Linkage Infrastructure, Equipment And Facilities - Grant ID: LE0452650
Funder
Australian Research Council
Funding Amount
$696,005.00
Summary
South Australian Virtual Reality Centre (SAVRC). It is proposed to install a fully immersive three dimensional visualisation facility in Adelaide, at a cost of $5.3 million including requested ARC contribution of $696,005. Applicant Institutions (Adelaide, Flinders, UniSA and Curtin universities) and Industry will provide the remainder.
The facility will support South Australia's leading scientific researchers in the sciences, engineering, business management, carbon dioxide sequestration, p ....South Australian Virtual Reality Centre (SAVRC). It is proposed to install a fully immersive three dimensional visualisation facility in Adelaide, at a cost of $5.3 million including requested ARC contribution of $696,005. Applicant Institutions (Adelaide, Flinders, UniSA and Curtin universities) and Industry will provide the remainder.
The facility will support South Australia's leading scientific researchers in the sciences, engineering, business management, carbon dioxide sequestration, petroleum exploration and production, space environment, bioinformatics, architecture, surgery, dentistry, archaeology and arts.
The facility will enable researchers and industry to significantly leverage other projects leading to much improved research outcomes and efficiency, potentially worth a hundred million dollars or more.
Read moreRead less
A new geomechnical tool for the evaluation of hydrocarbon trap integrity. Hydrocarbon exploration drilling is an intrinsically high risk, high cost activity. Even once a potential reservoir is located there remains the possibility that under recent geological activity the trap has become breached and leaked due to failure of overlying or adjacent rock. This Project will develop a technique that builds on current predictive techniques, and numerical modelling methods, to produce a series of sub-s ....A new geomechnical tool for the evaluation of hydrocarbon trap integrity. Hydrocarbon exploration drilling is an intrinsically high risk, high cost activity. Even once a potential reservoir is located there remains the possibility that under recent geological activity the trap has become breached and leaked due to failure of overlying or adjacent rock. This Project will develop a technique that builds on current predictive techniques, and numerical modelling methods, to produce a series of sub-surface geomechanical models for four important petroleum basins. This new and integrated geomechanical approach will improve current predictive capabilities for detecting breached traps, thus enhancing prospectivity in the major petroleum provinces of Australia.Read moreRead less
Managing Fresh-Water Resources in Saline Environments. Australian industry and urban developments often rely on a secure supply of fresh water. In many situations, the fresh water occurs adjacent to large expanses of saline water. This poses special constraints on how the fresh water can be recovered. This project undertakes careful mathematical modelling of fresh water recovery from reservoirs and from within islands (where it may be the only practical source of drinking water). The injecti ....Managing Fresh-Water Resources in Saline Environments. Australian industry and urban developments often rely on a secure supply of fresh water. In many situations, the fresh water occurs adjacent to large expanses of saline water. This poses special constraints on how the fresh water can be recovered. This project undertakes careful mathematical modelling of fresh water recovery from reservoirs and from within islands (where it may be the only practical source of drinking water). The injection and extraction of ground water in novel "mineral leaching" mining technology will also be investigated.Read moreRead less
Seismic response of partially saturated petroleum reservoir zones: towards quantitative recovery monitoring. In most Australian reservoirs less than 50% of the original oil in place is recovered. A major factor that contributes to low recovery rates is bypassed oil/gas. Even a small, 1% improvement in recovery is of substantial economic significance. The proposed project aims to develop quantitative models for reservoir monitoring of zones with bypassed hydrocarbons using time-lapse (4D) seismic ....Seismic response of partially saturated petroleum reservoir zones: towards quantitative recovery monitoring. In most Australian reservoirs less than 50% of the original oil in place is recovered. A major factor that contributes to low recovery rates is bypassed oil/gas. Even a small, 1% improvement in recovery is of substantial economic significance. The proposed project aims to develop quantitative models for reservoir monitoring of zones with bypassed hydrocarbons using time-lapse (4D) seismic measurements, and thus to improve the hydrocarbon recovery factors. Developing these models will be a cutting edge research achievement, which will make a significant contribution to the knowledge base of the discipline and advance the international reputation of Australian science.Read moreRead less
Towards efficient development of geothermal resources in Australia: an improved simulation package for fluid flow in fractured geothermal reservoirs. Australia possesses vast deep earth geothermal resources, which are cheap, clean, reliable, sustainable and renewable. By supporting the development of geothermal resources, the fundamental research project will greatly contribute to many Australian social and economic priorities: providing immediate mitigation of climate change and greenhouse gas ....Towards efficient development of geothermal resources in Australia: an improved simulation package for fluid flow in fractured geothermal reservoirs. Australia possesses vast deep earth geothermal resources, which are cheap, clean, reliable, sustainable and renewable. By supporting the development of geothermal resources, the fundamental research project will greatly contribute to many Australian social and economic priorities: providing immediate mitigation of climate change and greenhouse gas emissions; reducing dependence on external sources of fuels and oil price uncertainty; meeting the country's growing energy needs; therefore, supporting an Environmentally Sustainable Australia. Moreover, the project enhances Australian research recognition in the fields of fractured and geothermal simulation. It also provides high level education for five research students.Read moreRead less
Confined comminution and particle flow: a general model for large-scale canonical solutions. The project integrates recent advances in continuum mechanics to develop a novel theory of comminution for large-scale problems of grain-size reduction, beyond the reach of particle-based simulations. We will deliver new knowledge and predictive tools by solving fundamental and significant comminution problems. Underpinning this development will be a direct link between energy and particle kinematics. Th ....Confined comminution and particle flow: a general model for large-scale canonical solutions. The project integrates recent advances in continuum mechanics to develop a novel theory of comminution for large-scale problems of grain-size reduction, beyond the reach of particle-based simulations. We will deliver new knowledge and predictive tools by solving fundamental and significant comminution problems. Underpinning this development will be a direct link between energy and particle kinematics. This unique methodology will enable the prediction of energy flow in fault zones, and energy losses from machine to particle and between particles.Read moreRead less
Scour and scour protection around gravity anchors. The costs for scour protection around gravity anchors in a typical offshore project are in the order of 10-20 million dollars. With the increasing number of gravity anchors being installed in Australian waters, significant cost savings are expected to be achieved through improved understanding of local scour and scour protection around gravity anchors. The outcomes of this project can be applied directly to the design of new large diameter pipel ....Scour and scour protection around gravity anchors. The costs for scour protection around gravity anchors in a typical offshore project are in the order of 10-20 million dollars. With the increasing number of gravity anchors being installed in Australian waters, significant cost savings are expected to be achieved through improved understanding of local scour and scour protection around gravity anchors. The outcomes of this project can be applied directly to the design of new large diameter pipelines, will lead to reduction of scour protection costs and enhancement of safety of the pipeline to be stabilized, and increase the competitiveness of Australian oil and gas industry.Read moreRead less
Special Research Initiatives - Grant ID: SR0354778
Funder
Australian Research Council
Funding Amount
$30,000.00
Summary
Deep Earth Resource Characterisation and Extraction - An Integrated Geoscience Approach. Sustainability, economy and safety in resource recovery require a high level of understanding of the mechanics of geomaterials in their natural conditions and a multidisciplinary approach to the geotechnical issues involved. This initiative aims to bridge gaps between geotechnical disciplines, to combine the testing, analytical skills and experience of the research groups and to incorporate expertise and ide ....Deep Earth Resource Characterisation and Extraction - An Integrated Geoscience Approach. Sustainability, economy and safety in resource recovery require a high level of understanding of the mechanics of geomaterials in their natural conditions and a multidisciplinary approach to the geotechnical issues involved. This initiative aims to bridge gaps between geotechnical disciplines, to combine the testing, analytical skills and experience of the research groups and to incorporate expertise and ideas from the cognate disciplines of geology and geophysics so that innovative engineering practice will develop. This approach should achieve breakthroughs in understanding the behaviour of, and the safe economic extraction from deep resources including minerals, coal, gas drainage, petroleum and geothermal energy.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE0668019
Funder
Australian Research Council
Funding Amount
$240,000.00
Summary
An Advanced Computed Tomography Facility - high capacity and high resolution for dynamic studies in porous and granular materials. Characterising complex materials in 3D is an emerging discipline which is driving design concepts for new materials and assists in understanding properties of real world materials. The ANU/UNSW collaboration has developed an internationally recognized program in this emerging discipline and successfully applied the technology to applications in the oil and gas indust ....An Advanced Computed Tomography Facility - high capacity and high resolution for dynamic studies in porous and granular materials. Characterising complex materials in 3D is an emerging discipline which is driving design concepts for new materials and assists in understanding properties of real world materials. The ANU/UNSW collaboration has developed an internationally recognized program in this emerging discipline and successfully applied the technology to applications in the oil and gas industry, groundwater remediation, tissue engineering, medical diagnosis of osteoporosis, granular packing and the design of new materials. The present application will give the collaboration the ability to study a larger number of systems and to image the dynamics of materials in 3D. This will significantly broaden the impact and scope of the applications of this new technology.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE0775616
Funder
Australian Research Council
Funding Amount
$350,000.00
Summary
Advanced Testing Facility for Geological Sequestration of Greenhouse Gases. Predicted climate changes can cause disastrous impacts on nation's human health, agriculture, infrastructure and natural ecosystems. The reduction of greenhouse emissions as required by Kyoto Protocol while protecting Australian industries and jobs is a massive challenge. The long-term sequestration of CO2 in deep geological formations is considered to be the most viable solution. This technology, however, is at its i ....Advanced Testing Facility for Geological Sequestration of Greenhouse Gases. Predicted climate changes can cause disastrous impacts on nation's human health, agriculture, infrastructure and natural ecosystems. The reduction of greenhouse emissions as required by Kyoto Protocol while protecting Australian industries and jobs is a massive challenge. The long-term sequestration of CO2 in deep geological formations is considered to be the most viable solution. This technology, however, is at its infancy and a concerted national research effort is urgently required. The multi-user Facility will enable closer collaboration with researchers in academia and industry, and will be integral in training the next generation of Australian scientists in the geological sequestration and wealth from the earth and the ocean.Read moreRead less