Water availability and demand: better forecasts, better management. This project aims to improve Australia’s capability in the provision and use of water forecasts for managing water resources. The current water forecasts are not fully utilised by water agencies as they are not sufficiently comprehensive and advanced. This project expects to achieve a step change in the uptake and utility of hydro-climate forecasts through an extensive partnership of leading researchers and operational agencies ....Water availability and demand: better forecasts, better management. This project aims to improve Australia’s capability in the provision and use of water forecasts for managing water resources. The current water forecasts are not fully utilised by water agencies as they are not sufficiently comprehensive and advanced. This project expects to achieve a step change in the uptake and utility of hydro-climate forecasts through an extensive partnership of leading researchers and operational agencies of hydro-climate forecasting, with federal, state and regional water agencies.Read moreRead less
Smart management of disinfectant in chloraminated water-supply systems. Smart management of disinfectant in chloraminated water-supply systems. This project aims to develop an adaptive, real-time control system for managing disinfectant residuals in chloraminated water supply systems. While chloramine delivers microbiologically safe drinking water in warmer climates and in long distribution systems, it is largely unpredictable, costs water utilities millions of dollars annually, and has uncertai ....Smart management of disinfectant in chloraminated water-supply systems. Smart management of disinfectant in chloraminated water-supply systems. This project aims to develop an adaptive, real-time control system for managing disinfectant residuals in chloraminated water supply systems. While chloramine delivers microbiologically safe drinking water in warmer climates and in long distribution systems, it is largely unpredictable, costs water utilities millions of dollars annually, and has uncertain benefits. This project’s control system will be guided by quantitative models formulated from multi-pronged, fundamental experiments. The project will quantify microbial chloramine decay and determine mechanisms to increase predictability. The project will develop and demonstrate a real-time control technology which delivered microbiologically safe, cost-efficient drinking water to people in warmer climates, despite warming climate and increasing population.Read moreRead less
Reducing flood loss - A data-assimilation framework for improving forecasting capability in sparsely gauged regions. Floods are the biggest and severest natural disaster we face year after year. Furthermore, there has been little improvement in our capability to prevent flood damage over past decades. This research proposes a paradigm shift in the way flood forecasting, warning and evacuation proceeds, using 21st century technologies for collecting and incorporating flood related data into exist ....Reducing flood loss - A data-assimilation framework for improving forecasting capability in sparsely gauged regions. Floods are the biggest and severest natural disaster we face year after year. Furthermore, there has been little improvement in our capability to prevent flood damage over past decades. This research proposes a paradigm shift in the way flood forecasting, warning and evacuation proceeds, using 21st century technologies for collecting and incorporating flood related data into existing modelling platforms. It is argued that assimilating real-time satellite soil moisture data into flood models can increase accuracy manifold, even if the images are uncertain. The understanding gained in course of the proposed project has the potential to significantly reduce the damage caused year after year, especially in the data poor regions of the world.Read moreRead less
Erosion of embankment dams and dam spillways. In excess of $250M is spent annually to maintain, upgrade, improve safety and monitor performance of Australian dams. Improved methods for assessing both spillway and internal erosion, the cause of 50 per cent of embankment dam failures and incidents requiring repairs, will be developed, maximising dam safety and minimising maintenance expenditure.
Seismic analysis of cracking and deformations in concrete gravity dams. This project aims to establish a rational predictive capability for the responses of concrete gravity dams subject to extreme design earthquakes. This will include the development of innovative numerical methods for effective modelling of crack propagation and closure, large slips on crack faces and weak interfaces, dam-reservoir interaction, dam-foundation interaction and automatic mesh generation. The expected outcomes of ....Seismic analysis of cracking and deformations in concrete gravity dams. This project aims to establish a rational predictive capability for the responses of concrete gravity dams subject to extreme design earthquakes. This will include the development of innovative numerical methods for effective modelling of crack propagation and closure, large slips on crack faces and weak interfaces, dam-reservoir interaction, dam-foundation interaction and automatic mesh generation. The expected outcomes of the project will be a significantly improved prediction tool. It is also anticipated that the project will result in improvements in dam and public safety, and more efficient use of funds for dam safety upgrades and management.Read moreRead less