The response of beams subjected to axial load and lateral soil movements. Beams (piles, soil nails, and pipelines) are not only subjected to axial (vertical, axial and longitudinal)loading, but often withstand simultaneous lateral loading, due to either explicit structural loads, or due to loads induced by movement of the soils in which they are founded. Bridge piles adjacent to an approach embankment are one example. This project will provide experimental evidence to assist with the estimation ....The response of beams subjected to axial load and lateral soil movements. Beams (piles, soil nails, and pipelines) are not only subjected to axial (vertical, axial and longitudinal)loading, but often withstand simultaneous lateral loading, due to either explicit structural loads, or due to loads induced by movement of the soils in which they are founded. Bridge piles adjacent to an approach embankment are one example. This project will provide experimental evidence to assist with the estimation of capacity, axial and shear resistance, the validation of unified solutions for beams subjected to simultaneous lateral soil movements and axial loads. Such experimental evidence and analytical solutions are not currently available. The evidence will also assist with solving a contradictory, existing design principle, which will lead to an economic and efficient design approach.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE180100101
Funder
Australian Research Council
Funding Amount
$744,697.00
Summary
New generation facility for impact testing. This project aims to develop a new generation, national-impact testing facility to study the impact response of civil and mechanical structures and components. This project expects to seek simultaneous, realistic impact scenarios with very high velocities, which were previously impossible. This will enhance the capability for innovative research on real-time behaviour of components/systems under high amplitude impacts to augment their protection throug ....New generation facility for impact testing. This project aims to develop a new generation, national-impact testing facility to study the impact response of civil and mechanical structures and components. This project expects to seek simultaneous, realistic impact scenarios with very high velocities, which were previously impossible. This will enhance the capability for innovative research on real-time behaviour of components/systems under high amplitude impacts to augment their protection through advanced materials. This project is essential for research on rational design philosophies and effective retrofitting of high-risk buildings, infrastructure and armoured vehicles. Benefits include the saving of lives and property through new knowledge from credible impact testing.Read moreRead less
Erosion processes in soils across scales. This project aims to develop a monitoring tool for predicting the evolution of internal erosion in dams based on innovative electromagnetic observation methods. Internal erosion is an insidious process occurring in the obscurity of the soil’s pore system until its consequences become visible and threaten the stability of the dams. These water retaining structures are vital for the future water and energy supply for our society and their failure can be ca ....Erosion processes in soils across scales. This project aims to develop a monitoring tool for predicting the evolution of internal erosion in dams based on innovative electromagnetic observation methods. Internal erosion is an insidious process occurring in the obscurity of the soil’s pore system until its consequences become visible and threaten the stability of the dams. These water retaining structures are vital for the future water and energy supply for our society and their failure can be catastrophic. By establishing an improved understanding of internal erosion as a sequence of processes on various scales, from the onset of erosion until the failure of the structure, this project will place Australia at the forefront of dam safety assessment.Read moreRead less
Development of advanced deterioration model for the design of stabilised pavement bases. The Australian road network is a lifeline infrastructure that underpins the nation's living standards and economy. Much of these roads have deteriorated and require rehabilitation to get a new lease of life. This project intends to develop advanced methods to extend the lives of these pavements using in-situ recycling of old pavement materials.
Industrial Transformation Training Centres - Grant ID: IC170100006
Funder
Australian Research Council
Funding Amount
$3,937,625.00
Summary
ARC Training Centre for Advanced Technologies in Rail Track Infrastructure. The ARC Training Centre for Advanced Technologies in Rail Track Infrastructure aims to transform Australia’s rail construction and maintenance technologies through specialist training of industry-focused researchers. Generation of new knowledge and close collaboration with companies within the rail supply chain will result in enhanced rail capacity and supply chain efficiency across the rail network. This will include in ....ARC Training Centre for Advanced Technologies in Rail Track Infrastructure. The ARC Training Centre for Advanced Technologies in Rail Track Infrastructure aims to transform Australia’s rail construction and maintenance technologies through specialist training of industry-focused researchers. Generation of new knowledge and close collaboration with companies within the rail supply chain will result in enhanced rail capacity and supply chain efficiency across the rail network. This will include increased axle loads and higher speeds, greater safety margins, reduced construction and maintenance costs, and a body of competent railway professionals in the nation’s work force.Read moreRead less
Designing the next generation of geosynthetic liner systems . The project aims to improve the effectiveness of geosynthetic liner systems to contain emerging contaminants such as per-and poly-fluoroalkyl substances (PFASs) for better protection of Australian groundwater resources. The project expects to experimentally validate theory to improve predictive models for performance of geosynthetic liner systems. Expected outcomes include new and updated design guidelines for effective environmental ....Designing the next generation of geosynthetic liner systems . The project aims to improve the effectiveness of geosynthetic liner systems to contain emerging contaminants such as per-and poly-fluoroalkyl substances (PFASs) for better protection of Australian groundwater resources. The project expects to experimentally validate theory to improve predictive models for performance of geosynthetic liner systems. Expected outcomes include new and updated design guidelines for effective environmental protection against PFASs and establishment of new approaches for predicting functional containment lifetimes of liner systems. These outcomes are expected to benefit the waste and remediation industries by influencing next-generation design regulations to ensure long-term environmental protection from PFAS.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE140100010
Funder
Australian Research Council
Funding Amount
$900,000.00
Summary
National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique fac ....National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique facility will offer a national and international hub for industry-driven research and consulting. The project outcomes will propel more Australian researchers to be among the world-leaders of rail technologies providing better solutions to challenging track environments. Prototype testing will ensure safer and cost-effective track designs.Read moreRead less
An innovative light weight composite panel system for high speed modular construction. This project aims to develop an innovative composite panel system using aerated geopolymer and a thin high strength steel casing. The new panel system aims to have a number of significant enhancements compared to traditional panels in terms of load resistance, much lower carbon footprint and life-cycle costs. It aims to offer desirable properties, such as being light-weight, easy to construct, economical, recy ....An innovative light weight composite panel system for high speed modular construction. This project aims to develop an innovative composite panel system using aerated geopolymer and a thin high strength steel casing. The new panel system aims to have a number of significant enhancements compared to traditional panels in terms of load resistance, much lower carbon footprint and life-cycle costs. It aims to offer desirable properties, such as being light-weight, easy to construct, economical, recyclable and reusable. A significant gap in knowledge exists in the material and system behaviour of the aerated geopolymer and its fire performance. It is intended that a comprehensive research program will be carried out to address those challenges and to provide design guidelines to rapidly progress these technologies in Australia and overseas.Read moreRead less
Erosion of embankment dams and dam spillways. In excess of $250M is spent annually to maintain, upgrade, improve safety and monitor performance of Australian dams. Improved methods for assessing both spillway and internal erosion, the cause of 50 per cent of embankment dam failures and incidents requiring repairs, will be developed, maximising dam safety and minimising maintenance expenditure.
Multifunctional Structural Panels for Next-generation Infrastructure. This project aims to develop a multifunctional prefabricated structural panel for current and future infrastructure applications for both land and offshore environments. Prefabrication enables enhanced product control as well as the ability to rapidly construct whole structures or their components. The panels utilise an inner lightweight foam and fibre-reinforced polymer (FRP) composite core with strong outer panels made from ....Multifunctional Structural Panels for Next-generation Infrastructure. This project aims to develop a multifunctional prefabricated structural panel for current and future infrastructure applications for both land and offshore environments. Prefabrication enables enhanced product control as well as the ability to rapidly construct whole structures or their components. The panels utilise an inner lightweight foam and fibre-reinforced polymer (FRP) composite core with strong outer panels made from FRP sheets and high-strength concrete. The expected outcomes include experimental and numerical validation of the system, that will give designers and asset owners the confidence to adopt this new panel. The panel system presents an upward step change in construction technology and built infrastructure performance.Read moreRead less