ARDC Research Link Australia Research Link Australia   BETA Research
Link
Australia
  • ARDC Newsletter Subscribe
  • Contact Us
  • Home
  • About
  • Feedback
  • Explore Collaborations
  • Researcher
  • Funded Activity
  • Organisation
  • Researcher
  • Funded Activity
  • Organisation
  • Researcher
  • Funded Activity
  • Organisation

Need help searching? View our Search Guide.

Advanced Search

Current Selection
Scheme : Linkage Projects
Research Topic : Mathematical model
Field of Research : Optimisation
Clear All
Filter by Field of Research
Optimisation (5)
Numerical and Computational Mathematics (3)
Operations Research (3)
Applied Hydrology (Drainage, Flooding, Irrigation, Quality, Etc.) (1)
Applied Mathematics (1)
Applied Mathematics not elsewhere classified (1)
Applied Statistics (1)
Architecture (1)
Computation Theory And Mathematics Not Elsewhere Classified (1)
Geomechanics (1)
Interior And Environmental Design (1)
Numerical Analysis (1)
Filter by Socio-Economic Objective
Mathematical sciences (4)
Application packages (1)
Commercial (1)
Computer software and services not elsewhere classified (1)
Energy Conservation and Efficiency in Transport (1)
Expanding Knowledge in the Mathematical Sciences (1)
Land and water management (1)
Mining machinery and equipment (1)
Other (1)
Precious (Noble) Metal Ores (1)
Filter by Funding Provider
Australian Research Council (5)
Filter by Status
Closed (5)
Filter by Scheme
Linkage Projects (5)
Filter by Country
Australia (5)
Filter by Australian State/Territory
VIC (2)
WA (2)
SA (1)
  • Researchers (37)
  • Funded Activities (5)
  • Organisations (25)
  • Funded Activity

    Linkage Projects - Grant ID: LP0347881

    Funder
    Australian Research Council
    Funding Amount
    $71,099.00
    Summary
    A Robust Optimization Technique for Identifying Geomechanical Parameters Using In-situ Measurements. The aim of this project is to develop a robust optimisation technique for identifying geomechanical parameters for subsequent stability analysis of rock structures in particular open pits. The development involves a novel solution method based on current work in finite element method and large-scale optimisation with partial differential equation constraints. The outcomes of the project will prov .... A Robust Optimization Technique for Identifying Geomechanical Parameters Using In-situ Measurements. The aim of this project is to develop a robust optimisation technique for identifying geomechanical parameters for subsequent stability analysis of rock structures in particular open pits. The development involves a novel solution method based on current work in finite element method and large-scale optimisation with partial differential equation constraints. The outcomes of the project will provide a sophisticated numerical technique for geotechnical engineers/scientists to determine geomechanical parameters accurately from in-situ observation and displacement measurements, leading to the optimal design of rock structures in subsequent analysis.
    Read more Read less
    More information
    Funded Activity

    Linkage Projects - Grant ID: LP0669752

    Funder
    Australian Research Council
    Funding Amount
    $156,000.00
    Summary
    Using global optimization technique to determine the most efficient use of building/floor space to accommodate a given office design. The commercial property market is one of the largest business markets, both in Australia and globally. Businesses of all kinds use commercial office space, which represents many billions of investment dollars. A better understanding of what constitutes efficient and effective office space would produce enormous commercial benefits for this country. Historically, .... Using global optimization technique to determine the most efficient use of building/floor space to accommodate a given office design. The commercial property market is one of the largest business markets, both in Australia and globally. Businesses of all kinds use commercial office space, which represents many billions of investment dollars. A better understanding of what constitutes efficient and effective office space would produce enormous commercial benefits for this country. Historically, very little (if any) consideration has been given to the efficiency of office space design. The measurement of efficiency has now become an essential component of 'site selection'. To date, the application of optimization methodologies have not been applied to the architectural industry, making the development of tools to address this problem a significant and innovative move.
    Read more Read less
    More information
    Funded Activity

    Linkage Projects - Grant ID: LP0990908

    Funder
    Australian Research Council
    Funding Amount
    $180,000.00
    Summary
    Integrating dynamic and optimization models for efficient pipeline system operations in an evolving water and energy market. Developing an integrated dynamical and optimisation model for a piped water distribution system will advance Australia's capacity to deploy the most recent optimisation approaches to achieve the high level of efficiency required in the delivery of water to dryland regions. The outcomes of this project will be readily transferable to other regions and indeed other water d .... Integrating dynamic and optimization models for efficient pipeline system operations in an evolving water and energy market. Developing an integrated dynamical and optimisation model for a piped water distribution system will advance Australia's capacity to deploy the most recent optimisation approaches to achieve the high level of efficiency required in the delivery of water to dryland regions. The outcomes of this project will be readily transferable to other regions and indeed other water distribution systems. This will provide capability in securing Australia's water supplies and delivery systems. There may also be associated benefits to other pipeline operators in the oil and gas industries.
    Read more Read less
    More information
    Funded Activity

    Linkage Projects - Grant ID: LP110100136

    Funder
    Australian Research Council
    Funding Amount
    $540,000.00
    Summary
    Saving energy on trains - demonstration, evaluation, integration. Reducing energy use from rail transport will significantly contribute to cutting carbon dioxide emissions. This project will develop a toolkit to facilitate the introduction of in-cab technologies that help train drivers save energy and stay on time. The toolkit will make it easier to demonstrate, evaluate and integrate the system in a range of railways.
    More information
    Funded Activity

    Linkage Projects - Grant ID: LP0454362

    Funder
    Australian Research Council
    Funding Amount
    $70,668.00
    Summary
    Application of Optimisation Techniques to the Truck/Loader Selection Problem in Mining. Australia has world class deposits of most major mineral commodities and is a major producer and exporter of coal and many metals. The mining industry has an annual turnover of around $40 billion. A significant component (up to 55%) of mining costs is material handling. This project aims to develop computational tools for determining the best selection of trucks and loaders for the mining operation. To da .... Application of Optimisation Techniques to the Truck/Loader Selection Problem in Mining. Australia has world class deposits of most major mineral commodities and is a major producer and exporter of coal and many metals. The mining industry has an annual turnover of around $40 billion. A significant component (up to 55%) of mining costs is material handling. This project aims to develop computational tools for determining the best selection of trucks and loaders for the mining operation. To date this important problem has not been addressed. Our strategy is to develop accurate mathematical models and cutting edge optimisation techniques for their solution. The research outcomes will have significant outcomes for the mining industry.
    Read more Read less
    More information

    Showing 1-5 of 5 Funded Activites

    Advanced Search

    Advanced search on the Researcher index.

    Advanced search on the Funded Activity index.

    Advanced search on the Organisation index.

    National Collaborative Research Infrastructure Strategy

    The Australian Research Data Commons is enabled by NCRIS.

    ARDC CONNECT NEWSLETTER

    Subscribe to the ARDC Connect Newsletter to keep up-to-date with the latest digital research news, events, resources, career opportunities and more.

    Subscribe

    Quick Links

    • Home
    • About Research Link Australia
    • Product Roadmap
    • Documentation
    • Disclaimer
    • Contact ARDC

    We acknowledge and celebrate the First Australians on whose traditional lands we live and work, and we pay our respects to Elders past, present and emerging.

    Copyright © ARDC. ACN 633 798 857 Terms and Conditions Privacy Policy Accessibility Statement
    Top
    Quick Feedback