Real-time scheduling of trains to control peak electricity demand. This project aims to develop new scheduling and control methods that will enable railways to reduce their demand for electricity during peak demand periods, without undue disruption to the timetable.
These new methods and systems will integrate with—and expand the capabilities of—an Australian train control system that is used by railways around the world. This will enable better management of electricity within a region and be ....Real-time scheduling of trains to control peak electricity demand. This project aims to develop new scheduling and control methods that will enable railways to reduce their demand for electricity during peak demand periods, without undue disruption to the timetable.
These new methods and systems will integrate with—and expand the capabilities of—an Australian train control system that is used by railways around the world. This will enable better management of electricity within a region and better use of renewable energy sources, with significant cost savings for railways and the wider community.Read moreRead less
Structured barrier and penalty functions in infinite dimensional optimisation and analysis. Very large scale tightly-constrained optimisation problems are ubiquitous and include water management, traffic flow, and imaging at telescopes and hospitals. Massively parallel computers can solve such problems and provide physically realisable solution only if subtle design issues are mastered. Resolving such issues is the goal of this project.