Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechani ....Understanding mud pumping in heavy haul railroads. This project aims to examine the factors that cause mud pumping and evaluate the effectiveness of sub-surface drainage to prevent rail track instability. Fast heavy haul operations (such as loads used in mining and agriculture) impart repeated loads on the natural formation that can result in mud pumping. If the build-up of water pressure becomes excessive this can cause track failure. Through an experimental program and field study, the mechanisms of mud pumping, incorporating train loads and frequencies, will be studied, and the role of vertically installed drains will be quantified for improved practical design. The project aims to contribute to improved track longevity and reduced maintenance costs, with a corresponding boost in rail productivity.Read moreRead less
Industrial Transformation Training Centres - Grant ID: IC170100006
Funder
Australian Research Council
Funding Amount
$3,937,625.00
Summary
ARC Training Centre for Advanced Technologies in Rail Track Infrastructure. The ARC Training Centre for Advanced Technologies in Rail Track Infrastructure aims to transform Australia’s rail construction and maintenance technologies through specialist training of industry-focused researchers. Generation of new knowledge and close collaboration with companies within the rail supply chain will result in enhanced rail capacity and supply chain efficiency across the rail network. This will include in ....ARC Training Centre for Advanced Technologies in Rail Track Infrastructure. The ARC Training Centre for Advanced Technologies in Rail Track Infrastructure aims to transform Australia’s rail construction and maintenance technologies through specialist training of industry-focused researchers. Generation of new knowledge and close collaboration with companies within the rail supply chain will result in enhanced rail capacity and supply chain efficiency across the rail network. This will include increased axle loads and higher speeds, greater safety margins, reduced construction and maintenance costs, and a body of competent railway professionals in the nation’s work force.Read moreRead less
A novel quantitative risk assessment framework for fractured rock slopes. Rock slope instabilities present grave risks to life and to the serviceability of major Australian infrastructure such as mines, roads and railways, and to coastal recreation areas. This project aims at developing tools for the quantitative risk assessment of fractured rock slopes based on rigorous rock mechanics, numerical methods and probabilistic methods.
The research outcomes will improve our understanding of natural ....A novel quantitative risk assessment framework for fractured rock slopes. Rock slope instabilities present grave risks to life and to the serviceability of major Australian infrastructure such as mines, roads and railways, and to coastal recreation areas. This project aims at developing tools for the quantitative risk assessment of fractured rock slopes based on rigorous rock mechanics, numerical methods and probabilistic methods.
The research outcomes will improve our understanding of natural and engineering rock slopes, reduce the uncertainties in the prediction of the safety of infrastructures, and thus minimize the loss and damage. The research outcomes can also be used to maintain workplace safety in mining environments and avoid disruptions to production.
Read moreRead less
Erosion of embankment dams and dam spillways. In excess of $250M is spent annually to maintain, upgrade, improve safety and monitor performance of Australian dams. Improved methods for assessing both spillway and internal erosion, the cause of 50 per cent of embankment dam failures and incidents requiring repairs, will be developed, maximising dam safety and minimising maintenance expenditure.