ARDC Research Link Australia Research Link Australia   BETA Research
Link
Australia
  • ARDC Newsletter Subscribe
  • Contact Us
  • Home
  • About
  • Feedback
  • Explore Collaborations
2026 ARDC Annual Survey is now open!

The Australian Research Data Commons (ARDC) invites you to participate in a short survey about your interaction with the ARDC and use of our national research infrastructure and services. The survey will take approximately 5 minutes and is anonymous. It’s open to anyone who uses our digital research infrastructure services including Reasearch Link Australia.

We will use the information you provide to improve the national research infrastructure and services we deliver and to report on user satisfaction to the Australian Government’s National Collaborative Research Infrastructure Strategy (NCRIS) program.

Please take a few minutes to provide your input. The survey closes COB Friday 29 May 2026.

Complete the 5 min survey now by clicking on the link below.

Take Survey Now

Thank you.

  • Researcher
  • Funded Activity
  • Organisation
  • Researcher
  • Funded Activity
  • Organisation
  • Researcher
  • Funded Activity
  • Organisation

Need help searching? View our Search Guide.

Advanced Search

Current Selection
Research Topic : dose optimisation
Country : Australia
Socio-Economic Objective : Precious (Noble) Metal Ores
Clear All
Filter by Field of Research
Numerical and Computational Mathematics (3)
Optimisation (3)
Mining Engineering (2)
Operations Research (2)
Geomechanics (1)
Numerical Analysis (1)
Filter by Socio-Economic Objective
Precious (Noble) Metal Ores (3)
Other Non-Ferrous Ores (E.G. Copper, Zinc) (2)
Mathematical sciences (1)
Other (1)
Filter by Funding Provider
Australian Research Council (3)
Filter by Status
Closed (3)
Filter by Scheme
Linkage Projects (3)
Filter by Country
Australia (3)
Filter by Australian State/Territory
VIC (2)
WA (1)
  • Researchers (6)
  • Funded Activities (3)
  • Organisations (0)
  • Funded Activity

    Linkage Projects - Grant ID: LP0347881

    Funder
    Australian Research Council
    Funding Amount
    $71,099.00
    Summary
    A Robust Optimization Technique for Identifying Geomechanical Parameters Using In-situ Measurements. The aim of this project is to develop a robust optimisation technique for identifying geomechanical parameters for subsequent stability analysis of rock structures in particular open pits. The development involves a novel solution method based on current work in finite element method and large-scale optimisation with partial differential equation constraints. The outcomes of the project will prov .... A Robust Optimization Technique for Identifying Geomechanical Parameters Using In-situ Measurements. The aim of this project is to develop a robust optimisation technique for identifying geomechanical parameters for subsequent stability analysis of rock structures in particular open pits. The development involves a novel solution method based on current work in finite element method and large-scale optimisation with partial differential equation constraints. The outcomes of the project will provide a sophisticated numerical technique for geotechnical engineers/scientists to determine geomechanical parameters accurately from in-situ observation and displacement measurements, leading to the optimal design of rock structures in subsequent analysis.
    Read more Read less
    More information
    Funded Activity

    Linkage Projects - Grant ID: LP0882627

    Funder
    Australian Research Council
    Funding Amount
    $179,786.00
    Summary
    Rapid optimisation in underground mining network design. This project represents a major advance in the problem of optimising the infrastructure of underground mines and providing powerful planning tools for management. The software tools we are developing will prove important to the mining industry because of their accuracy, flexibility and generality. Not only can they be used for benchmarking in the design of specific mines, but they also provide a reliable method for testing the cost-benefi .... Rapid optimisation in underground mining network design. This project represents a major advance in the problem of optimising the infrastructure of underground mines and providing powerful planning tools for management. The software tools we are developing will prove important to the mining industry because of their accuracy, flexibility and generality. Not only can they be used for benchmarking in the design of specific mines, but they also provide a reliable method for testing the cost-benefit of emerging technologies. This is an important project for ensuring that Australia's mining industry remains efficient and internationally competitive. Given our economic dependence on mineral resources, it will also benefit Australia as a whole.
    Read more Read less
    More information
    Funded Activity

    Linkage Projects - Grant ID: LP0453632

    Funder
    Australian Research Council
    Funding Amount
    $248,259.00
    Summary
    Decision tools for underground mine development. The aim of this project is to develop innovative new strategic tools to assist senior mine management in planning underground mine operations. It will be based on modelling underground mine layouts using the theory of abstract mathematical networks. For many years, there have been well-developed methods of modelling and optimising the operation of open-cut mines. The design of the infrastructure of underground mines has a similar potential for opt .... Decision tools for underground mine development. The aim of this project is to develop innovative new strategic tools to assist senior mine management in planning underground mine operations. It will be based on modelling underground mine layouts using the theory of abstract mathematical networks. For many years, there have been well-developed methods of modelling and optimising the operation of open-cut mines. The design of the infrastructure of underground mines has a similar potential for optimisation and strategic modelling. This design optimisation will lead to huge savings in the costs of underground mines. Similar methods will be used to plan drilling programs, which are major cost items.
    Read more Read less
    More information

    Showing 1-3 of 3 Funded Activites

    Advanced Search

    Advanced search on the Researcher index.

    Advanced search on the Funded Activity index.

    Advanced search on the Organisation index.

    National Collaborative Research Infrastructure Strategy

    The Australian Research Data Commons is enabled by NCRIS.

    ARDC CONNECT NEWSLETTER

    Subscribe to the ARDC Connect Newsletter to keep up-to-date with the latest digital research news, events, resources, career opportunities and more.

    Subscribe

    Quick Links

    • Home
    • About Research Link Australia
    • Product Roadmap
    • Documentation
    • Disclaimer
    • Contact ARDC

    We acknowledge and celebrate the First Australians on whose traditional lands we live and work, and we pay our respects to Elders past, present and emerging.

    Copyright © ARDC. ACN 633 798 857 Terms and Conditions Privacy Policy Accessibility Statement
    Top
    Quick Feedback