Re-considering sustainable building and design: a cultural change approach. This project will help reduce the 38 per cent of all Australian waste that is produced by the construction industry by addressing the role of the building procurement team in reducing resource usage and eliminating waste. The outcomes of this research will address National Research Priority 1, An Environmentally Sustainable Australia.
Maximising the value of alliances in delivering infrastructure projects: a mixed methods management study of procurement innovation. Australia’s new infrastructure is currently being delivered inefficiently. The project will take a novel approach to improving efficiency, focusing on cooperation within construction teams. The project will develop new mechanisms to align incentives and capabilities within construction teams.
Greening procurement of infrastructure construction: optimising mass-haul operations to reduce greenhouse gas emissions. This project will develop and prototype tools to reduce the high environmental impact of mass haul operations in road and rail infrastructure projects. Both contractors and clients need practical methods for calculating, optimising and procuring optimal solutions, because mass haul is one of the few areas where a contractor can reduce carbon dioxide impact.
Assessing the adaptive capacity of hospital facilities to cope with climate-related extreme weather events: A risk management approach. Given Australia's and New Zealand's relatively high exposure to climate extremes, the social, economic and health benefits of better managed hospital facilities are significant. Floods, bushfires, heatwaves and cyclones cost Australia over $1.4bn/year and New Zealand over NZ$43m/yr in disruption to communities, business productivity and damage to infrastructure. ....Assessing the adaptive capacity of hospital facilities to cope with climate-related extreme weather events: A risk management approach. Given Australia's and New Zealand's relatively high exposure to climate extremes, the social, economic and health benefits of better managed hospital facilities are significant. Floods, bushfires, heatwaves and cyclones cost Australia over $1.4bn/year and New Zealand over NZ$43m/yr in disruption to communities, business productivity and damage to infrastructure. This research will help to mitigate these costs by protecting populations from the health risks associated with such events. The potential benefits will be most significant for those vulnerable communities at high risk such as the aged, the obese, the ill and those geographically exposed to more extreme weather events.Read moreRead less
Efficient construction: analysis of integrated supply chains for innovative off site housing manufacturing. The Australian housing industry is failing to meet demand. Housing construction is too slow, as indicated by a 40 per cent increase in average construction time over the last fifteen years. Industry fragmentation is an oft-cited cause of construction inefficiency. A solution is offsite manufacturing. Australia lags other countries in adoption of off-site manufacturing. To achieve adoption ....Efficient construction: analysis of integrated supply chains for innovative off site housing manufacturing. The Australian housing industry is failing to meet demand. Housing construction is too slow, as indicated by a 40 per cent increase in average construction time over the last fifteen years. Industry fragmentation is an oft-cited cause of construction inefficiency. A solution is offsite manufacturing. Australia lags other countries in adoption of off-site manufacturing. To achieve adoption and diffusion, fragmentation needs to be addressed. This project aims to analyse the factors affecting supply chain integration to support innovative offsite manufacturing and develop a novel collaborative practice based implementation model.Read moreRead less
Safe and healthy construction: the influence of clients in driving improvement through construction procurement and project management practices. The project will measure the impact that the construction industry's clients can exert over the workplace health and safety (WHS) performance of projects. The project will identify client actions that have a positive impact upon WHS and will help embed WHS management practices in the procurement of major infrastructure construction projects.
An experimental evaluation of the usefulness of computer-supported argumentation to improve occupational health and safety in construction design. The research investigates the potential for experts' occupational health and safety (OHS) reasoning to be reproduced in a knowledge-based system and used to: (i) augment the OHS decision-making of construction design professionals; and (ii) develop design OHS capability, especially in novices. The results will support the implementation of OHS policy ....An experimental evaluation of the usefulness of computer-supported argumentation to improve occupational health and safety in construction design. The research investigates the potential for experts' occupational health and safety (OHS) reasoning to be reproduced in a knowledge-based system and used to: (i) augment the OHS decision-making of construction design professionals; and (ii) develop design OHS capability, especially in novices. The results will support the implementation of OHS policy in the construction industry.Read moreRead less
Open Standards design for improved road network information exchange. Open Standards design for improved road network information exchange. This project aims to design a draft digital open source performance-based construction contract specification for delivering road construction information to operational network asset management. This will be a common information exchange specification for all road agencies to standardise exchange of their assets data. Road network construction and maintenan ....Open Standards design for improved road network information exchange. Open Standards design for improved road network information exchange. This project aims to design a draft digital open source performance-based construction contract specification for delivering road construction information to operational network asset management. This will be a common information exchange specification for all road agencies to standardise exchange of their assets data. Road network construction and maintenance costs $21 billion annually, but the outcome of this project is expected to save $65 to $130 million annually through data harmonisation. This project is at the leading edge of information management for roads and is expected to change several international standards.Read moreRead less