High Strength Steel Protection Bollards. Terrorist attacks cost Australians much human grief and millions of dollars. Prevention of an attack is paramount. Passive road bollards are commonly used to stop a vehicle approaching and/or entering security sensitive infrastructure. Thin-walled tubes are used to manufacture such bollards. However there is a lack of knowledge about their behaviour, and in particular high strength alloy steel bollards, when subjected to impact loads. The investigators wi ....High Strength Steel Protection Bollards. Terrorist attacks cost Australians much human grief and millions of dollars. Prevention of an attack is paramount. Passive road bollards are commonly used to stop a vehicle approaching and/or entering security sensitive infrastructure. Thin-walled tubes are used to manufacture such bollards. However there is a lack of knowledge about their behaviour, and in particular high strength alloy steel bollards, when subjected to impact loads. The investigators will apply their extensive knowledge in thin-walled tubular structures to establish the most economical means of designing high strength bollards. This knowledge will be transferred into design standards and Australia's limited defence resources.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE0228900
Funder
Australian Research Council
Funding Amount
$603,000.00
Summary
Testing facility for heavily loaded bridge and barrier systems. Government and industry are increasing truck masses from current single articulated 42.5 tonne trucks to 160 tonne multi-bogie trucks. This will provide Australia with over $1 billion of potential benefits and an efficient and competitive transport industry. To capture these benefits and further progress Australia's economy, considerable collaborative research on a number of fronts must be carried out investigating how bridges and b ....Testing facility for heavily loaded bridge and barrier systems. Government and industry are increasing truck masses from current single articulated 42.5 tonne trucks to 160 tonne multi-bogie trucks. This will provide Australia with over $1 billion of potential benefits and an efficient and competitive transport industry. To capture these benefits and further progress Australia's economy, considerable collaborative research on a number of fronts must be carried out investigating how bridges and barriers can perform safely when subjected to very heavy traffic and impact loads under laboratory and typical service conditions. This application seeks funds for establishing a unique hi-tech testing facility in Australia vital for advancing such infrastructure technology.Read moreRead less
Damage Tolerance Approach in Designing and Maintaining Truck Trailers. This project aims to develop a damage tolerance approach in designing and maintaining truck trailers. Combined with field test and computational simulation, machine learning will be used to generate loading spectrums. Following the damage tolerance philosophy, a mature approach in aerospace industry, the fatigue crack growth and the fatigue life will be predicted. In addition, structural optimisation will be applied in traile ....Damage Tolerance Approach in Designing and Maintaining Truck Trailers. This project aims to develop a damage tolerance approach in designing and maintaining truck trailers. Combined with field test and computational simulation, machine learning will be used to generate loading spectrums. Following the damage tolerance philosophy, a mature approach in aerospace industry, the fatigue crack growth and the fatigue life will be predicted. In addition, structural optimisation will be applied in trailer design. This project expects to revolutionize the design and maintenance practices in Australian truck trailer industry. It should provide significant benefits, such as prolonging the life cycle of truck trailers, reducing the tare weight and increasing operating profit, to both trailer producers and users.Read moreRead less
Special Research Initiatives - Grant ID: SR0354894
Funder
Australian Research Council
Funding Amount
$10,000.00
Summary
Innovative risk analysis, assessment, rehabilitation and strengthening of aging critical civil infrastructure. Much essential civil engineering infrastructure such as bridges, buildings, dams, pipelines and pavements was commissioned many decades ago, and sustaining the integrity of this infrastructure in developed nations as it ages is now considered to be a major challenge to the engineering and scientific community. Australia is not spared by the ramifications of its aging civil assets, and ....Innovative risk analysis, assessment, rehabilitation and strengthening of aging critical civil infrastructure. Much essential civil engineering infrastructure such as bridges, buildings, dams, pipelines and pavements was commissioned many decades ago, and sustaining the integrity of this infrastructure in developed nations as it ages is now considered to be a major challenge to the engineering and scientific community. Australia is not spared by the ramifications of its aging civil assets, and identification and rectification procedures that are often ad-hoc now represent a sizeable proportion of the GDP. This Research Network draws together the leading Australian research groups in engineering and applied mechanics in a coordinated program to address this most important cost to the community.Read moreRead less
Cementitious gel: the missing link in understanding the ageing of built infrastructure. Exposure of built reinforced concrete infrastructure to coastal environments causes premature ageing, unplanned remediation and reduced safety. Enhanced forecasting, achieved by advanced methods, including Helium Ion Microscopy and modeling interactions between cement gel, chloride and water, will deliver proactive management of ageing assets.
Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and red ....Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and reduction strategies prevails. This research aims to develop a theoretical model that can be used to develop robust containment and reduction strategies to mitigate the adverse economic, productivity and safety consequences that materialize from performing rework during the construction of mega transport projects.Read moreRead less