Special Research Initiatives - Grant ID: SR0354551
Funder
Australian Research Council
Funding Amount
$20,000.00
Summary
ARC Research Network for Renewable Energy. The proposed Research Network will integrate and coordinate the entire research field of renewable energy in Australia. This Network covers a diverse range of technologies, and includes all prominent researchers in the area of renewable energy in Australia. The Network is strengthened by the inclusion of key people from government agencies, industry, industry associations and international research organisations.
Australia is a leading player in the ....ARC Research Network for Renewable Energy. The proposed Research Network will integrate and coordinate the entire research field of renewable energy in Australia. This Network covers a diverse range of technologies, and includes all prominent researchers in the area of renewable energy in Australia. The Network is strengthened by the inclusion of key people from government agencies, industry, industry associations and international research organisations.
Australia is a leading player in the world's renewable energy industry. An effective structure for networking and for the exchange of people, information and research results will maintain and improve Australia's position in this rapidly growing industry.Read moreRead less
Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechani ....Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechanisms of mud pumping, incorporating train loads and frequencies, will be studied, and the role of vertically installed drains will be quantified for improved practical design. The project aims to contribute to improved track longevity and reduced maintenance costs, with a corresponding boost in rail productivity.Read moreRead less
Industrial Transformation Research Hubs - Grant ID: IH190100009
Funder
Australian Research Council
Funding Amount
$3,317,500.00
Summary
ARC Research Hub for Microrecycling of battery and consumer wastes . This project aims to transform Australia’s waste and resource recovery industry by equipping it with scientifically developed advanced manufacturing capability, focusing on small-scale processing of materials produced from battery and consumer wastes which would otherwise mostly end up in landfill. The project will deliver new knowledge in high-temperature reactions of waste and selective synthesis techniques to transform waste ....ARC Research Hub for Microrecycling of battery and consumer wastes . This project aims to transform Australia’s waste and resource recovery industry by equipping it with scientifically developed advanced manufacturing capability, focusing on small-scale processing of materials produced from battery and consumer wastes which would otherwise mostly end up in landfill. The project will deliver new knowledge in high-temperature reactions of waste and selective synthesis techniques to transform waste into valuable materials and products, including metallic alloys, oxides and carbon. Expected outcomes include industry adoption of commercially viable technology and processes where low value or complex waste is reformed into higher value materials, creating jobs and significant environmental and social benefits.Read moreRead less
Synthesis of Activated Carbon Supported Zero Valent Iron Nanoparticles and Application to Contaminant Degradation in Benthic Sediments. Sediment contamination is a major problem in harbours and estuaries around Australia. For example, in Sydney Harbour, a total fishing ban has been implemented as a result of excessive levels of dioxins and benzofurans in fish tissues. There is also concern at the possibility of large scale contamination of Botany Bay as a result of historic industrial activity a ....Synthesis of Activated Carbon Supported Zero Valent Iron Nanoparticles and Application to Contaminant Degradation in Benthic Sediments. Sediment contamination is a major problem in harbours and estuaries around Australia. For example, in Sydney Harbour, a total fishing ban has been implemented as a result of excessive levels of dioxins and benzofurans in fish tissues. There is also concern at the possibility of large scale contamination of Botany Bay as a result of historic industrial activity around the Bay. While dredging and on-land treatment of sediments is being adopted at the most severely contaminated sites, the cost of this approach is exorbitant. For sites where removal of contaminated sediments cannot be justified, the approach proposed in this study of a technology that entraps contaminants and enhances their in situ biodegradation is potentially a way forward.Read moreRead less
The role of location on the effectiveness of smoke alarms. Smoke alarms in buildings are required by the Building Code of Australia (BCA), but the current requirements are less than optimal. This project will provide the basis for optimisation of smoke alarms and the number, interconnection and positioning of smoke alarms in residential buildings. This is expected to lead to reductions in fire fatalities, injuries and property loss.
Controlling arsenic to unlock value in gold and copper resources. This project aims to characterise the transformation of arsenic between oxidation states during mineral processing. Up to one third of the world’s gold reserves are locked up in arsenic rich minerals and 5000 tonnes of arsenic is released annually from mine waste. The project will enable the development of process technology that immobilises and removes arsenic at the earliest possible stage. The use of novel time-resolved in-situ ....Controlling arsenic to unlock value in gold and copper resources. This project aims to characterise the transformation of arsenic between oxidation states during mineral processing. Up to one third of the world’s gold reserves are locked up in arsenic rich minerals and 5000 tonnes of arsenic is released annually from mine waste. The project will enable the development of process technology that immobilises and removes arsenic at the earliest possible stage. The use of novel time-resolved in-situ techniques proposed in this research will give vital information of the complex chemical pathways involved during processing which current characterization methods on pre- and post-processed species do not achieve.Read moreRead less
Seismic analysis of cracking and deformations in concrete gravity dams. This project aims to establish a rational predictive capability for the responses of concrete gravity dams subject to extreme design earthquakes. This will include the development of innovative numerical methods for effective modelling of crack propagation and closure, large slips on crack faces and weak interfaces, dam-reservoir interaction, dam-foundation interaction and automatic mesh generation. The expected outcomes of ....Seismic analysis of cracking and deformations in concrete gravity dams. This project aims to establish a rational predictive capability for the responses of concrete gravity dams subject to extreme design earthquakes. This will include the development of innovative numerical methods for effective modelling of crack propagation and closure, large slips on crack faces and weak interfaces, dam-reservoir interaction, dam-foundation interaction and automatic mesh generation. The expected outcomes of the project will be a significantly improved prediction tool. It is also anticipated that the project will result in improvements in dam and public safety, and more efficient use of funds for dam safety upgrades and management.Read moreRead less
In-situ electrochemical generation of caustic and oxygen from sewage for emission control in sewers. This project aims to deliver an innovative technology that controls the emission of notorious compounds from sewer networks using chemicals directly produced from sewage, with electricity being the input. Compared to existing methods, this technology provides a much safer and more environmentally friendly solution, at less than 50 per cent of the cost.
Industrial Transformation Training Centres - Grant ID: IC230100015
Funder
Australian Research Council
Funding Amount
$5,000,000.00
Summary
ARC Training Centre for Whole Life Design of Carbon Neutral Infrastructure. This Centre aims to transform the capability of civil infrastructure stakeholders to design, construct, operate and dispose of infrastructure in a carbon neutral way. By training industry-embedded PhDs and postdocs in the methodology and technology required to design out excess carbon of infrastructure in its whole life, this Centre expects to lead the world in sustainable infrastructure design, enabling a new generation ....ARC Training Centre for Whole Life Design of Carbon Neutral Infrastructure. This Centre aims to transform the capability of civil infrastructure stakeholders to design, construct, operate and dispose of infrastructure in a carbon neutral way. By training industry-embedded PhDs and postdocs in the methodology and technology required to design out excess carbon of infrastructure in its whole life, this Centre expects to lead the world in sustainable infrastructure design, enabling a new generation of infrastructure design in Australia and internationally. Achieving carbon neutral infrastructure in its whole life will bring significant far-reaching benefits, including equipping industry with tools required to meet Australia’s emission reduction targets as well as economic, commercial, environmental, and social gains.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100133
Funder
Australian Research Council
Funding Amount
$400,000.00
Summary
National Facility for Physical Blast Simulation (NFPBS). Recent terrorist attacks employing large quantities of high explosives have prompted the international demand for experimental investigation of civil infrastructure response to shock wave loadings. The National Facility for Physical Blast Simulation (NFPBS) is one of only a few in the world that are suitable for conducting experimental research via a physically generated blast approach.