Hybrid Pile-Drain System to Stabilise Railways Built on Soft Soils. Australian coastal soils often pose significant challenges in the design and construction of railways. The project aims to develop a novel hybrid system of pipe piles & prefabricated vertical drains installed to prevent soft foundation soil (subgrade) from excessive yielding under prolonged cyclic loading by heavy-haul trains. Using large-scale physical model simulations and field trials supported by numerical analysis of soil-p ....Hybrid Pile-Drain System to Stabilise Railways Built on Soft Soils. Australian coastal soils often pose significant challenges in the design and construction of railways. The project aims to develop a novel hybrid system of pipe piles & prefabricated vertical drains installed to prevent soft foundation soil (subgrade) from excessive yielding under prolonged cyclic loading by heavy-haul trains. Using large-scale physical model simulations and field trials supported by numerical analysis of soil-pile-drain interaction mechanisms, this innovative concept will be examined to establish a user-friendly design methodology. For rail operators, the outcomes will generate substantially reduced maintenance costs, while extending the longevity of track infrastructure to ensure faster and heavier trains of the future. Read moreRead less