Trustworthy positioning for intelligent transport systems. This project aims to develop a holistic approach for reliable positioning for Intelligent Transport Systems (ITS). This project will address the challenges of integrity monitoring in ITS when using satellite-based technology, its integration with other sensors, and when supported by the proposed Australia National Positioning Infrastructure. It will consider Australian geography, large area, and sparse population, and emphasise rural tra ....Trustworthy positioning for intelligent transport systems. This project aims to develop a holistic approach for reliable positioning for Intelligent Transport Systems (ITS). This project will address the challenges of integrity monitoring in ITS when using satellite-based technology, its integration with other sensors, and when supported by the proposed Australia National Positioning Infrastructure. It will consider Australian geography, large area, and sparse population, and emphasise rural transport. Expected primary outputs include algorithms, a detailed analysis of required systems and recommendations that will help prepare Australia for the importation of self-driving vehicles.Read moreRead less
Discovery Early Career Researcher Award - Grant ID: DE130100205
Funder
Australian Research Council
Funding Amount
$375,000.00
Summary
Optimisation of transit priority in a transportation network. This project is aimed at developing an optimised approach to combine various types of public transport priority in an urban network which can be used by transport planners to increase the efficiency of traffic movements and reduce traffic congestion. The case study is the network of Brisbane including all arterial and local roads.
Innovative urban traffic congestion solutions: optimising road space using networks of multi-class priority lanes. This project strengthens national approaches to a pervasive Australian problem; growing traffic congestion deteriorating liveability, environmental health and economic performance of the cities. This project improves approaches for traffic priority design to improve the efficiency of several class of vehicles and therefore, reducing traffic congestion.
Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and red ....Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and reduction strategies prevails. This research aims to develop a theoretical model that can be used to develop robust containment and reduction strategies to mitigate the adverse economic, productivity and safety consequences that materialize from performing rework during the construction of mega transport projects.Read moreRead less
Trustworthy positioning for intelligent transport systems. This project aims to develop a holistic approach for reliable positioning for Intelligent Transport Systems (ITS). This project will address the challenges of integrity monitoring in ITS when using satellite-based technology, its integration with other sensors, and when supported by the proposed Australia National Positioning Infrastructure. It will consider Australian geography, large area, and sparse population, and emphasise rural tra ....Trustworthy positioning for intelligent transport systems. This project aims to develop a holistic approach for reliable positioning for Intelligent Transport Systems (ITS). This project will address the challenges of integrity monitoring in ITS when using satellite-based technology, its integration with other sensors, and when supported by the proposed Australia National Positioning Infrastructure. It will consider Australian geography, large area, and sparse population, and emphasise rural transport. Expected primary outputs include algorithms, a detailed analysis of required systems and recommendations that will help prepare Australia for the importation of self-driving vehicles.Read moreRead less
Funding on the line: public transport financing and property value capture. This project aims to develop property value capture schemes that would provide alternative funding for public transport infrastructure. It plans to model the timing and spatial patterns of property value uplift from recent investments in rail, busways and ferries in Queensland and New South Wales. It then intends to conduct a survey of Australian stakeholders and discrete choice modelling to determine willingness-to-pay. ....Funding on the line: public transport financing and property value capture. This project aims to develop property value capture schemes that would provide alternative funding for public transport infrastructure. It plans to model the timing and spatial patterns of property value uplift from recent investments in rail, busways and ferries in Queensland and New South Wales. It then intends to conduct a survey of Australian stakeholders and discrete choice modelling to determine willingness-to-pay. This data is then expected to be used to develop an institutionally, legally and politically feasible scheme for implementation in Australia, focused on cases including extension to the Gold Coast light rail network.Read moreRead less
Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and red ....Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and reduction strategies prevails. This research aims to develop a theoretical model that can be used to develop robust containment and reduction strategies to mitigate the adverse economic, productivity and safety consequences that materialize from performing rework during the construction of mega transport projects.Read moreRead less