Linkage Infrastructure, Equipment And Facilities - Grant ID: LE160100138
Funder
Australian Research Council
Funding Amount
$235,000.00
Summary
National Drop Weight Impact Testing Facility. National drop weight impact testing facility:
The national drop weight impact testing facility aims to enable dynamic tests on geo- and construction materials and systems. This facility aims to provide state-of-the-art technology to observe the real-time behaviour of elements and sub-assemblies under combined quasi-static and impact loading. Understanding material behaviour under dynamic loading is essential in dealing with many engineering problems ....National Drop Weight Impact Testing Facility. National drop weight impact testing facility:
The national drop weight impact testing facility aims to enable dynamic tests on geo- and construction materials and systems. This facility aims to provide state-of-the-art technology to observe the real-time behaviour of elements and sub-assemblies under combined quasi-static and impact loading. Understanding material behaviour under dynamic loading is essential in dealing with many engineering problems. The facility may advance understanding of the fundamental behaviour of critical infrastructure exposed to impact loading and will foster innovations in design and construction. Applications may include improvement of the structural safety of infrastructure including railway networks, tunnels and bridges, and also the development of cost-effective and environmentally friendly building and construction materials. Read moreRead less
The design and construction of quality, sustainable and affordable pre-made housing in Australia - optimisation and integration. Historically, industrialised construction has resulted in an industrialisation of the parts, rather than an industrialisation of the ensemble. In contrast, this project will integrate architecture and engineering, as well as construction and development to optimise the ensemble, and deliver architectural quality in industrially produced affordable housing.
Industrial Transformation Training Centres - Grant ID: IC150100023
Funder
Australian Research Council
Funding Amount
$4,000,000.00
Summary
ARC Training Centre for Advanced Manufacturing of Prefabricated Housing. ARC Training Centre for Advanced Manufacturing of Prefabricated Housing. This training centre aims to unlock the potential for growth of Australia’s prefabricated building industry by creating a sustainable training ecosystem including both industry and universities. It seeks to enable the next generation of engineers and architects to apply advanced manufacturing principles to prefabricated modular buildings. This emerging ....ARC Training Centre for Advanced Manufacturing of Prefabricated Housing. ARC Training Centre for Advanced Manufacturing of Prefabricated Housing. This training centre aims to unlock the potential for growth of Australia’s prefabricated building industry by creating a sustainable training ecosystem including both industry and universities. It seeks to enable the next generation of engineers and architects to apply advanced manufacturing principles to prefabricated modular buildings. This emerging highly trained workforce, driven by the needs of the customer, should identify innovations in the use of advanced materials, designs for manufacturing, and assembly. The centre aims to secure a competitive advantage for Australia in the global value chain leading to local employment growth and increased exports of prefabricated products and services.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE180100101
Funder
Australian Research Council
Funding Amount
$744,697.00
Summary
New generation facility for impact testing. This project aims to develop a new generation, national-impact testing facility to study the impact response of civil and mechanical structures and components. This project expects to seek simultaneous, realistic impact scenarios with very high velocities, which were previously impossible. This will enhance the capability for innovative research on real-time behaviour of components/systems under high amplitude impacts to augment their protection throug ....New generation facility for impact testing. This project aims to develop a new generation, national-impact testing facility to study the impact response of civil and mechanical structures and components. This project expects to seek simultaneous, realistic impact scenarios with very high velocities, which were previously impossible. This will enhance the capability for innovative research on real-time behaviour of components/systems under high amplitude impacts to augment their protection through advanced materials. This project is essential for research on rational design philosophies and effective retrofitting of high-risk buildings, infrastructure and armoured vehicles. Benefits include the saving of lives and property through new knowledge from credible impact testing.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE140100010
Funder
Australian Research Council
Funding Amount
$900,000.00
Summary
National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique fac ....National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique facility will offer a national and international hub for industry-driven research and consulting. The project outcomes will propel more Australian researchers to be among the world-leaders of rail technologies providing better solutions to challenging track environments. Prototype testing will ensure safer and cost-effective track designs.Read moreRead less
Design guidelines for safety-critical controllers in high-risk environments. This project aims to generate novel product design guidelines for developing safer controllers for use by potentially stressed individuals in high-risk situations. It will do this by generating specific insights and verifying generalisable solutions from the context of total artificial heart recipients –who must engage with critical controllers constantly. This project expects to generate new knowledge in design by esta ....Design guidelines for safety-critical controllers in high-risk environments. This project aims to generate novel product design guidelines for developing safer controllers for use by potentially stressed individuals in high-risk situations. It will do this by generating specific insights and verifying generalisable solutions from the context of total artificial heart recipients –who must engage with critical controllers constantly. This project expects to generate new knowledge in design by establishing a new research topic around an under-examined user cohort. Expected outcomes of this project include interaction design theory developments and improved controller design techniques. This should provide significant benefits and competitive advantages by lowering stress and improving safety across a range of contexts.Read moreRead less
Seismic analysis of cracking and deformations in concrete gravity dams. This project aims to establish a rational predictive capability for the responses of concrete gravity dams subject to extreme design earthquakes. This will include the development of innovative numerical methods for effective modelling of crack propagation and closure, large slips on crack faces and weak interfaces, dam-reservoir interaction, dam-foundation interaction and automatic mesh generation. The expected outcomes of ....Seismic analysis of cracking and deformations in concrete gravity dams. This project aims to establish a rational predictive capability for the responses of concrete gravity dams subject to extreme design earthquakes. This will include the development of innovative numerical methods for effective modelling of crack propagation and closure, large slips on crack faces and weak interfaces, dam-reservoir interaction, dam-foundation interaction and automatic mesh generation. The expected outcomes of the project will be a significantly improved prediction tool. It is also anticipated that the project will result in improvements in dam and public safety, and more efficient use of funds for dam safety upgrades and management.Read moreRead less
Industrial Transformation Training Centres - Grant ID: IC230100015
Funder
Australian Research Council
Funding Amount
$5,000,000.00
Summary
ARC Training Centre for Whole Life Design of Carbon Neutral Infrastructure. This Centre aims to transform the capability of civil infrastructure stakeholders to design, construct, operate and dispose of infrastructure in a carbon neutral way. By training industry-embedded PhDs and postdocs in the methodology and technology required to design out excess carbon of infrastructure in its whole life, this Centre expects to lead the world in sustainable infrastructure design, enabling a new generation ....ARC Training Centre for Whole Life Design of Carbon Neutral Infrastructure. This Centre aims to transform the capability of civil infrastructure stakeholders to design, construct, operate and dispose of infrastructure in a carbon neutral way. By training industry-embedded PhDs and postdocs in the methodology and technology required to design out excess carbon of infrastructure in its whole life, this Centre expects to lead the world in sustainable infrastructure design, enabling a new generation of infrastructure design in Australia and internationally. Achieving carbon neutral infrastructure in its whole life will bring significant far-reaching benefits, including equipping industry with tools required to meet Australia’s emission reduction targets as well as economic, commercial, environmental, and social gains.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100133
Funder
Australian Research Council
Funding Amount
$400,000.00
Summary
National Facility for Physical Blast Simulation (NFPBS). Recent terrorist attacks employing large quantities of high explosives have prompted the international demand for experimental investigation of civil infrastructure response to shock wave loadings. The National Facility for Physical Blast Simulation (NFPBS) is one of only a few in the world that are suitable for conducting experimental research via a physically generated blast approach.
Erosion of embankment dams and dam spillways. In excess of $250M is spent annually to maintain, upgrade, improve safety and monitor performance of Australian dams. Improved methods for assessing both spillway and internal erosion, the cause of 50 per cent of embankment dam failures and incidents requiring repairs, will be developed, maximising dam safety and minimising maintenance expenditure.