A multi-agent system for stakeholder management in off-site construction. This project aims to investigate a socio-technology model for stakeholders and informatics to improve off-site construction (OSC) productivity in infrastructure construction. A multi-agent system for OSC could drive down cost, but requires highly integrated collaboration among stakeholders. The project’s quantitative approaches include large-scale social network analysis, multi-agent consensus modelling and an optimisation ....A multi-agent system for stakeholder management in off-site construction. This project aims to investigate a socio-technology model for stakeholders and informatics to improve off-site construction (OSC) productivity in infrastructure construction. A multi-agent system for OSC could drive down cost, but requires highly integrated collaboration among stakeholders. The project’s quantitative approaches include large-scale social network analysis, multi-agent consensus modelling and an optimisation algorithm for collaborative planning. The project outcomes are expected to secure long-term economic benefits by enhancing performance in complex projects.Read moreRead less
Life-cycle cost and emission analyses of green-building implementation. In Australia, the annual average temperature has increased 0.9 degrees Celsius since 1910. Residential and commercial building sectors produce about 23 per cent of the national greenhouse-gas emissions. This project critically evaluates the cost effectiveness and greenhouse-gas emissions of green-building implementation in Australia. This will examine methods to lower cost and greenhouse-gas emissions from green-building imp ....Life-cycle cost and emission analyses of green-building implementation. In Australia, the annual average temperature has increased 0.9 degrees Celsius since 1910. Residential and commercial building sectors produce about 23 per cent of the national greenhouse-gas emissions. This project critically evaluates the cost effectiveness and greenhouse-gas emissions of green-building implementation in Australia. This will examine methods to lower cost and greenhouse-gas emissions from green-building implementation. A new high-tech scoring model is expected to be developed to identify cost-effective and low-greenhouse-gas-emissions methods to achieve specific green-star status for the Australian building and construction industries.Read moreRead less
Greening procurement of infrastructure construction: optimising mass-haul operations to reduce greenhouse gas emissions. This project will develop and prototype tools to reduce the high environmental impact of mass haul operations in road and rail infrastructure projects. Both contractors and clients need practical methods for calculating, optimising and procuring optimal solutions, because mass haul is one of the few areas where a contractor can reduce carbon dioxide impact.