Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and red ....Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and reduction strategies prevails. This research aims to develop a theoretical model that can be used to develop robust containment and reduction strategies to mitigate the adverse economic, productivity and safety consequences that materialize from performing rework during the construction of mega transport projects.Read moreRead less
The role of vegetation and associated root suction and reinforcement on the stabilisation of transport corridors and sloping ground. The project will promote the concept of green corridors and green hills for stabilising unstable soils through optimum root reinforcement and suction. The improved load capacity, control of unacceptable soil movement and slope stabilisation will provide an efficient platform for sustainable development of transport and building infrastructure.