Erosion of embankment dams and dam spillways. In excess of $250M is spent annually to maintain, upgrade, improve safety and monitor performance of Australian dams. Improved methods for assessing both spillway and internal erosion, the cause of 50 per cent of embankment dam failures and incidents requiring repairs, will be developed, maximising dam safety and minimising maintenance expenditure.
Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechani ....Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechanisms of mud pumping, incorporating train loads and frequencies, will be studied, and the role of vertically installed drains will be quantified for improved practical design. The project aims to contribute to improved track longevity and reduced maintenance costs, with a corresponding boost in rail productivity.Read moreRead less
Mitigating the Severity of Level Crossing Accidents and Derailments. Ongoing increases in the number of level crossings and heavy road vehicles cause more frequent and severe level crossing accidents and derailments. Despite the use of active warning systems, each year, on average, 100 level crossing accidents occur in Australia. With a view to mitigating these crashes, this research aims to formulate theories for reduction in crash energy and effective wheel constraints to prevent derailment by ....Mitigating the Severity of Level Crossing Accidents and Derailments. Ongoing increases in the number of level crossings and heavy road vehicles cause more frequent and severe level crossing accidents and derailments. Despite the use of active warning systems, each year, on average, 100 level crossing accidents occur in Australia. With a view to mitigating these crashes, this research aims to formulate theories for reduction in crash energy and effective wheel constraints to prevent derailment by modifying the levels of road and rail crossings and providing guard rails in the recesses of these modified level crossings. The theories are intended be developed using nonlinear dynamic computational methods and laboratory experiments. The outcomes are expected to enable reduction in the severity of level crossing accidents and hence save lives and costs of derailment.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100133
Funder
Australian Research Council
Funding Amount
$400,000.00
Summary
National Facility for Physical Blast Simulation (NFPBS). Recent terrorist attacks employing large quantities of high explosives have prompted the international demand for experimental investigation of civil infrastructure response to shock wave loadings. The National Facility for Physical Blast Simulation (NFPBS) is one of only a few in the world that are suitable for conducting experimental research via a physically generated blast approach.
Data-driven water quality treatment management decision support system. Data-driven water quality treatment management decision support system. This project aims to develop a robust decision support system to predict manganese and the character and concentration of dissolved organic matter in drinking water reservoirs, using intelligent algorithms and data collected through remote autonomous instrumentation. These predicted water quality parameters could be used as model input variables to provi ....Data-driven water quality treatment management decision support system. Data-driven water quality treatment management decision support system. This project aims to develop a robust decision support system to predict manganese and the character and concentration of dissolved organic matter in drinking water reservoirs, using intelligent algorithms and data collected through remote autonomous instrumentation. These predicted water quality parameters could be used as model input variables to provide real-time decisions for plant operators on the required treatment regime for incoming raw water, and advise them on the optimal reservoir offtake depth. This will potentially minimise treatment costs and health risks for consumers. The ultimate goal is to significantly enhance current water supply management practices.Read moreRead less
Megadrought likelihood and its water resource impacts in Australia. This interdisciplinary project plans to assemble a world-class team of hydrologists, climate scientists and water managers to investigate the history and future risk of decadal to multidecadal droughts (megadroughts). Despite Australia’s vulnerability to water scarcity, the likelihood of persistent megadroughts has not been assessed in Australia. This has resulted in inadequate capacity to prepare for and adapt to megadrought un ....Megadrought likelihood and its water resource impacts in Australia. This interdisciplinary project plans to assemble a world-class team of hydrologists, climate scientists and water managers to investigate the history and future risk of decadal to multidecadal droughts (megadroughts). Despite Australia’s vulnerability to water scarcity, the likelihood of persistent megadroughts has not been assessed in Australia. This has resulted in inadequate capacity to prepare for and adapt to megadrought under future climate change. For the first time, palaeoclimate reconstructions and climate change projections will be used to constrain future hydroclimatic variability, advancing the decision-making capacity of Australian water resource managers.Read moreRead less
Smart management of disinfectant in chloraminated water-supply systems. Smart management of disinfectant in chloraminated water-supply systems. This project aims to develop an adaptive, real-time control system for managing disinfectant residuals in chloraminated water supply systems. While chloramine delivers microbiologically safe drinking water in warmer climates and in long distribution systems, it is largely unpredictable, costs water utilities millions of dollars annually, and has uncertai ....Smart management of disinfectant in chloraminated water-supply systems. Smart management of disinfectant in chloraminated water-supply systems. This project aims to develop an adaptive, real-time control system for managing disinfectant residuals in chloraminated water supply systems. While chloramine delivers microbiologically safe drinking water in warmer climates and in long distribution systems, it is largely unpredictable, costs water utilities millions of dollars annually, and has uncertain benefits. This project’s control system will be guided by quantitative models formulated from multi-pronged, fundamental experiments. The project will quantify microbial chloramine decay and determine mechanisms to increase predictability. The project will develop and demonstrate a real-time control technology which delivered microbiologically safe, cost-efficient drinking water to people in warmer climates, despite warming climate and increasing population.Read moreRead less