ARDC Research Link Australia Research Link Australia   BETA Research
Link
Australia
  • ARDC Newsletter Subscribe
  • Contact Us
  • Home
  • About
  • Feedback
  • Explore Collaborations
  • Researcher
  • Funded Activity
  • Organisation
  • Researcher
  • Funded Activity
  • Organisation
  • Researcher
  • Funded Activity
  • Organisation

Need help searching? View our Search Guide.

Advanced Search

Current Selection
Australian State/Territory : NSW
Socio-Economic Objective : Civil
Field of Research : Transport Engineering
Clear All
Filter by Field of Research
Civil Engineering (6)
Transport Engineering (6)
Geotechnical Engineering (4)
Construction Engineering (2)
Structural Engineering (2)
Alloy Materials (1)
Land Capability And Soil Degradation (1)
Filter by Socio-Economic Objective
Civil (6)
Other (2)
Ground transport not elsewhere classified (1)
Housing (1)
Other road transport (1)
Rail transport (1)
Road safety (1)
Filter by Funding Provider
Australian Research Council (6)
Filter by Status
Closed (6)
Filter by Scheme
Linkage Projects (3)
Discovery Projects (2)
Linkage Infrastructure, Equipment and Facilities (1)
Filter by Country
Australia (6)
Filter by Australian State/Territory
NSW (6)
VIC (2)
  • Researchers (3)
  • Funded Activities (6)
  • Organisations (4)
  • Funded Activity

    Linkage Projects - Grant ID: LP0668835

    Funder
    Australian Research Council
    Funding Amount
    $214,426.00
    Summary
    Stabilisation of erodible and dispersive soils with natural wood processing by-products. Lignosulfonate is a by-product of paper and wood processing industry, which is an environmentally friendly organic compound with an immense potential for stabilising erodible and dispersive soils when mixed in small quantities. This project will deliver practical design guidelines and specifications for sustainable performance of road and rail embankments that are treated with lignosulfonates. Utilisation of .... Stabilisation of erodible and dispersive soils with natural wood processing by-products. Lignosulfonate is a by-product of paper and wood processing industry, which is an environmentally friendly organic compound with an immense potential for stabilising erodible and dispersive soils when mixed in small quantities. This project will deliver practical design guidelines and specifications for sustainable performance of road and rail embankments that are treated with lignosulfonates. Utilisation of lignosulfonates in soil stabilisation is not only cost-effective, but also has the benefit of eliminating a waste disposal problem. The proposed project will improve industrial competitiveness and Australia's export earnings through increased commercialisation and technology transfer in the region.
    Read more Read less
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP0664199

    Funder
    Australian Research Council
    Funding Amount
    $180,000.00
    Summary
    Assessment and Prediction of Particle Breakage under Cyclic Loading. Every year, transport industries spend millions of dollars to maintain existing tracks suffering excessive settlement due to heavy traffic. In railways, differential settlement and track fouling are mostly due to ballast breakage. Frequent maintenance requires large amounts of quarried ballast causing environmental degradation. Simulation of particle breakage subject to cyclic loading is pioneering fundamental research that wi .... Assessment and Prediction of Particle Breakage under Cyclic Loading. Every year, transport industries spend millions of dollars to maintain existing tracks suffering excessive settlement due to heavy traffic. In railways, differential settlement and track fouling are mostly due to ballast breakage. Frequent maintenance requires large amounts of quarried ballast causing environmental degradation. Simulation of particle breakage subject to cyclic loading is pioneering fundamental research that will have significant impact on the design and maintenance of future rail and road networks. A full understanding of the breakage mechanisms of aggregates will lead to innovative techniques in design and construction, including faster trains carrying heavier loads with reduced maintenance costs.
    Read more Read less
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP0558518

    Funder
    Australian Research Council
    Funding Amount
    $286,249.00
    Summary
    The effect of tunelling on existing rock bolts. As more underground facilities such as rail, road, sewerage and service tunnels are constructed in our major cities, more and more frequently new tunnels have to cross over or run alongside existing tunnels. As the roofs of tunnels are generally supported by rock bolts and lined with shotcrete, the support system can be damaged by the rock movements caused by the excavation of the new tunnel. Little research has been carried out on this problem, an .... The effect of tunelling on existing rock bolts. As more underground facilities such as rail, road, sewerage and service tunnels are constructed in our major cities, more and more frequently new tunnels have to cross over or run alongside existing tunnels. As the roofs of tunnels are generally supported by rock bolts and lined with shotcrete, the support system can be damaged by the rock movements caused by the excavation of the new tunnel. Little research has been carried out on this problem, and so often expensive deviations have to be made to tunnels to avoid going near existing ones. The proposed research will provide numerical tools to allow prediction of loads induced into rock bolts by nearby tunnels, leading to more economical and safer tunnel design.
    Read more Read less
    More information
    Funded Activity

    Linkage Projects - Grant ID: LP0991643

    Funder
    Australian Research Council
    Funding Amount
    $156,840.00
    Summary
    Enhanced Analysis of Time Dependent Viscous Behaviour of Soft Clay. Often post construction settlements of structures overlying clayey soils have been observed to be more than those predicted, or the predicted rate of settlement is not correct. The main benefit of this research is providing an accurate but simplified approach, which can be used by practicing engineers to predict the post construction settlement of structures in the design phase of construction projects. The community can conside .... Enhanced Analysis of Time Dependent Viscous Behaviour of Soft Clay. Often post construction settlements of structures overlying clayey soils have been observed to be more than those predicted, or the predicted rate of settlement is not correct. The main benefit of this research is providing an accurate but simplified approach, which can be used by practicing engineers to predict the post construction settlement of structures in the design phase of construction projects. The community can considerably benefit from the findings of this project including safer structures, significant reduction in the future maintenance costs and enhancing the performance of bridges, buildings, roads, railways and dams with less cracks and differential settlement.
    Read more Read less
    More information
    Funded Activity

    Linkage Infrastructure, Equipment And Facilities - Grant ID: LE0228900

    Funder
    Australian Research Council
    Funding Amount
    $603,000.00
    Summary
    Testing facility for heavily loaded bridge and barrier systems. Government and industry are increasing truck masses from current single articulated 42.5 tonne trucks to 160 tonne multi-bogie trucks. This will provide Australia with over $1 billion of potential benefits and an efficient and competitive transport industry. To capture these benefits and further progress Australia's economy, considerable collaborative research on a number of fronts must be carried out investigating how bridges and b .... Testing facility for heavily loaded bridge and barrier systems. Government and industry are increasing truck masses from current single articulated 42.5 tonne trucks to 160 tonne multi-bogie trucks. This will provide Australia with over $1 billion of potential benefits and an efficient and competitive transport industry. To capture these benefits and further progress Australia's economy, considerable collaborative research on a number of fronts must be carried out investigating how bridges and barriers can perform safely when subjected to very heavy traffic and impact loads under laboratory and typical service conditions. This application seeks funds for establishing a unique hi-tech testing facility in Australia vital for advancing such infrastructure technology.
    Read more Read less
    More information
    Funded Activity

    Linkage Projects - Grant ID: LP0454304

    Funder
    Australian Research Council
    Funding Amount
    $70,668.00
    Summary
    High Strength Steel Protection Bollards. Terrorist attacks cost Australians much human grief and millions of dollars. Prevention of an attack is paramount. Passive road bollards are commonly used to stop a vehicle approaching and/or entering security sensitive infrastructure. Thin-walled tubes are used to manufacture such bollards. However there is a lack of knowledge about their behaviour, and in particular high strength alloy steel bollards, when subjected to impact loads. The investigators wi .... High Strength Steel Protection Bollards. Terrorist attacks cost Australians much human grief and millions of dollars. Prevention of an attack is paramount. Passive road bollards are commonly used to stop a vehicle approaching and/or entering security sensitive infrastructure. Thin-walled tubes are used to manufacture such bollards. However there is a lack of knowledge about their behaviour, and in particular high strength alloy steel bollards, when subjected to impact loads. The investigators will apply their extensive knowledge in thin-walled tubular structures to establish the most economical means of designing high strength bollards. This knowledge will be transferred into design standards and Australia's limited defence resources.
    Read more Read less
    More information

    Showing 1-6 of 6 Funded Activites

    Advanced Search

    Advanced search on the Researcher index.

    Advanced search on the Funded Activity index.

    Advanced search on the Organisation index.

    National Collaborative Research Infrastructure Strategy

    The Australian Research Data Commons is enabled by NCRIS.

    ARDC CONNECT NEWSLETTER

    Subscribe to the ARDC Connect Newsletter to keep up-to-date with the latest digital research news, events, resources, career opportunities and more.

    Subscribe

    Quick Links

    • Home
    • About Research Link Australia
    • Product Roadmap
    • Documentation
    • Disclaimer
    • Contact ARDC

    We acknowledge and celebrate the First Australians on whose traditional lands we live and work, and we pay our respects to Elders past, present and emerging.

    Copyright © ARDC. ACN 633 798 857 Terms and Conditions Privacy Policy Accessibility Statement
    Top
    Quick Feedback