Gauging informed public opinion on sentencing sex offenders: a national study. Sex offences appear to attract the greatest community condemnation and desire to punish, particularly when involving predatory stranger rapists or when the victims are children. This national study aims to ascertain informed public opinion on sex offender sentencing by exploring the views of jurors in sex offence trials in all higher courts in Australia.
Industrial Transformation Research Hubs - Grant ID: IH150100006
Funder
Australian Research Council
Funding Amount
$5,000,000.00
Summary
ARC Research Hub for Nanoscience-based Construction Material Manufacturing. ARC Research Hub for Nanoscience-based Construction Material Manufacturing. This research hub aims to develop novel construction materials including binders, cement additives, high-performance concrete materials, concrete structural systems, polymer composites, and pavement materials. The multi-disciplinary hub provides a centralised platform to transform the construction materials industry into an advanced manufacturing ....ARC Research Hub for Nanoscience-based Construction Material Manufacturing. ARC Research Hub for Nanoscience-based Construction Material Manufacturing. This research hub aims to develop novel construction materials including binders, cement additives, high-performance concrete materials, concrete structural systems, polymer composites, and pavement materials. The multi-disciplinary hub provides a centralised platform to transform the construction materials industry into an advanced manufacturing sector delivering sustainable and resilient infrastructure assets. The hub intends to develop nanotechnology, cement chemistry, concrete technology and extreme engineering solutions; and to train the next generation of skilled workers, re-positioning Australian industry competitiveness and global market leadership to capture international infrastructure development opportunities.Read moreRead less
Novel test and design methods for base course reinforced flexible pavements. This project aims to develop the mechanics of geosynthetic-reinforced flexible pavements as an urgent need for the Australian pavement industry to build more sustainable and economical roads. Novel laboratory test apparatus and in-situ test programs, and mathematical models will be developed, for the first time, to capture the responses of reinforced base courses in a complete and optimised way to determine the paramete ....Novel test and design methods for base course reinforced flexible pavements. This project aims to develop the mechanics of geosynthetic-reinforced flexible pavements as an urgent need for the Australian pavement industry to build more sustainable and economical roads. Novel laboratory test apparatus and in-situ test programs, and mathematical models will be developed, for the first time, to capture the responses of reinforced base courses in a complete and optimised way to determine the parameters for pavement design and performance evaluation. The outcomes will enable reliable prediction of reinforced pavement behaviour, leading to better-performing geosynthetic products and more resilient pavements, reduced material usage and damage in pavements, and less environmental impact and maintenance cost.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE210100043
Funder
Australian Research Council
Funding Amount
$539,000.00
Summary
The Australian Royal Commissions and Public Inquiries Library. This project aims to provide comprehensive free access online to the reports of all royal commissions and other public inquiries held in Australia since Federation. The project
intends to support a wide understanding of the pivotal role public inquiries play in the development of Australian law and public policy. It is expected that these reports will be comprehensively integrated with all other legislation, case law and law reform r ....The Australian Royal Commissions and Public Inquiries Library. This project aims to provide comprehensive free access online to the reports of all royal commissions and other public inquiries held in Australia since Federation. The project
intends to support a wide understanding of the pivotal role public inquiries play in the development of Australian law and public policy. It is expected that these reports will be comprehensively integrated with all other legislation, case law and law reform reports on AustLII to promote a greater understanding of how the balance is struck between inquisitorial fact-finding and the right to procedural fairness of participants and of how justice is delivered through the inquiry function of public bodies.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100133
Funder
Australian Research Council
Funding Amount
$400,000.00
Summary
National Facility for Physical Blast Simulation (NFPBS). Recent terrorist attacks employing large quantities of high explosives have prompted the international demand for experimental investigation of civil infrastructure response to shock wave loadings. The National Facility for Physical Blast Simulation (NFPBS) is one of only a few in the world that are suitable for conducting experimental research via a physically generated blast approach.
Reinforced crumbed rubber concrete for residential construction. Reinforced crumbed rubber concrete for residential construction. This project aims to use crumb rubber from used tyres to replace natural sand aggregate in concrete used in housing construction. Globally, very few of the millions of tyres discarded annually are recycled, while natural sand used in concrete is being depleted. This project intends to provide the tyre industry with a viable market for end of life tyres, and the premix ....Reinforced crumbed rubber concrete for residential construction. Reinforced crumbed rubber concrete for residential construction. This project aims to use crumb rubber from used tyres to replace natural sand aggregate in concrete used in housing construction. Globally, very few of the millions of tyres discarded annually are recycled, while natural sand used in concrete is being depleted. This project intends to provide the tyre industry with a viable market for end of life tyres, and the premix concrete industry with a “green” product for the residential construction market. Expected benefits include the increased use of a waste resource (used tyres), reduced use of a scarce natural resource (sand), and the development of an economic but green alternative concrete option for residential builders and owners.Read moreRead less
Industrial Transformation Training Centres - Grant ID: IC230100015
Funder
Australian Research Council
Funding Amount
$5,000,000.00
Summary
ARC Training Centre for Whole Life Design of Carbon Neutral Infrastructure. This Centre aims to transform the capability of civil infrastructure stakeholders to design, construct, operate and dispose of infrastructure in a carbon neutral way. By training industry-embedded PhDs and postdocs in the methodology and technology required to design out excess carbon of infrastructure in its whole life, this Centre expects to lead the world in sustainable infrastructure design, enabling a new generation ....ARC Training Centre for Whole Life Design of Carbon Neutral Infrastructure. This Centre aims to transform the capability of civil infrastructure stakeholders to design, construct, operate and dispose of infrastructure in a carbon neutral way. By training industry-embedded PhDs and postdocs in the methodology and technology required to design out excess carbon of infrastructure in its whole life, this Centre expects to lead the world in sustainable infrastructure design, enabling a new generation of infrastructure design in Australia and internationally. Achieving carbon neutral infrastructure in its whole life will bring significant far-reaching benefits, including equipping industry with tools required to meet Australia’s emission reduction targets as well as economic, commercial, environmental, and social gains.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE120100062
Funder
Australian Research Council
Funding Amount
$330,000.00
Summary
The Australasian Legal History Library: Creating historical depth in legal data on AustLII, to improve all legal research. The Australasian Legal History Library, to be located for free access on AustLII, will provide comprehensive legislation and case law from all colonies (subsequently Australian States, Territories or New Zealand) up to 1950. Its citator will show how these historical materials are used in current legal decisions. It will be a revolution for legal history research.
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE150100051
Funder
Australian Research Council
Funding Amount
$410,000.00
Summary
The Australasian Legal History Libraries: Stage II. The Australasian legal history libraries stage II: Australia's leading legal historians will partner with the Australasian Legal Information Institute (AustLII) to create a massive expansion of free online access to Australasian legal history through digitisation and data aggregation. The Legal History Libraries on AustLII will become a comprehensive trans-Tasman collection from 1788-1999, including all reported case series and those from colon ....The Australasian Legal History Libraries: Stage II. The Australasian legal history libraries stage II: Australia's leading legal historians will partner with the Australasian Legal Information Institute (AustLII) to create a massive expansion of free online access to Australasian legal history through digitisation and data aggregation. The Legal History Libraries on AustLII will become a comprehensive trans-Tasman collection from 1788-1999, including all reported case series and those from colonial newspaper reports, and all Acts enacted, plus key collections of historical Bills, Gazettes, legal commentaries, and Parliamentary reports. The Libraries are expected to double in size from their current 50,000 items of cases and legislation. The Libraries will enable previously impractical access, comparative research, and international collaborations.Read moreRead less
ARC Centre of Excellence for the Elimination of Violence Against Women. ARC Centre of Excellence for the Elimination of Violence Against Women. Eliminating violence against women is one of the major challenges of the 21st century. Awareness of the problem has grown exponentially, but solutions to it have not. This Centre aims to transform our understanding of the problem by examining the structural drivers that cause and compound violence against women, and pioneering new, evidence-based approac ....ARC Centre of Excellence for the Elimination of Violence Against Women. ARC Centre of Excellence for the Elimination of Violence Against Women. Eliminating violence against women is one of the major challenges of the 21st century. Awareness of the problem has grown exponentially, but solutions to it have not. This Centre aims to transform our understanding of the problem by examining the structural drivers that cause and compound violence against women, and pioneering new, evidence-based approaches to radically improve policy and practice across Australia and the Indo-Pacific. The Centre mobilises survivor-centric and Indigenous methodologies, interdisciplinary collaborations, and Indo-Pacific partnerships to deliver scalable approaches to eliminate violence against women across the legal, security, economic, health, and political systems of Australia and the region.Read moreRead less