Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100089
Funder
Australian Research Council
Funding Amount
$500,000.00
Summary
Performance level structural testing facility. A structural testing facility is proposed for the new Advanced Engineering Building at The University of Queensland. The focus of the research supported by this facility will ensure the functionality of Australia’s infrastructure resources and the development of new engineering solutions that will enhance the country’s long-term economic growth.
ARC Centre of Excellence for Geotechnical Science and Engineering. To pioneer new scientific approaches for geotechnical design of Australia's energy and transport infrastructure. Australia will spend over $250 billion during the next five years on the provision of physical infrastructure for energy and transport, which is the critical importance to the nation's future prosperity. The Centre for Geotechnical Science and Engineering will develop new computational and experimental approaches to un ....ARC Centre of Excellence for Geotechnical Science and Engineering. To pioneer new scientific approaches for geotechnical design of Australia's energy and transport infrastructure. Australia will spend over $250 billion during the next five years on the provision of physical infrastructure for energy and transport, which is the critical importance to the nation's future prosperity. The Centre for Geotechnical Science and Engineering will develop new computational and experimental approaches to underpin the geotechnical design of this infrastructure and provide a national focus for geotechnical research. New scientific approaches and software for designing cheaper and safer infrastructure in the energy and transport sectors.Read moreRead less
Trustworthy positioning for intelligent transport systems. This project aims to develop a holistic approach for reliable positioning for Intelligent Transport Systems (ITS). This project will address the challenges of integrity monitoring in ITS when using satellite-based technology, its integration with other sensors, and when supported by the proposed Australia National Positioning Infrastructure. It will consider Australian geography, large area, and sparse population, and emphasise rural tra ....Trustworthy positioning for intelligent transport systems. This project aims to develop a holistic approach for reliable positioning for Intelligent Transport Systems (ITS). This project will address the challenges of integrity monitoring in ITS when using satellite-based technology, its integration with other sensors, and when supported by the proposed Australia National Positioning Infrastructure. It will consider Australian geography, large area, and sparse population, and emphasise rural transport. Expected primary outputs include algorithms, a detailed analysis of required systems and recommendations that will help prepare Australia for the importation of self-driving vehicles.Read moreRead less
Performance of granular matrix under heavy haul cyclic loading. Performance of granular matrix under heavy haul cyclic loading. This project aims to enhance the longevity of roads and tracks based on improved geotechnical design. The demand for safe and durable roads and railways to accommodate faster and heavier traffic has increased steadily in the past decade. This project will research the performance of compacted granular waste (coalwash & flyash) under cyclic loads, particularly relevant t ....Performance of granular matrix under heavy haul cyclic loading. Performance of granular matrix under heavy haul cyclic loading. This project aims to enhance the longevity of roads and tracks based on improved geotechnical design. The demand for safe and durable roads and railways to accommodate faster and heavier traffic has increased steadily in the past decade. This project will research the performance of compacted granular waste (coalwash & flyash) under cyclic loads, particularly relevant to heavy haul industry, from a geomechanics perspective. It will use geotechnical laboratory testing and field monitoring to develop a computational model, incorporating the relevant strength and deformation properties at varied load frequencies. The anticipated outcome is sustainable, more resilient transport infrastructure.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100028
Funder
Australian Research Council
Funding Amount
$300,000.00
Summary
A national facility for in situ testing of soft soils. A mobile in situ testing laboratory will permit the investigation of devices for measuring geotechnical conditions on soft and swampy sites which are often being encountered on key infrastructure projects. The new facility will improve the modelling and testing of soft soils and ensure the safe and economic development of Australian infrastructure.
Laser Ultrasonic Health Monitoring for Australia’s Infrastructure Assets. This project aims to develop technologies to monitor the health of Australia’s ageing infrastructure with the use of a unique laser ultrasonic device. The laser device will be used to conduct experiments that are expected to develop a set of techniques for monitoring the critical areas of structures with most frequently observed ageing problems. Precise estimates of damage will be made by processing signals from a combinat ....Laser Ultrasonic Health Monitoring for Australia’s Infrastructure Assets. This project aims to develop technologies to monitor the health of Australia’s ageing infrastructure with the use of a unique laser ultrasonic device. The laser device will be used to conduct experiments that are expected to develop a set of techniques for monitoring the critical areas of structures with most frequently observed ageing problems. Precise estimates of damage will be made by processing signals from a combination of simulation and experimental modelling. Feedback from the user community is expected to further improve the techniques.Read moreRead less