The Australian Research Data Commons (ARDC) invites you to participate in a short survey about your
interaction with the ARDC and use of our national research infrastructure and services. The survey will take
approximately 5 minutes and is anonymous. It’s open to anyone who uses our digital research infrastructure
services including Reasearch Link Australia.
We will use the information you provide to improve the national research infrastructure and services we
deliver and to report on user satisfaction to the Australian Government’s National Collaborative Research
Infrastructure Strategy (NCRIS) program.
Please take a few minutes to provide your input. The survey closes COB Friday 29 May 2026.
Complete the 5 min survey now by clicking on the link below.
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE180100101
Funder
Australian Research Council
Funding Amount
$744,697.00
Summary
New generation facility for impact testing. This project aims to develop a new generation, national-impact testing facility to study the impact response of civil and mechanical structures and components. This project expects to seek simultaneous, realistic impact scenarios with very high velocities, which were previously impossible. This will enhance the capability for innovative research on real-time behaviour of components/systems under high amplitude impacts to augment their protection throug ....New generation facility for impact testing. This project aims to develop a new generation, national-impact testing facility to study the impact response of civil and mechanical structures and components. This project expects to seek simultaneous, realistic impact scenarios with very high velocities, which were previously impossible. This will enhance the capability for innovative research on real-time behaviour of components/systems under high amplitude impacts to augment their protection through advanced materials. This project is essential for research on rational design philosophies and effective retrofitting of high-risk buildings, infrastructure and armoured vehicles. Benefits include the saving of lives and property through new knowledge from credible impact testing.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE140100010
Funder
Australian Research Council
Funding Amount
$900,000.00
Summary
National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique fac ....National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique facility will offer a national and international hub for industry-driven research and consulting. The project outcomes will propel more Australian researchers to be among the world-leaders of rail technologies providing better solutions to challenging track environments. Prototype testing will ensure safer and cost-effective track designs.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100089
Funder
Australian Research Council
Funding Amount
$500,000.00
Summary
Performance level structural testing facility. A structural testing facility is proposed for the new Advanced Engineering Building at The University of Queensland. The focus of the research supported by this facility will ensure the functionality of Australia’s infrastructure resources and the development of new engineering solutions that will enhance the country’s long-term economic growth.
On-line monitoring of cyanobacteria to predict coagulant doses and powdered activated carbon application in water treatment. Cyanobacteria, more commonly known as blue-green algae, can impact water quality by releasing toxins that can be harmful to human health and imparting unpleasant taste and odours to the water. This project will support the water industry in managing these risks by providing a rapid, on-line tool to assist in their removal during water treatment.
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE160100206
Funder
Australian Research Council
Funding Amount
$800,000.00
Summary
National Rock, Concrete and Advanced Composite Testing Capability. National rock, concrete and advanced composite testing capability:
The aim of the project is to develop a national hybrid biaxial/true triaxial load testing facility to serve the needs of geotechnical, structural, mining and materials researchers and engineers for sophisticated testing. It would address the need for leading edge testing and analysis of the deformation and strength of rock, concrete, and thin plates comprising me ....National Rock, Concrete and Advanced Composite Testing Capability. National rock, concrete and advanced composite testing capability:
The aim of the project is to develop a national hybrid biaxial/true triaxial load testing facility to serve the needs of geotechnical, structural, mining and materials researchers and engineers for sophisticated testing. It would address the need for leading edge testing and analysis of the deformation and strength of rock, concrete, and thin plates comprising metals, composites and polymers, under a wide range of loading conditions. The facility would accommodate cubic specimens up to 300 millimetres and be able to apply 10 megapascals of stress in up to three orthogonal directions. State-of-the-art monitoring equipment is designed to assess the degree of damage caused by testing, simulating damage induced by blasting, cutting, static loading and/or impact.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE150100130
Funder
Australian Research Council
Funding Amount
$320,000.00
Summary
An earthquake shaking table to investigate soil-structure interactions. An earthquake shaking table to investigate soil-structure interactions: This project aims to develop Australia's most advanced earthquake shaking table. Earthquakes are a problem of great significance to Australia. Infrastructure in civil, transport, mining and energy sectors may be at an unacceptable risk of damage under earthquake loading as current design practices do not account for the interaction between infrastructure ....An earthquake shaking table to investigate soil-structure interactions. An earthquake shaking table to investigate soil-structure interactions: This project aims to develop Australia's most advanced earthquake shaking table. Earthquakes are a problem of great significance to Australia. Infrastructure in civil, transport, mining and energy sectors may be at an unacceptable risk of damage under earthquake loading as current design practices do not account for the interaction between infrastructure and the ground under such loading. The shaking table will simulate earthquakes and enable controlled testing of three-tonne models of foundation and soil-structure interaction systems typical of Australia's infrastructure. The discoveries made are expected to be integral to the modernisation of Australia's seismic design standards so that earthquake-induced damage and risk exposure can be minimised.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE120100011
Funder
Australian Research Council
Funding Amount
$700,000.00
Summary
The national geotechnical centrifuge facility. A new geotechnical centrifuge will enable the modelling of complex offshore and onshore structures. The new facility will support many geotechnical fields, associated with the economical and geographical development of Australia, and ensure that Australia will maintain its leadership within the international physical modelling community.
Boosting up Productivity: Optimizing Scaffolding Life Cycle Management with Virtual Design and Construction. Scaffolding management can be critical to construction industries across oil and gas, building, and infrastructure sectors. It can lead to low productivity and safety due to static and poor planning. This project aims to innovatively integrate a decision support system, virtual design and construction, and onsite monitoring into one dynamic planning system to significantly lift productivi ....Boosting up Productivity: Optimizing Scaffolding Life Cycle Management with Virtual Design and Construction. Scaffolding management can be critical to construction industries across oil and gas, building, and infrastructure sectors. It can lead to low productivity and safety due to static and poor planning. This project aims to innovatively integrate a decision support system, virtual design and construction, and onsite monitoring into one dynamic planning system to significantly lift productivity. The emphasis is on producing optimal solutions for planning, design, erection, monitoring, dismantling, and relocation of scaffolding, so that productivity is maximised subject to satisfying required cost and safety constraints. The project aims to therefore secure long-term economic benefits by improving productivity and enhancing project performance.Read moreRead less
Industrial Transformation Training Centres - Grant ID: IC150100023
Funder
Australian Research Council
Funding Amount
$4,000,000.00
Summary
ARC Training Centre for Advanced Manufacturing of Prefabricated Housing. ARC Training Centre for Advanced Manufacturing of Prefabricated Housing. This training centre aims to unlock the potential for growth of Australia’s prefabricated building industry by creating a sustainable training ecosystem including both industry and universities. It seeks to enable the next generation of engineers and architects to apply advanced manufacturing principles to prefabricated modular buildings. This emerging ....ARC Training Centre for Advanced Manufacturing of Prefabricated Housing. ARC Training Centre for Advanced Manufacturing of Prefabricated Housing. This training centre aims to unlock the potential for growth of Australia’s prefabricated building industry by creating a sustainable training ecosystem including both industry and universities. It seeks to enable the next generation of engineers and architects to apply advanced manufacturing principles to prefabricated modular buildings. This emerging highly trained workforce, driven by the needs of the customer, should identify innovations in the use of advanced materials, designs for manufacturing, and assembly. The centre aims to secure a competitive advantage for Australia in the global value chain leading to local employment growth and increased exports of prefabricated products and services.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE110100052
Funder
Australian Research Council
Funding Amount
$870,000.00
Summary
Hybrid testing facility for structures under extreme loads. This unique testing facility will provide a regional and national focus for large three dimensional static and dynamic testing of components, systems and infrastructure used in civil engineering, mining and railways as well as in the aerospace and automotive industries.