Life Cycle Measures of Cost Effectiveness for 4 D CAD in Design and Construct Projects across Industry Sectors. The effective and efficient delivery of complex construction projects will be transformed by the increased application of virtual design and construction technologies, including 4D CAD. By combining a 3D computer model of a design with the time dimension of the construction schedule, 4D CAD enables risks and opportunities to be better managed during the design phase and hence avoid co ....Life Cycle Measures of Cost Effectiveness for 4 D CAD in Design and Construct Projects across Industry Sectors. The effective and efficient delivery of complex construction projects will be transformed by the increased application of virtual design and construction technologies, including 4D CAD. By combining a 3D computer model of a design with the time dimension of the construction schedule, 4D CAD enables risks and opportunities to be better managed during the design phase and hence avoid costly issues during construction. However this requires addition design costs which currently represent a barrier to the uptake of this transforming technology. This project will overcome this by developing a flexible framework that allows the benefits gained across the life cycle of a project through using 4D CAD to be set against the additional costs and thus make this emerging technology more attractive to industry. Significantly this research will be based on comparative cases studies across different industry sectors including civil, building, and process engineering.Read moreRead less
The design and construction of quality, sustainable and affordable pre-made housing in Australia - optimisation and integration. Historically, industrialised construction has resulted in an industrialisation of the parts, rather than an industrialisation of the ensemble. In contrast, this project will integrate architecture and engineering, as well as construction and development to optimise the ensemble, and deliver architectural quality in industrially produced affordable housing.
Incorporating Design Management Culture within the Total Project Management Process: a Socio-technical Approach. New project delivery methods (e.g. design & construct; alliance contracting) in major commercial and infrastructure projects have the potential to dramatically increase the value added to clients and the wider community.
However to realise this potential, we need to better understand those socio-technical factors that foster an effective design management culture within tradition ....Incorporating Design Management Culture within the Total Project Management Process: a Socio-technical Approach. New project delivery methods (e.g. design & construct; alliance contracting) in major commercial and infrastructure projects have the potential to dramatically increase the value added to clients and the wider community.
However to realise this potential, we need to better understand those socio-technical factors that foster an effective design management culture within traditional construction companies, especially their knowledge sharing culture.
This project will develop and test an innovative research methodology that blends approaches from the social sciences and engineering. The findings regarding design management will have wide applicability to industry and cover civil, building, mining and process engineering projects, each of which has its own culture.Read moreRead less
Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce ....Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce the financial burden placed on taxpayers for cost overruns experienced as well as improve the profitability of organisations. This will lead to greater investment, and contribution to gross domestic product.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE110100052
Funder
Australian Research Council
Funding Amount
$870,000.00
Summary
Hybrid testing facility for structures under extreme loads. This unique testing facility will provide a regional and national focus for large three dimensional static and dynamic testing of components, systems and infrastructure used in civil engineering, mining and railways as well as in the aerospace and automotive industries.