curnamona Province and well-understood basins of the Mount Isa Inlier. The project is expected to add value to pre-existing databases, and deliver a plate tectonic and structural framework to interpret basin evolution and constrain geochronology/geochemical analysis, and develop a three-dimesional crustal architecture. The results will provide new constraints on the evolution of the Australian plate, and how the Australian crust has evolved.Read moreRead less
Accurate calibration and interpretation of airborne electromagnetic data. There is increasing interest in using airborne electromagnetic (AEM) data to explore structural features hidden beneath the earth's surface. At present, 2D images of these features can be built up using approximate 1D models that predict electrical conductivity. This research will develop 2D models that allow accurate imaging of 3D structures. Applications include mineral and diamond exploration, the mapping of leakage fro ....Accurate calibration and interpretation of airborne electromagnetic data. There is increasing interest in using airborne electromagnetic (AEM) data to explore structural features hidden beneath the earth's surface. At present, 2D images of these features can be built up using approximate 1D models that predict electrical conductivity. This research will develop 2D models that allow accurate imaging of 3D structures. Applications include mineral and diamond exploration, the mapping of leakage from tailings dams, and more precise mapping of dryland salinity. The project also aims to develop a method to calibrate AEM systems, leading to more accurate environmental mapping and significant long-term economic benefits.Read moreRead less
Improving the Continuous Copper Converting Process Using Ferrous Calcium Silicate Slags. Replacement of refractories due to slag attack is a major cost in the copper making process. Metallurgists need to find a better slag which retains the benefits of current slags but is less aggressive towards refractories. This project will assess the suitability of a newly proposed ferrous calcium silicate slag for continuous copper converting. The outcomes will be to: (1) provide fundamental knowledge of ....Improving the Continuous Copper Converting Process Using Ferrous Calcium Silicate Slags. Replacement of refractories due to slag attack is a major cost in the copper making process. Metallurgists need to find a better slag which retains the benefits of current slags but is less aggressive towards refractories. This project will assess the suitability of a newly proposed ferrous calcium silicate slag for continuous copper converting. The outcomes will be to: (1) provide fundamental knowledge of the properties of the SiO2-CaO-FeO slag system, (2) provide data on the rate and mechanism of refractory attack by this slag and (3) enable the copper smelting industry to assess the potential of this slag to reduce operating costs.Read moreRead less
Unearthing the Marginal Terranes of the South Australian Craton: Keystone of Proterozoic Australia. This project will investigate the buried geology of vast regions of northern South Australia that is likely to be compatible with rocks that host enormous mineral wealth including the giant Broken Hill and Olympic Dam deposits. We will access these buried rocks using a program of on-shore scientific drilling that will provide the ground truth for multi-million dollar federal and state government ....Unearthing the Marginal Terranes of the South Australian Craton: Keystone of Proterozoic Australia. This project will investigate the buried geology of vast regions of northern South Australia that is likely to be compatible with rocks that host enormous mineral wealth including the giant Broken Hill and Olympic Dam deposits. We will access these buried rocks using a program of on-shore scientific drilling that will provide the ground truth for multi-million dollar federal and state government funded geophysical data acquisition. Results will help identify prospective mineral belts and determine the processes responsible for their formation.Read moreRead less
Evolution of the Proterozoic lithosphere and its bearing of sediment hosted base metal mineralisation. This project aims to determine the aspects of lithospheric evolution that led to a concentration of giant base metal mineral deposits in the Early to Middle Proterozoic (ca 1.9-1.5 billion years ago). We propose to test three related hypotheses that, if validated, will fundamentally change our view of Proterozoic metallogenesis and the way the mineral industry approaches exploration for these ....Evolution of the Proterozoic lithosphere and its bearing of sediment hosted base metal mineralisation. This project aims to determine the aspects of lithospheric evolution that led to a concentration of giant base metal mineral deposits in the Early to Middle Proterozoic (ca 1.9-1.5 billion years ago). We propose to test three related hypotheses that, if validated, will fundamentally change our view of Proterozoic metallogenesis and the way the mineral industry approaches exploration for these deposits.Read moreRead less
A New Approach to the Collection of a Large Suite of Dinasour Specimens. Monash University and the University of Alaska, Fairbanks, propose to cut of a tunnel in permafrost on the North Slope of Alaska during the early Spring. This is expected to lead to the acquisition of a new assembly of dinasour fossils. An important aspect of the project is its sponsorship by Big Island Pictures, Brisbane, who will produce a documentary about this unique experiment in palaeontological engineering. This no ....A New Approach to the Collection of a Large Suite of Dinasour Specimens. Monash University and the University of Alaska, Fairbanks, propose to cut of a tunnel in permafrost on the North Slope of Alaska during the early Spring. This is expected to lead to the acquisition of a new assembly of dinasour fossils. An important aspect of the project is its sponsorship by Big Island Pictures, Brisbane, who will produce a documentary about this unique experiment in palaeontological engineering. This novel approach to recovering dinosaurs will lead to a new and perhaps more complete assemblage of specimens, whilst attracting a vast audience and conveying to the public how innovative science is done. The public interest is attested to by the consortium of sponsors that has been assembled by Big Island Pictures including major television stations in Australia, USA, England, France, and Germany and the Film Finance Corporation of Australia.Read moreRead less
Rapid optimisation in underground mining network design. This project represents a major advance in the problem of optimising the infrastructure of underground mines and providing powerful planning tools for management. The software tools we are developing will prove important to the mining industry because of their accuracy, flexibility and generality. Not only can they be used for benchmarking in the design of specific mines, but they also provide a reliable method for testing the cost-benefi ....Rapid optimisation in underground mining network design. This project represents a major advance in the problem of optimising the infrastructure of underground mines and providing powerful planning tools for management. The software tools we are developing will prove important to the mining industry because of their accuracy, flexibility and generality. Not only can they be used for benchmarking in the design of specific mines, but they also provide a reliable method for testing the cost-benefit of emerging technologies. This is an important project for ensuring that Australia's mining industry remains efficient and internationally competitive. Given our economic dependence on mineral resources, it will also benefit Australia as a whole.Read moreRead less
Decision tools for underground mine development. The aim of this project is to develop innovative new strategic tools to assist senior mine management in planning underground mine operations. It will be based on modelling underground mine layouts using the theory of abstract mathematical networks. For many years, there have been well-developed methods of modelling and optimising the operation of open-cut mines. The design of the infrastructure of underground mines has a similar potential for opt ....Decision tools for underground mine development. The aim of this project is to develop innovative new strategic tools to assist senior mine management in planning underground mine operations. It will be based on modelling underground mine layouts using the theory of abstract mathematical networks. For many years, there have been well-developed methods of modelling and optimising the operation of open-cut mines. The design of the infrastructure of underground mines has a similar potential for optimisation and strategic modelling. This design optimisation will lead to huge savings in the costs of underground mines. Similar methods will be used to plan drilling programs, which are major cost items.Read moreRead less