Industrial Transformation Research Hubs - Grant ID: IH180100010
Funder
Australian Research Council
Funding Amount
$4,918,357.00
Summary
ARC Research Hub for Smart Next Generation Transport Pavements. The ARC Research Hub for Smart Next Generation Transport Pavements aims to make road, airport and dockyard pavements smart, low cost, long-lasting, safe, green and adaptable to future transport demands. Australia’s road network, upon which the nation depends for its economic and social prosperity, is at risk due to increases in passenger and freight load degradation of the road network, and material and expertise scarcity. The Hub w ....ARC Research Hub for Smart Next Generation Transport Pavements. The ARC Research Hub for Smart Next Generation Transport Pavements aims to make road, airport and dockyard pavements smart, low cost, long-lasting, safe, green and adaptable to future transport demands. Australia’s road network, upon which the nation depends for its economic and social prosperity, is at risk due to increases in passenger and freight load degradation of the road network, and material and expertise scarcity. The Hub will deliver new materials and modelling, smart construction, and rehabilitation systems required for future demands, while enhancing road safety and reducing environmental impact.
Read moreRead less
Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and red ....Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and reduction strategies prevails. This research aims to develop a theoretical model that can be used to develop robust containment and reduction strategies to mitigate the adverse economic, productivity and safety consequences that materialize from performing rework during the construction of mega transport projects.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE0228900
Funder
Australian Research Council
Funding Amount
$603,000.00
Summary
Testing facility for heavily loaded bridge and barrier systems. Government and industry are increasing truck masses from current single articulated 42.5 tonne trucks to 160 tonne multi-bogie trucks. This will provide Australia with over $1 billion of potential benefits and an efficient and competitive transport industry. To capture these benefits and further progress Australia's economy, considerable collaborative research on a number of fronts must be carried out investigating how bridges and b ....Testing facility for heavily loaded bridge and barrier systems. Government and industry are increasing truck masses from current single articulated 42.5 tonne trucks to 160 tonne multi-bogie trucks. This will provide Australia with over $1 billion of potential benefits and an efficient and competitive transport industry. To capture these benefits and further progress Australia's economy, considerable collaborative research on a number of fronts must be carried out investigating how bridges and barriers can perform safely when subjected to very heavy traffic and impact loads under laboratory and typical service conditions. This application seeks funds for establishing a unique hi-tech testing facility in Australia vital for advancing such infrastructure technology.Read moreRead less
Asset Intelligence: Maximising Operational Effectiveness for Digital Era . The primary aim of this project is to develop an innovative lifecycle semantic–based decision making approach through asset intelligence so as to maximize the operational effectiveness maintenance, repair and rehabilitation planning of infrastructure assets, such as concrete pavement. The research intends to address an important gap by providing logical formalisms and real-time capability to life-cycle asset information t ....Asset Intelligence: Maximising Operational Effectiveness for Digital Era . The primary aim of this project is to develop an innovative lifecycle semantic–based decision making approach through asset intelligence so as to maximize the operational effectiveness maintenance, repair and rehabilitation planning of infrastructure assets, such as concrete pavement. The research intends to address an important gap by providing logical formalisms and real-time capability to life-cycle asset information through computational intelligence. The expected outcome will be an intelligent asset management platform that provides structured and semantically enriched lifecycle asset information for optimised solutions to help reduce the cost, time and effort in asset information storage and retrieval, and decision-making. Read moreRead less
Structural Fuses for Safer and More Economical Bridge Construction. This project aims to develop a novel structural system leading to more economical concrete bridge construction by utilising a customised structural fuse. A significant margin of safety is required in structural design to account for accidental over-loading and to reduce the risk of structural collapse. Such a margin leads to more material usage. Incorporation of a fuse into the structure that is triggered upon over-loading will ....Structural Fuses for Safer and More Economical Bridge Construction. This project aims to develop a novel structural system leading to more economical concrete bridge construction by utilising a customised structural fuse. A significant margin of safety is required in structural design to account for accidental over-loading and to reduce the risk of structural collapse. Such a margin leads to more material usage. Incorporation of a fuse into the structure that is triggered upon over-loading will cause a safer failure mode and prohibit further increase of loading, both of which result in a reduced structure without undermining safety. The project is expected to advance structural theory, and also provide significant benefits to the construction industry via cost reduction and more eco-friendly constructions.Read moreRead less
Bridge performance assessment through advanced sensing and modelling. Bridge performance assessment through advanced sensing and modelling. This project aims to create cyber infrastructure to manage and maintain civil infrastructure, specifically bridges. Current sensor data interpretation approaches are not good at assessing the performance of civil infrastructure or evaluating the reserve capacity; in particular, they do not adequately account for high levels of systematic modelling uncertaint ....Bridge performance assessment through advanced sensing and modelling. Bridge performance assessment through advanced sensing and modelling. This project aims to create cyber infrastructure to manage and maintain civil infrastructure, specifically bridges. Current sensor data interpretation approaches are not good at assessing the performance of civil infrastructure or evaluating the reserve capacity; in particular, they do not adequately account for high levels of systematic modelling uncertainties. This project intends to ease the current scientific data interpretation bottleneck. Expected outcomes are better infrastructure management and maintenance planning, fewer redundant interventions, modified infrastructure and improved future design.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100028
Funder
Australian Research Council
Funding Amount
$300,000.00
Summary
A national facility for in situ testing of soft soils. A mobile in situ testing laboratory will permit the investigation of devices for measuring geotechnical conditions on soft and swampy sites which are often being encountered on key infrastructure projects. The new facility will improve the modelling and testing of soft soils and ensure the safe and economic development of Australian infrastructure.
A complex systems approach to granular rheology: interconnecting topology, stability, dynamics and function. The response of granular materials (e.g. soil, rocks) to applied stresses and strains will be characterised in detail. Information mined from experimental and simulation tests will be used to develop robust predictive models of granular behaviour, crucial for effective earthquake mitigation as well as greener mining and construction technologies.
Fatigue Strengthening of Metallic Bridges using Carbon Fibre Reinforced Polymer System. A large number of metallic structures such as bridges, offshore platforms and large mining equipment are aging. Retrofitting such structures is becoming increasingly important in the 21st century. Using an advanced material, Carbon Fibre Reinforced Polymer (CFRP), to strengthen metallic structures is very promising. This project aims to develop reliable CFRP strengthening systems for aging metallic bridges. I ....Fatigue Strengthening of Metallic Bridges using Carbon Fibre Reinforced Polymer System. A large number of metallic structures such as bridges, offshore platforms and large mining equipment are aging. Retrofitting such structures is becoming increasingly important in the 21st century. Using an advanced material, Carbon Fibre Reinforced Polymer (CFRP), to strengthen metallic structures is very promising. This project aims to develop reliable CFRP strengthening systems for aging metallic bridges. It aims to make a breakthrough in understanding of the fatigue crack propagation in CFRP-metal composite system under combined loading. It intends also to produce practical guidelines for engineers to strengthen aging metallic bridges.Read moreRead less
ARC Centre of Excellence for Geotechnical Science and Engineering. To pioneer new scientific approaches for geotechnical design of Australia's energy and transport infrastructure. Australia will spend over $250 billion during the next five years on the provision of physical infrastructure for energy and transport, which is the critical importance to the nation's future prosperity. The Centre for Geotechnical Science and Engineering will develop new computational and experimental approaches to un ....ARC Centre of Excellence for Geotechnical Science and Engineering. To pioneer new scientific approaches for geotechnical design of Australia's energy and transport infrastructure. Australia will spend over $250 billion during the next five years on the provision of physical infrastructure for energy and transport, which is the critical importance to the nation's future prosperity. The Centre for Geotechnical Science and Engineering will develop new computational and experimental approaches to underpin the geotechnical design of this infrastructure and provide a national focus for geotechnical research. New scientific approaches and software for designing cheaper and safer infrastructure in the energy and transport sectors.Read moreRead less