ARDC Research Link Australia Research Link Australia   BETA Research
Link
Australia
  • ARDC Newsletter Subscribe
  • Contact Us
  • Home
  • About
  • Feedback
  • Explore Collaborations
  • Researcher
  • Funded Activity
  • Organisation
  • Researcher
  • Funded Activity
  • Organisation
  • Researcher
  • Funded Activity
  • Organisation

Need help searching? View our Search Guide.

Advanced Search

Current Selection
Scheme : Discovery Projects
Australian State/Territory : WA
Field of Research : Operations Research
Clear All
Filter by Field of Research
Operations Research (9)
Numerical and Computational Mathematics (4)
Optimisation (4)
Applied Mathematics (3)
Computation Theory And Mathematics Not Elsewhere Classified (2)
Building Construction Management (1)
Civil Engineering (1)
Computation Theory and Mathematics not elsewhere classified (1)
Construction Engineering (1)
Control Systems, Robotics and Automation (1)
Expert Systems (1)
Financial Economics (1)
Financial Mathematics (1)
Infrastructure Engineering and Asset Management (1)
Probability Theory (1)
Statistics (1)
Stochastic Analysis and Modelling (1)
Systems Theory And Control (1)
Filter by Socio-Economic Objective
Expanding Knowledge in the Mathematical Sciences (4)
Application packages (2)
Mathematical sciences (2)
Productivity (2)
Application Software Packages (excl. Computer Games) (1)
Civil Construction Processes (1)
Commercial (1)
Construction Design not elsewhere classified (1)
Construction Processes not elsewhere classified (1)
Expanding Knowledge in Economics (1)
Expanding Knowledge in Engineering (1)
Industrial (1)
Industry (1)
Integrated systems (1)
Other (1)
Filter by Funding Provider
Australian Research Council (9)
Filter by Status
Closed (9)
Filter by Scheme
Discovery Projects (9)
Filter by Country
Australia (9)
Filter by Australian State/Territory
WA (9)
QLD (1)
VIC (1)
  • Researchers (10)
  • Funded Activities (9)
  • Organisations (3)
  • Funded Activity

    Discovery Projects - Grant ID: DP140100718

    Funder
    Australian Research Council
    Funding Amount
    $375,000.00
    Summary
    Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce .... Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce the financial burden placed on taxpayers for cost overruns experienced as well as improve the profitability of organisations. This will lead to greater investment, and contribution to gross domestic product.
    Read more Read less
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP160102819

    Funder
    Australian Research Council
    Funding Amount
    $396,765.00
    Summary
    Risk and Reliability in Stochastic Optimisation and Equilibrium. This project seeks to develop theory and methodology in optimisation which take advantage of recent progress in understanding and treating risk in decision making. Problems of optimisation in the face of uncertainty must confront the risk inherent in having to make reliable decisions before knowing the outcomes of crucial random variables on which costs and constraints may depend. Recent theoretical developments, featuring ‘measure .... Risk and Reliability in Stochastic Optimisation and Equilibrium. This project seeks to develop theory and methodology in optimisation which take advantage of recent progress in understanding and treating risk in decision making. Problems of optimisation in the face of uncertainty must confront the risk inherent in having to make reliable decisions before knowing the outcomes of crucial random variables on which costs and constraints may depend. Recent theoretical developments, featuring ‘measures of risk’ beyond just-expected values and quantiles offer hope of major new advances. This project aims to achieve such advances not only in optimisation but also in models of equilibrium that likewise have to deal with uncertainty. Extending current theory and methodology to such multi-stage stochastic models is a challenge. Besides taking up this challenge for its own sake, a major goal of this research will be to use the results in solution algorithms.
    Read more Read less
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP110100083

    Funder
    Australian Research Council
    Funding Amount
    $315,000.00
    Summary
    Optimal control of nonlinear delay systems: theory, algorithms, and applications. Time delays are present in many engineering systems, including robots, irrigation canals, and chemical reactors. This project aims to develop state-of-the-art techniques for controlling systems with time delays in an optimal manner.
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP110102855

    Funder
    Australian Research Council
    Funding Amount
    $240,000.00
    Summary
    Effective computational methods for nonlinear cone optimisation with industrial applications. This project brings together a number of national and international researchers whose combined expertise will focus on solving optimisation problems arising in a range of industries. The work will result in new cutting edge optimisation technology that can benefit industry and the community.
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP0559113

    Funder
    Australian Research Council
    Funding Amount
    $255,000.00
    Summary
    HYBRID METHODS FOR SOLVING LARGE-SCALE OPTIMISATION PROBLEMS. Mathematical modelling and optimisation plays a crucial role in the advancement of modern business, science and technology. A significant benefit of this project is the development of a range of powerful computational tools for improving the productivity of Australian industry, including: agriculture; communications; defence; manufacturing; mining and petroleum; transport and logistics. These tools will be built upon advances in the f .... HYBRID METHODS FOR SOLVING LARGE-SCALE OPTIMISATION PROBLEMS. Mathematical modelling and optimisation plays a crucial role in the advancement of modern business, science and technology. A significant benefit of this project is the development of a range of powerful computational tools for improving the productivity of Australian industry, including: agriculture; communications; defence; manufacturing; mining and petroleum; transport and logistics. These tools will be built upon advances in the fundamental theory developed by the research team. The resulting high quality publications and associated algorithms will greatly enhance Australia's international scientific reputation and provide Australian industry with new cutting-edge optimisation technology.
    Read more Read less
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP0453258

    Funder
    Australian Research Council
    Funding Amount
    $243,700.00
    Summary
    Forensic management approach to rework mitigation and prevention in construction. Rework is the unnecessary effort of re-doing a process or activity. The direct costs of rework in construction have been reported to be as high as 25% of project costs. These rework costs would be higher if they included the intangible, but real costs of disruption caused by schedule delays, litigation, and dysfunctional contract relationships. To reduce rework in construction projects a forensic project managem .... Forensic management approach to rework mitigation and prevention in construction. Rework is the unnecessary effort of re-doing a process or activity. The direct costs of rework in construction have been reported to be as high as 25% of project costs. These rework costs would be higher if they included the intangible, but real costs of disruption caused by schedule delays, litigation, and dysfunctional contract relationships. To reduce rework in construction projects a forensic project management model that can be used to stimulate learning and process improvement will be developed, evaluated and validated. This will enable the design of strategies to reduce rework and improve the overall performance of projects.
    Read more Read less
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP0665946

    Funder
    Australian Research Council
    Funding Amount
    $605,760.00
    Summary
    Robust methods for hard optimization problems. Highly advanced industrial and information-based societies depend on complex systems that underpin their infrastructure and technologies. Mathematical modelling and optimization techniques are most frequently deployed for the development and refinement of these systems. This project focuses on an important class of difficult optimization problems that arise in many applications. A significant benefit of this project is the development of a number of .... Robust methods for hard optimization problems. Highly advanced industrial and information-based societies depend on complex systems that underpin their infrastructure and technologies. Mathematical modelling and optimization techniques are most frequently deployed for the development and refinement of these systems. This project focuses on an important class of difficult optimization problems that arise in many applications. A significant benefit of this project is the development of a number of robust methods for these hard optimization problems. These methods will be built upon advances in the fundamental theory developed by the research team. The resulting high quality publications and associated algorithms will greatly enhance Australia's international scientific reputation.
    Read more Read less
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP0452984

    Funder
    Australian Research Council
    Funding Amount
    $210,000.00
    Summary
    Designing an Intelligent Process Operation Management System. The complexity and sophistication of current generation of industrial processes, and the growing need for autonomous agents that control physical systems, motivate the need for the development of an intelligent process operation management system. In this project, the innovative integration of theories from different scientific fields (computer systems, process engineering, systems and control engineering) provides an excellent platfo .... Designing an Intelligent Process Operation Management System. The complexity and sophistication of current generation of industrial processes, and the growing need for autonomous agents that control physical systems, motivate the need for the development of an intelligent process operation management system. In this project, the innovative integration of theories from different scientific fields (computer systems, process engineering, systems and control engineering) provides an excellent platform for development of a smart data management tool, to oversee the major operational tasks within the plant and help the operators and engineers to make more informed decisions. Direct application of the techniques developed in this study to a pilot case study, could be used as a benchmark to show the potential benefits that can be gained through smart information use and data management.
    Read more Read less
    More information
    Funded Activity

    Discovery Projects - Grant ID: DP120100928

    Funder
    Australian Research Council
    Funding Amount
    $330,000.00
    Summary
    Improving risk management based on short-term stochastic forecast for financial decisions. The project targets the problems of strategy selection in the framework of mathematical finance. The aim is to find ways to reduce the impact of forecast errors in the presence of uncertainty. Related forecasting algorithms and solutions of optimization problems will be obtained.
    More information

    Showing 1-9 of 9 Funded Activites

    Advanced Search

    Advanced search on the Researcher index.

    Advanced search on the Funded Activity index.

    Advanced search on the Organisation index.

    National Collaborative Research Infrastructure Strategy

    The Australian Research Data Commons is enabled by NCRIS.

    ARDC CONNECT NEWSLETTER

    Subscribe to the ARDC Connect Newsletter to keep up-to-date with the latest digital research news, events, resources, career opportunities and more.

    Subscribe

    Quick Links

    • Home
    • About Research Link Australia
    • Product Roadmap
    • Documentation
    • Disclaimer
    • Contact ARDC

    We acknowledge and celebrate the First Australians on whose traditional lands we live and work, and we pay our respects to Elders past, present and emerging.

    Copyright © ARDC. ACN 633 798 857 Terms and Conditions Privacy Policy Accessibility Statement
    Top
    Quick Feedback