Bayesian back analysis for settlement prediction of soft soils. The settlement of road embankments built on soft soils can take many years which has created additional challenges for road design and construction. Despite many years of experience with the Pacific Highway Upgrade, industry partners have seen many examples where embankments have settled more than expected during construction and after road opening. This causes potential delay delivering projects, ponding, potential aquaplaning and ....Bayesian back analysis for settlement prediction of soft soils. The settlement of road embankments built on soft soils can take many years which has created additional challenges for road design and construction. Despite many years of experience with the Pacific Highway Upgrade, industry partners have seen many examples where embankments have settled more than expected during construction and after road opening. This causes potential delay delivering projects, ponding, potential aquaplaning and unexpected maintenance. This project aims at developing useful tools for industry to better predict the settlement of embankment built on soft soils. The intended outcomes can help to increase the safety level of road transportation system of Australia, reduce construction and maintenance costs.Read moreRead less
Advancement of cohesive crack approach to model shrinkage and load induced cracking in multi-phase soils. Soil cracking affects many engineering applications and infrastructure. It is also recognised that the impending climate change can affect the severity of soil cracking. Despite this, there is lack of progress in this area and significant knowledge gaps exist. This project will provide new knowledge and better design and management tools.
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE140100010
Funder
Australian Research Council
Funding Amount
$900,000.00
Summary
National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique fac ....National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique facility will offer a national and international hub for industry-driven research and consulting. The project outcomes will propel more Australian researchers to be among the world-leaders of rail technologies providing better solutions to challenging track environments. Prototype testing will ensure safer and cost-effective track designs.Read moreRead less
Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechani ....Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechanisms of mud pumping, incorporating train loads and frequencies, will be studied, and the role of vertically installed drains will be quantified for improved practical design. The project aims to contribute to improved track longevity and reduced maintenance costs, with a corresponding boost in rail productivity.Read moreRead less
Dynamic soil structure interaction. The aim of this project is to undertake a study of an important class of geotechnical problems in which systems composed of soil, structure and pore water are subjected to dynamic or impact loading. The outcomes will include safer and more efficient methods for designing geotechnical structures subjected to dynamic loading.
Development of advanced deterioration model for the design of stabilised pavement bases. The Australian road network is a lifeline infrastructure that underpins the nation's living standards and economy. Much of these roads have deteriorated and require rehabilitation to get a new lease of life. This project intends to develop advanced methods to extend the lives of these pavements using in-situ recycling of old pavement materials.
A multi-scale approach to investigate desiccation cracking in clayey soils. The project plans to develop a model of the mechanism of drying shrinkage and associated cracking in soils. Soil desiccation cracking can adversely affect the stability and performance of many vital geo-infrastructures. For example, desiccation cracks have contributed to dam and slope failures incurring significant damages. Our understanding of the mechanism of drying shrinkage cracking and ways to control or avoid such ....A multi-scale approach to investigate desiccation cracking in clayey soils. The project plans to develop a model of the mechanism of drying shrinkage and associated cracking in soils. Soil desiccation cracking can adversely affect the stability and performance of many vital geo-infrastructures. For example, desiccation cracks have contributed to dam and slope failures incurring significant damages. Our understanding of the mechanism of drying shrinkage cracking and ways to control or avoid such cracking in soils is not yet fully developed. This project aims to advance knowledge of the nature of crack initiation and propagation in clayey soils induced by moisture evaporation, through the use of advanced experimental and modelling techniques. Outcomes are expected to lead to new continuum models for reliable prediction of soil desiccation cracking.Read moreRead less
Optimisation of shallow geothermal systems for Australian schools. This project aims to increase energy efficiency and reduce greenhouse gas emissions by optimising shallow geothermal systems in Australian schools. Shallow geothermal systems use the ground as a heat source and sink for heating and cooling. Their application to schools has the potential to harness energy from untapped resources such as sport grounds, reduce energy consumption by up to 75% and increase comfort and productivity of ....Optimisation of shallow geothermal systems for Australian schools. This project aims to increase energy efficiency and reduce greenhouse gas emissions by optimising shallow geothermal systems in Australian schools. Shallow geothermal systems use the ground as a heat source and sink for heating and cooling. Their application to schools has the potential to harness energy from untapped resources such as sport grounds, reduce energy consumption by up to 75% and increase comfort and productivity of our children at school. An expected outcome of this project is to create a full scale physical model along advanced optimisation models which will allow better understanding of energy efficiency gains, and lead towards improving geothermal design techniques tailored to educational buildings.Read moreRead less
Direct geothermal energy: harnessing an emerging technology. To mitigate the impacts of climate change, the demand for renewable energy technologies with low greenhouse gas (GHG) emissions is rapidly becoming a global priority. Direct geothermal systems use shallow ground as a heat source and sink for heating and cooling buildings, using ground heat exchangers (GHEs) and heat pumps. Substituting common heating and cooling systems with geothermal ones can reduce energy consumption by up to 75 per ....Direct geothermal energy: harnessing an emerging technology. To mitigate the impacts of climate change, the demand for renewable energy technologies with low greenhouse gas (GHG) emissions is rapidly becoming a global priority. Direct geothermal systems use shallow ground as a heat source and sink for heating and cooling buildings, using ground heat exchangers (GHEs) and heat pumps. Substituting common heating and cooling systems with geothermal ones can reduce energy consumption by up to 75 per cent and thus greenhouse gas emissions, since 91 per cent of electricity comes from fossil fuels in Australia. This project aims to develop new full scale physical and numerical models which will allow studying the effects of GHE configuration and intermittent use on efficiency and which will lead towards improving the poor and scarce existing design techniques.Read moreRead less