Novel test and design methods for base course reinforced flexible pavements. This project aims to develop the mechanics of geosynthetic-reinforced flexible pavements as an urgent need for the Australian pavement industry to build more sustainable and economical roads. Novel laboratory test apparatus and in-situ test programs, and mathematical models will be developed, for the first time, to capture the responses of reinforced base courses in a complete and optimised way to determine the paramete ....Novel test and design methods for base course reinforced flexible pavements. This project aims to develop the mechanics of geosynthetic-reinforced flexible pavements as an urgent need for the Australian pavement industry to build more sustainable and economical roads. Novel laboratory test apparatus and in-situ test programs, and mathematical models will be developed, for the first time, to capture the responses of reinforced base courses in a complete and optimised way to determine the parameters for pavement design and performance evaluation. The outcomes will enable reliable prediction of reinforced pavement behaviour, leading to better-performing geosynthetic products and more resilient pavements, reduced material usage and damage in pavements, and less environmental impact and maintenance cost.Read moreRead less
Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechani ....Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechanisms of mud pumping, incorporating train loads and frequencies, will be studied, and the role of vertically installed drains will be quantified for improved practical design. The project aims to contribute to improved track longevity and reduced maintenance costs, with a corresponding boost in rail productivity.Read moreRead less
Managing and mitigating social risks of major infrastructure projects. This project aims to reduce social risks of major infrastructure projects by generating an evidence-based social risk management framework. It brings together leading ANU researchers with top organisations in Australia's infrastructure sector, already working together via the ANU Institute for Infrastructure in Society. The project seeks to improve social risk management in a multi-billion dollar sector, vital to all Australi ....Managing and mitigating social risks of major infrastructure projects. This project aims to reduce social risks of major infrastructure projects by generating an evidence-based social risk management framework. It brings together leading ANU researchers with top organisations in Australia's infrastructure sector, already working together via the ANU Institute for Infrastructure in Society. The project seeks to improve social risk management in a multi-billion dollar sector, vital to all Australians. The project is significant because it adopts a sector-wide view to systematically define social risk, co-create a social risk management framework and implement it via a new social risk management toolkit. This should lessen harm to communities, reduce delays and costs and benefit national infrastructure delivery.Read moreRead less
Stable on-demand optimization for workforce and fleet logistics management. This project aims to conceive, develop and deploy innovative methodologies for stable on-demand workforce management and fleet logistics based on advanced decision-support systems. The outcome of this project will provide a new cloud-based real-time Optimisation Software-as-a-Service (OSaaS) platform that allows businesses to improve their productivity while reducing operating costs and their environmental footprint. Thi ....Stable on-demand optimization for workforce and fleet logistics management. This project aims to conceive, develop and deploy innovative methodologies for stable on-demand workforce management and fleet logistics based on advanced decision-support systems. The outcome of this project will provide a new cloud-based real-time Optimisation Software-as-a-Service (OSaaS) platform that allows businesses to improve their productivity while reducing operating costs and their environmental footprint. This is expected to support the manufacturing, retail, delivery and mobile fleets industries.Read moreRead less
Safety in the Heavy Vehicle Industry: A Collaborative Response. The management and regulation of heavy vehicles, particularly in relation to safety, is recognised as an urgent issue at all levels of government across Australia. In the absence of research that identifies the key determinants of heavy vehicle crashes, countermeasures will continue to be based on anecdote. The proposed study will determine the role key risk factors, namely scheduling and sleep-related factors, play in heavy vehicl ....Safety in the Heavy Vehicle Industry: A Collaborative Response. The management and regulation of heavy vehicles, particularly in relation to safety, is recognised as an urgent issue at all levels of government across Australia. In the absence of research that identifies the key determinants of heavy vehicle crashes, countermeasures will continue to be based on anecdote. The proposed study will determine the role key risk factors, namely scheduling and sleep-related factors, play in heavy vehicle crashes and will identify cost-effective strategies to reduce the growing economic burden associated with these crashes.Read moreRead less
Towards in-vehicle situation awareness using visual and audio sensors. This project aims to characterise driver awareness, activity and interactions with other vehicle occupants using visual and audio cues from internally mounted sensors. Road accidents cost Australia an estimated $30 billion per year and tragic loss of thousands of lives, yet the vast majority of severe vehicle crashes are linked to driver fatigue or distraction. The expected project outcomes include advanced artificial intelli ....Towards in-vehicle situation awareness using visual and audio sensors. This project aims to characterise driver awareness, activity and interactions with other vehicle occupants using visual and audio cues from internally mounted sensors. Road accidents cost Australia an estimated $30 billion per year and tragic loss of thousands of lives, yet the vast majority of severe vehicle crashes are linked to driver fatigue or distraction. The expected project outcomes include advanced artificial intelligence to infer and predict dangerous driver and passenger behaviour. This has the potential to significantly benefit society by advancing autonomous driving capabilities and reducing driver-induced accidents and fatalities, ensuring that every driver, passenger and pedestrian arrives home safely at the end of each day.Read moreRead less
Investigating Transport Disadvantage, Social Exclusion and Well Being in Metropolitan, Regional and Rural Victoria. This project strengthens national approaches to a pervasive Australian problem; fringe urban and rural communities who are excluded from life opportunities due to lack of transport. Evidence suggests this problem is growing as fuel costs rise, the population ages and rural/fringe urban migration continues. Australia spends Billions annually to address these issues but Australian ....Investigating Transport Disadvantage, Social Exclusion and Well Being in Metropolitan, Regional and Rural Victoria. This project strengthens national approaches to a pervasive Australian problem; fringe urban and rural communities who are excluded from life opportunities due to lack of transport. Evidence suggests this problem is growing as fuel costs rise, the population ages and rural/fringe urban migration continues. Australia spends Billions annually to address these issues but Australian research exploring the nature of behaviours and links between transport problems and life opportunities is limited. This project fills this important knowledge gap in an Australian project that will advance world knowledge in this growing international research field. Findings will better focus Australia's approach to increasingly challenging transport futures.Read moreRead less
Seismic analysis of cracking and deformations in concrete gravity dams. This project aims to establish a rational predictive capability for the responses of concrete gravity dams subject to extreme design earthquakes. This will include the development of innovative numerical methods for effective modelling of crack propagation and closure, large slips on crack faces and weak interfaces, dam-reservoir interaction, dam-foundation interaction and automatic mesh generation. The expected outcomes of ....Seismic analysis of cracking and deformations in concrete gravity dams. This project aims to establish a rational predictive capability for the responses of concrete gravity dams subject to extreme design earthquakes. This will include the development of innovative numerical methods for effective modelling of crack propagation and closure, large slips on crack faces and weak interfaces, dam-reservoir interaction, dam-foundation interaction and automatic mesh generation. The expected outcomes of the project will be a significantly improved prediction tool. It is also anticipated that the project will result in improvements in dam and public safety, and more efficient use of funds for dam safety upgrades and management.Read moreRead less
Rail Safety And Reliability: A Human Factors/Ergonomics Approach. Recent rail crashes have focussed rail operators and the public on issues of rail safety and reliabilty. The project is a major initiative that will assist the development of safer and more reliable rail operations through the application of human factors and ergonomics methods to the design of train control and management devices and systems.
Erosion of embankment dams and dam spillways. In excess of $250M is spent annually to maintain, upgrade, improve safety and monitor performance of Australian dams. Improved methods for assessing both spillway and internal erosion, the cause of 50 per cent of embankment dam failures and incidents requiring repairs, will be developed, maximising dam safety and minimising maintenance expenditure.