Linkage Infrastructure, Equipment And Facilities - Grant ID: LE210100019
Funder
Australian Research Council
Funding Amount
$664,580.00
Summary
Collaborative robotics for structural assembly and construction automation. Recent robotic technologies present great opportunity for construction industry to improve quality and productivity while no state of the art research infrastructure has been developed yet for this need. The proposed facility aims to provide a unique platform on research and development for structural assembly and construction automation. It
features by a flexible and adaptive design and instrumentation of structures and ....Collaborative robotics for structural assembly and construction automation. Recent robotic technologies present great opportunity for construction industry to improve quality and productivity while no state of the art research infrastructure has been developed yet for this need. The proposed facility aims to provide a unique platform on research and development for structural assembly and construction automation. It
features by a flexible and adaptive design and instrumentation of structures and space for a team of collaborative robotics in an interactive environment to achieve automated prefabrication, assembly and building. The outcomes are expected to transform current labor-intensive construction industry to highly automated and accurate manufacturing industry with significant benefits to economy and safety.Read moreRead less
Discovery Early Career Researcher Award - Grant ID: DE190100657
Funder
Australian Research Council
Funding Amount
$330,000.00
Summary
Improving mental health and safety in the construction industry. This project aims to quantify the interdependencies of the psychosocial risk factors the construction workforce is exposed to and contribute to developing strategies for improving the mental health and safety of the Australian construction industry. The suicide rate of Australian construction workers is 84 per cent higher than non-construction workers due to the high psychosocial risks involved. The quantification of these psychoso ....Improving mental health and safety in the construction industry. This project aims to quantify the interdependencies of the psychosocial risk factors the construction workforce is exposed to and contribute to developing strategies for improving the mental health and safety of the Australian construction industry. The suicide rate of Australian construction workers is 84 per cent higher than non-construction workers due to the high psychosocial risks involved. The quantification of these psychosocial risk factors and their interdependencies will enable effective strategies to be designed. The long-term impacts of this project include improving the mental health of the construction workforce, reducing suicide rates and mental health work compensation, enhancing employee productivity, and reducing accidents and injuries. This project will make Australia a global leader in mental health and safety of the construction industry.Read moreRead less
Discovery Early Career Researcher Award - Grant ID: DE200100892
Funder
Australian Research Council
Funding Amount
$419,889.00
Summary
Next-generation, prefabricated, modular, solar heating and cooling system. This project aims to develop a new window design that can reduce the heating of buildings caused by the sun in warm weather and reduce heat loss from buildings in cool weather. This project expects to generate new knowledge on the interaction between solar radiation and the convection of air inside a cavity within the window design. The expected outcome is a framework that can be used to optimize window designs for buildi ....Next-generation, prefabricated, modular, solar heating and cooling system. This project aims to develop a new window design that can reduce the heating of buildings caused by the sun in warm weather and reduce heat loss from buildings in cool weather. This project expects to generate new knowledge on the interaction between solar radiation and the convection of air inside a cavity within the window design. The expected outcome is a framework that can be used to optimize window designs for buildings under various weather conditions. This should allow quick and easy fabrication and implementation of the designs in existing and new buildings, and the windows should significantly reduce building heating and cooling costs.Read moreRead less
Novel multiple-constraint model for green buildings and life-cycle analyses. This project aims to develop a multiple-constraint automation model to perform life-cycle analyses for projects in the Australian construction industry. The model will optimise construction methods for green-building implementation and offer a realistic approach to Green-star status achievement. The Life-cycle model analyses for cost, greenhouse-gas emissions and energy consumption allowing the construction methods to b ....Novel multiple-constraint model for green buildings and life-cycle analyses. This project aims to develop a multiple-constraint automation model to perform life-cycle analyses for projects in the Australian construction industry. The model will optimise construction methods for green-building implementation and offer a realistic approach to Green-star status achievement. The Life-cycle model analyses for cost, greenhouse-gas emissions and energy consumption allowing the construction methods to be optimised for minimum environmental impact. Utilisation of the model should significantly shape an organisations’ strategic planning, while a recognised high Green-star status from Green Building Council of Australia will improve their reputation and bring benefits to the construction industry.Read moreRead less
Structural assembly for remote housing using fibre reinforced composites. This project aims to address construction challenges in remote housing by off-site manufacturing and on-site assembly using fibre reinforced composites and digital made-to-measure approach. Its goal is to generate interdisciplinary knowledge and practical technologies for reliable, affordable and durable housing in remote harsh environments. Intended results include innovative connections and systems with valuable understa ....Structural assembly for remote housing using fibre reinforced composites. This project aims to address construction challenges in remote housing by off-site manufacturing and on-site assembly using fibre reinforced composites and digital made-to-measure approach. Its goal is to generate interdisciplinary knowledge and practical technologies for reliable, affordable and durable housing in remote harsh environments. Intended results include innovative connections and systems with valuable understanding of their performances under various loading scenarios and accurate digital visualization for remote construction. The outcomes expect to unlock remote development, enhance our competitive strengths for manufacturing and construction industries, and further offer new solutions in post-disaster recovery applications.Read moreRead less
Industrial Transformation Training Centres - Grant ID: IC170100006
Funder
Australian Research Council
Funding Amount
$3,937,625.00
Summary
ARC Training Centre for Advanced Technologies in Rail Track Infrastructure. The ARC Training Centre for Advanced Technologies in Rail Track Infrastructure aims to transform Australia’s rail construction and maintenance technologies through specialist training of industry-focused researchers. Generation of new knowledge and close collaboration with companies within the rail supply chain will result in enhanced rail capacity and supply chain efficiency across the rail network. This will include in ....ARC Training Centre for Advanced Technologies in Rail Track Infrastructure. The ARC Training Centre for Advanced Technologies in Rail Track Infrastructure aims to transform Australia’s rail construction and maintenance technologies through specialist training of industry-focused researchers. Generation of new knowledge and close collaboration with companies within the rail supply chain will result in enhanced rail capacity and supply chain efficiency across the rail network. This will include increased axle loads and higher speeds, greater safety margins, reduced construction and maintenance costs, and a body of competent railway professionals in the nation’s work force.Read moreRead less
High-Grade CO2 Concrete for Low Life-Cycle Costing and Emissions. This proposal solves Australia’s concrete-waste-storage problems, and lowers the life-cycle costs and greenhouse-gas emissions by creating CO2 Concrete as a world-first material for high-grade applications. Using an automation system with high-tech software, innovative mixing techniques are proposed to maximise bonding at interfacial transition zones, strengthening CO2 Concrete's quality. The new material CO2 Concrete is created, ....High-Grade CO2 Concrete for Low Life-Cycle Costing and Emissions. This proposal solves Australia’s concrete-waste-storage problems, and lowers the life-cycle costs and greenhouse-gas emissions by creating CO2 Concrete as a world-first material for high-grade applications. Using an automation system with high-tech software, innovative mixing techniques are proposed to maximise bonding at interfacial transition zones, strengthening CO2 Concrete's quality. The new material CO2 Concrete is created, whose strength and durability are comparable to virgin concrete's, leading to new CO2-Concrete specifications for trials in the construction industry. This diversifies the construction industry, reduces landfill area, greening up Australia on a global scale.Read moreRead less
Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and red ....Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and reduction strategies prevails. This research aims to develop a theoretical model that can be used to develop robust containment and reduction strategies to mitigate the adverse economic, productivity and safety consequences that materialize from performing rework during the construction of mega transport projects.Read moreRead less
Discovery Early Career Researcher Award - Grant ID: DE190100646
Funder
Australian Research Council
Funding Amount
$408,000.00
Summary
Active rheology control of fresh concrete using responsive additives. This project aims to investigate innovative techniques for Active Rheology Control (ARC) of concretes using responsive additives interacting with externally applied electromagnetic or temperature signals. ARC is a new concept which will revolutionise concrete pumping by overcoming limitations such as frequent pipe blockages. ARC will also be useful to solve the major barrier faced by 3D concrete printing (3DCP) from becoming a ....Active rheology control of fresh concrete using responsive additives. This project aims to investigate innovative techniques for Active Rheology Control (ARC) of concretes using responsive additives interacting with externally applied electromagnetic or temperature signals. ARC is a new concept which will revolutionise concrete pumping by overcoming limitations such as frequent pipe blockages. ARC will also be useful to solve the major barrier faced by 3D concrete printing (3DCP) from becoming a practical way of construction. 3DCP is an emerging idea for construction but a major barrier is that concrete needs to flow during pumping and extrusion but become stiff soon after placement. This project will explore ARC for achieving the “flow-on-demand” desired by both concrete pumping and 3DCP applications.Read moreRead less
A 21st century laboratory testing device for geotechnical engineering. This project aims to use advanced image analysis and cloud computing technologies to replace manual, time-consuming and subjective geotechnical engineering practices with a rapid, automated, and more rational approach. A new geo-materials testing system based on the existing triaxial apparatus will be developed that employs three-dimensional image capture hardware and advanced image analysis techniques. The data measured over ....A 21st century laboratory testing device for geotechnical engineering. This project aims to use advanced image analysis and cloud computing technologies to replace manual, time-consuming and subjective geotechnical engineering practices with a rapid, automated, and more rational approach. A new geo-materials testing system based on the existing triaxial apparatus will be developed that employs three-dimensional image capture hardware and advanced image analysis techniques. The data measured over the entire sample surface will feed into an automated, intelligent parameter selection procedure combining finite element analysis with numerical optimisation techniques. Application of the proposal’s findings will allow more accurate and efficient engineering design of transport and energy infrastructure that supports modern economies.Read moreRead less