Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce ....Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce the financial burden placed on taxpayers for cost overruns experienced as well as improve the profitability of organisations. This will lead to greater investment, and contribution to gross domestic product.Read moreRead less
Discovery Early Career Researcher Award - Grant ID: DE130100205
Funder
Australian Research Council
Funding Amount
$375,000.00
Summary
Optimisation of transit priority in a transportation network. This project is aimed at developing an optimised approach to combine various types of public transport priority in an urban network which can be used by transport planners to increase the efficiency of traffic movements and reduce traffic congestion. The case study is the network of Brisbane including all arterial and local roads.