Framework for a cost-effective geohazard assessment. Framework for a cost-effective geohazard assessment. This project aims to develop and validate a new, robust and cost-effective method for geotechnical hazard assessment of rock slopes. Each year in Australia, millions of dollars are spent on stabilising unstable slopes and mitigation measures to control the associated risk and avoid severe financial impacts. The proposed framework will combine a new qualitative approach for geotechnical hazar ....Framework for a cost-effective geohazard assessment. Framework for a cost-effective geohazard assessment. This project aims to develop and validate a new, robust and cost-effective method for geotechnical hazard assessment of rock slopes. Each year in Australia, millions of dollars are spent on stabilising unstable slopes and mitigation measures to control the associated risk and avoid severe financial impacts. The proposed framework will combine a new qualitative approach for geotechnical hazard assessment with accurate, efficient geo-structural surveys achieved with emerging surveying technologies. Stochastic components of slope geostructural description should minimise the surveying operations. This project is expected to reduce the cost and time of surveying geostructural features of slopes and designing mitigation measures.Read moreRead less
Discovery Early Career Researcher Award - Grant ID: DE190100657
Funder
Australian Research Council
Funding Amount
$330,000.00
Summary
Improving mental health and safety in the construction industry. This project aims to quantify the interdependencies of the psychosocial risk factors the construction workforce is exposed to and contribute to developing strategies for improving the mental health and safety of the Australian construction industry. The suicide rate of Australian construction workers is 84 per cent higher than non-construction workers due to the high psychosocial risks involved. The quantification of these psychoso ....Improving mental health and safety in the construction industry. This project aims to quantify the interdependencies of the psychosocial risk factors the construction workforce is exposed to and contribute to developing strategies for improving the mental health and safety of the Australian construction industry. The suicide rate of Australian construction workers is 84 per cent higher than non-construction workers due to the high psychosocial risks involved. The quantification of these psychosocial risk factors and their interdependencies will enable effective strategies to be designed. The long-term impacts of this project include improving the mental health of the construction workforce, reducing suicide rates and mental health work compensation, enhancing employee productivity, and reducing accidents and injuries. This project will make Australia a global leader in mental health and safety of the construction industry.Read moreRead less
Sustainable retirement villages for Ageing Australians. This project aims to deliver sustainable retirement villages to better accommodate older Australians and assess their effects on the growth of the retirement village industry. More organisations and governments globally are embracing sustainable development, but the Australian retirement village industry has been largely static and unresponsive; it has not yet met the green movement’s challenge to provide a sustainable living environment fo ....Sustainable retirement villages for Ageing Australians. This project aims to deliver sustainable retirement villages to better accommodate older Australians and assess their effects on the growth of the retirement village industry. More organisations and governments globally are embracing sustainable development, but the Australian retirement village industry has been largely static and unresponsive; it has not yet met the green movement’s challenge to provide a sustainable living environment for senior citizens. This project is expected to improve the living environment of retirement villages and the quality of life of older Australians.Read moreRead less
Urban flood modelling at speed and scale. Frequent floods in urban areas cause damages comparable to extreme floods. This is likely to intensify with future urbanisation and climate change. Although Water Sensitive Urban Design (WSUD) offers sustainable urban drainage solutions, there are no models that can select an optimal WSUD system to deliver on a set urban flood mitigation target. The project aims to develop a new generation of fast urban flood models and the-first-of-its-kind WSUD plannin ....Urban flood modelling at speed and scale. Frequent floods in urban areas cause damages comparable to extreme floods. This is likely to intensify with future urbanisation and climate change. Although Water Sensitive Urban Design (WSUD) offers sustainable urban drainage solutions, there are no models that can select an optimal WSUD system to deliver on a set urban flood mitigation target. The project aims to develop a new generation of fast urban flood models and the-first-of-its-kind WSUD planning tool to support industry and governments to effectively reduce the urban flooding damages. The project outcomes are also applicable for advancing early warning systems and real-time control of floods.Read moreRead less
Industrial Transformation Research Hubs - Grant ID: IH200100010
Funder
Australian Research Council
Funding Amount
$5,000,000.00
Summary
ARC Research Hub for Transformation of Reclaimed Waste Resources to Engineered Materials and Solutions for a Circular Economy. This project aims to create new knowledge to reduce waste going to landfills and transform reclaimed waste into new materials for use in construction and other manufacturing sectors. It integrates multisector input and multidisciplinary academic research to address ten challenging waste streams. Expected outcomes are smart materials, socio-technical change, accelerated t ....ARC Research Hub for Transformation of Reclaimed Waste Resources to Engineered Materials and Solutions for a Circular Economy. This project aims to create new knowledge to reduce waste going to landfills and transform reclaimed waste into new materials for use in construction and other manufacturing sectors. It integrates multisector input and multidisciplinary academic research to address ten challenging waste streams. Expected outcomes are smart materials, socio-technical change, accelerated testing methods, predictive modeling, circular life cycle costing and a trusted evidence base. Outcomes will lead to commercial benefits as well as jobs and a significant contribution to addressing the pressing environmental impacts of waste production, management, and re-use.Read moreRead less
Hydraulic erosion of granular structures: experiments and computational simulations. Erosion due to hydraulic forces causes vast damage to infrastructure and buildings in Australia and overseas. The project aims to improve the predictability and controllability of flooding related disasters caused by erosion. The project involves experiments as well as cutting edge computer simulations.
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE0883080
Funder
Australian Research Council
Funding Amount
$490,000.00
Summary
Detection of Trace Concentrations of Chemical Contaminants in Urban Water Systems. Water is a critical resource in Australia and as pressures on water resources increase, water recycling is becoming more prevalent. The presence of chemical contaminants such as low concentrations (ng/L) of pharmaceutically active compounds (PhACs), endocrine disrupters (EDCs) and other organic micropollutants in the aquatic environment has received much attention around the world including Australia due to their ....Detection of Trace Concentrations of Chemical Contaminants in Urban Water Systems. Water is a critical resource in Australia and as pressures on water resources increase, water recycling is becoming more prevalent. The presence of chemical contaminants such as low concentrations (ng/L) of pharmaceutically active compounds (PhACs), endocrine disrupters (EDCs) and other organic micropollutants in the aquatic environment has received much attention around the world including Australia due to their potential biological impact in urban water systems. The proposed equipment aims to establish analytical techniques and instrumental capacity for the selective analysis of chemical contaminants in order to improve our understanding of the fate of these compounds through different urban water systems.Read moreRead less
Optimising dissolved air flotation (DAF) for algae removal by bubble modification in drinking water and advanced wastewater systems. Algal blooms in potable water reservoirs and advanced wastewater treatment lagoons can impact the performance and economic viability of water treatment processes resulting in taste and odour episodes and the risk of algal toxins as well as causing further limitation to already stressed water resources in Australia. This project aims to develop an adaptation of the ....Optimising dissolved air flotation (DAF) for algae removal by bubble modification in drinking water and advanced wastewater systems. Algal blooms in potable water reservoirs and advanced wastewater treatment lagoons can impact the performance and economic viability of water treatment processes resulting in taste and odour episodes and the risk of algal toxins as well as causing further limitation to already stressed water resources in Australia. This project aims to develop an adaptation of the dissolved air flotation process that is already used for algae treatment that will provide a more robust, economic and sustainable barrier to algal cells in accordance with the Australian Drinking and Recycled Water Guidelines.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100089
Funder
Australian Research Council
Funding Amount
$500,000.00
Summary
Performance level structural testing facility. A structural testing facility is proposed for the new Advanced Engineering Building at The University of Queensland. The focus of the research supported by this facility will ensure the functionality of Australia’s infrastructure resources and the development of new engineering solutions that will enhance the country’s long-term economic growth.
Bridge performance assessment through advanced sensing and modelling. Bridge performance assessment through advanced sensing and modelling. This project aims to create cyber infrastructure to manage and maintain civil infrastructure, specifically bridges. Current sensor data interpretation approaches are not good at assessing the performance of civil infrastructure or evaluating the reserve capacity; in particular, they do not adequately account for high levels of systematic modelling uncertaint ....Bridge performance assessment through advanced sensing and modelling. Bridge performance assessment through advanced sensing and modelling. This project aims to create cyber infrastructure to manage and maintain civil infrastructure, specifically bridges. Current sensor data interpretation approaches are not good at assessing the performance of civil infrastructure or evaluating the reserve capacity; in particular, they do not adequately account for high levels of systematic modelling uncertainties. This project intends to ease the current scientific data interpretation bottleneck. Expected outcomes are better infrastructure management and maintenance planning, fewer redundant interventions, modified infrastructure and improved future design.Read moreRead less