Mechanisms for Pyrite Oxidation Control in Acid Mine Drainage. The annual costs of acid rock drainage (ARD) management at operating sites in Australia are $120M p.a.; over 15 years, a total cost of $1.8 billion for the whole industry. There are limitations to the ability of existing systems to cope with high capacity ARD, to the long-term effectiveness of these systems and high potential costs/liability of remediation. The value of the project outcomes to industry and government will be in reduc ....Mechanisms for Pyrite Oxidation Control in Acid Mine Drainage. The annual costs of acid rock drainage (ARD) management at operating sites in Australia are $120M p.a.; over 15 years, a total cost of $1.8 billion for the whole industry. There are limitations to the ability of existing systems to cope with high capacity ARD, to the long-term effectiveness of these systems and high potential costs/liability of remediation. The value of the project outcomes to industry and government will be in reduction of ARD release, well-understood long-term outcomes, reduced cost of treatments and improved control. The scale of these savings is in the tens of $M p.a. but also in potential improvements in environment (acid and toxic metals in streams), health and social quality of life in mining areas and towns.Read moreRead less
Evaluation of reaction mechanisms and products in acid rock drainage treatments. There are more than 54 sites in Australia managing major ARD wastes (either >10% of the waste or >10M tonnes) with another 62 sites with less ARD. At operating sites, the annual costs are $60M p.a.; over 15 years, a total cost of $900M for the whole industry. The value of the project outcomes to industry (and government) in reduction of acid and toxic metal release and reduced cost of treatments is potentially in th ....Evaluation of reaction mechanisms and products in acid rock drainage treatments. There are more than 54 sites in Australia managing major ARD wastes (either >10% of the waste or >10M tonnes) with another 62 sites with less ARD. At operating sites, the annual costs are $60M p.a.; over 15 years, a total cost of $900M for the whole industry. The value of the project outcomes to industry (and government) in reduction of acid and toxic metal release and reduced cost of treatments is potentially in the tens of $M p.a.. Improvements in environmental and social quality of life in mining areas and towns will also result from improved treatment.Read moreRead less
Australian Mineral Science Research Institute: Transformation of resource-based industries through the generation and application of new technologies. The research conducted within AMSRI will enable our existing resource-based industries to be transformed through the application of new technologies, helping to create an environmentally sustainable nation, a key national research priority. The research programs in energy efficient liberation, frugal water use and waste management, innovative proc ....Australian Mineral Science Research Institute: Transformation of resource-based industries through the generation and application of new technologies. The research conducted within AMSRI will enable our existing resource-based industries to be transformed through the application of new technologies, helping to create an environmentally sustainable nation, a key national research priority. The research programs in energy efficient liberation, frugal water use and waste management, innovative processing, material and interface science, advanced analysis and mathematics in minerals processing are of critical importance to Australia's major export industry. AMSRI will produce unique graduate students, educated in a multi-university, industry-linked research environment, who will provide a strong intellectual resource to both Australian industry and research institutions.Read moreRead less