Abstract: The purpose of this paper is to present a modified model for collaboration in BIM-based construction networks (BbCNs). Though BIM is increasingly adopted and implemented across the construction industry, the problems associated with the lack of collaboration among teams in BbCNs remain a major hindrance to reaping the full potential of BIM. Previous studies have been conceptual in nature. This paper, therefore, attempts to modify and validate existing conceptual models that describe collaboration in BbCNs. To modify the conceptual model for collaboration in BbCNs, qualitative data through semi-structured interviews with BIM experts in the industry were collected and analysed using qualitative methods including the use of NVivo software. The proposed model includes influential factors and their sub-factors to collaboration in BbCNs, as well as considering their indicators. Findings reveal that several overlooked concepts, particularly unfavourable BIM contractual arrangements, act as the root causes of the unwillingness of team members in BbCNs to engage in collaborative efforts. The study's findings must be viewed in light of several limitations. First, the interviewees in this study were based in Australia hence their perceptions of BIM collaboration are reflective of the sociotechnical setting of BIM-enabled projects in this country. Also, the findings are based on the perception of experts in the field, rather than analysis of performance measures or quantitative assessment of associations among collaboration outcomes and various factors. This, however, provides the field with fertile grounds for future research. The study benefits researchers by shifting the collaboration discourse in BIM-enabled projects from technology-related issues to the people and contractual-related domains. Moreover, the developed qualitative model provides industry professionals with a point of reference to improve collaboration on BIM-enabled projects. The study benefits researchers by shifting the collaboration discourse in BIM-enabled projects from technology-related issues to the people and contractual-related domains. Moreover, the developed qualitative model provides industry professionals with a point of reference to improve collaboration on BIM-enabled projects. Arguments provided in this study highlight the necessity of considering the contractual arrangement of BIM-related projects and foster the willingness of team members to collaborate. This can be addressed using clear and comprehensive BIM execution plans and clearly explaining the role of BIM managers in the process.
Publisher: Emerald
Date: 21-03-2016
DOI: 10.1108/ECAM-06-2014-0087
Abstract: – The purpose of this paper is to investigate and analyse the perceptions of South Australian construction practitioners on drivers affecting the implementation of reverse logistics (RL). In this context, RL is defined as the process of moving goods from their typical final destination for the purpose of capturing value or ensuring proper disposal. – Semi-structured interviews were conducted with eight practitioners to collect data and the interview transcripts were analysed using the NVivo (version 10) package. Cluster analysis was used to cross-validate the findings and provide an in-depth insight into the findings. – The findings indicate that most of the drivers identified in earlier research are relevant for the construction industry. In addition, the study identified some new drivers that are categorised as “targeted demands by an exclusive clientele”. These drivers were found to be complementary to the economic, environmental and social drivers as previously conceptualised. In addition, a set of factors affecting the strength of drivers that had been overlooked in previous studies emanated from the interview analysis. These include the type of project and the attributes of clients, both of which strongly affect the drivers of RL implementation in construction. – The major limitations are the relatively small size of the s le of interviewees and having interviewees from one geographic area with specific socio-economic characteristics. – The identified drivers and the clustering of RL themes could be used by practitioners as a “road map” for the development of appropriate solutions to successfully promote RL within the construction industry. Organisational energies could thus be channelled towards the drivers that need the most improvement. – The study contributes to this research sphere by employing cluster analysis to customise and contextualise the drivers that were previously identified. The study goes beyond the extant literature by discovering the prominent effects of these drivers on the impact of targeted demands by an exclusive clientele. This could be of great value in terms of creating avenues for future investigations on the topic.
Publisher: Springer Science and Business Media LLC
Date: 02-2018
Publisher: Emerald
Date: 03-05-2016
Abstract: The purpose of this paper is to explore sourcing strategies for facilities management services using core-competency theory of outsourcing. The aim is to develop a screening framework for deciding the suitability of outsourcing versus in-house delivery for these services based on three levels of managerial functions prevalent in a typical commercial organization. A questionnaire survey was administered for facilities managers in Sri Lanka to investigate the relative importance of these managerial functions for facilities management services and obtain their opinions on the best delivery mode. The managerial functions were derived from a literature review and verified using three semi-structured interviews prior to the questionnaire survey design. The findings showed that facilities management services that are aligned to strategic functions are suitable for in-house delivery, while those that are aligned to tactical and operational functions for outsourcing. Further studies should be conducted and extended to other types of organizations beyond commercial ones. Secondly, the quantitative study employed a smaller s le ( n = 40), and the survey items were based on the review of literature which was verified using a very small number of interviews ( n = 3). The proposed framework can be utilized when choosing the best facilities management approach for commercial organizations in developing countries such as Sri Lanka. This study contributes to the body of knowledge on the subject of facilities management by exploring the context in Sri Lankan which has not previously been done.
Publisher: IGI Global
Date: 04-2016
Abstract: This paper investigates the effectiveness of using a corporate enterprise resource planning (ERP) system as a multi-dimensional project control system (MPCS) to monitor and control the work performed on projects, meet the needs and expectations of the project managers and support the requirements of other key stakeholders. A qualitative approach i.e. case study interviews and literature review accompanied by a quantitative computer system validation test approach was deployed. The results from this study suggest that the corporate ERP system is effective at monitoring and controlling the project stakeholder success criteria within a fully integrated environment. The system does however need to be setup and configured for the purpose of MPCS. This study contributes to the field by providing empirical evidence that corporate ERP systems are likely one of the only systems truly capable of solving the age old problem of how to expand the traditional singular dimensional approaches commonly used in project control, thus multiple control dimensions are integrated with each other and other business systems to form a multi-dimensional project control system.
Publisher: Emerald
Date: 25-11-2020
DOI: 10.1108/IJBPA-09-2020-0079
Abstract: Human vibration exposure from hand-operated equipment emissions can lead to irreparable and debilitating hand-arm vibration syndrome (HAVS). While work-place health and well-being (H& WB) policies, strategies and procedures have been extensively researched and documented, little has been done to develop a specific strategic framework tailored to the management of hand-arm vibration (HAV). This study fills that gap. A mixed philosophical approach of interpretivism and critical realism is adopted within a case study of a utilities contractor. Within this overarching epistemological design, action research approach is implemented via a three-stage investigation, namely, relevant company H& WB documents and procedures were examined, leading to the formulation of semi-structured interview questioning of the H& WB team. Their responses informed the next line of questions, delivered to middle-management responsible for overseeing H& S. The findings are instructive in revealing that while substantial documentation management (augmented with protocols and checks) was in place, the system fell short of implementation within the workforce and thus failed to preserve worker H& WB. The investigation generated recommendations for shoring up H& WB deficiencies observed and developed a theoretical model to represent these. Though these recommendations were developed in response to a specific case, they form the core of a HAV operational H& WB strategy framework with applicability over a broader context. This research provides unique insight into contemporary industry practices employed to manage HAV in the workplace and represents an invaluable opportunity to learn from prevailing practices and rectify deficiencies observed.
Publisher: Informa UK Limited
Date: 06-04-2016
Publisher: University of Technology, Sydney (UTS)
Date: 08-09-2016
Abstract: Despite the envisaged benefits of BIM adoption for SMEs, BIM in SMEs has remained an underrepresented area within the available academic literature. This study proposes and draws upon a framework grounded on innovation diffusion theory (IDT) to provide an illuminating insight into the current state of BIM and the main barriers to BIM adoption within Australian SMEs. Based on analyses of 135 questionnaires completed by SMEs through partial least squares structural equation modelling (PLS-SEM) and grounded on the proposed framework, the current state of BIM adoption and barriers to BIM adoption for SMEs are discussed. The findings show that currently around 42% of Australian SMEs use BIM in Level 1 and Level 2 with only around 5% have tried Level 3. It comes to light that lack of knowledge within SMEs and across the construction supply chain is not a major barrier for Australian SMEs. In essence, the main barriers stem from the risks associated with an uncertain return on investment (ROI) for BIM as perceived by key players in SMEs. The findings also show the validity of the framework proposed for explaining BIM adoption in Australian SMEs.
Publisher: Elsevier BV
Date: 12-2017
Publisher: SAGE Publications
Date: 27-05-2015
Abstract: Reverse logistics in construction refers to the movement of products and materials from salvaged buildings to a new construction site. While there is a plethora of studies looking at various aspects of the reverse logistics chain, there is no systematic review of literature on this important subject as applied to the construction industry. Therefore, the objective of this study is to integrate the fragmented body of knowledge on reverse logistics in construction, with the aim of promoting the concept among industry stakeholders and the wider construction community. Through a qualitative meta-analysis, the study synthesises the findings of previous studies and presents some actions needed by industry stakeholders to promote this concept within the real-life context. First, the trend of research and terminology related with reverse logistics is introduced. Second, it unearths the main advantages and barriers of reverse logistics in construction while providing some suggestions to harness the advantages and mitigate these barriers. Finally, it provides a future research direction based on the review.
Publisher: Elsevier BV
Date: 2016
Publisher: Elsevier BV
Date: 11-2018
Publisher: Emerald
Date: 24-04-2020
DOI: 10.1108/ECAM-09-2019-0518
Abstract: Excessive exposure to HAV can lead to hand–arm vibration syndrome (HAVS) which is a major health and well-being issue that can irreparably damage the neurological, vascular and muscular skeletal system. This paper reports upon field research analysis of the hand–arm vibration (HAV) exposure levels of utility workers in the UK construction sector when operating hand-held vibrating power tools. An empirical epistemological lens was adopted to analyse primary quantitative data on the management of hand-held tool trigger times (seconds) collected from field studies. To augment the analysis further, an interpretivist perspective was undertaken to qualitatively analyse interviews held with the participating company's senior management team after field study results. This approach sought to provide further depth and perspective on the emergent numerical findings. The findings reveal that none of the operatives were exposed above the exposure limit value (ELV) and that 91.07% resided under the exposure action value (EAV). However, the Burr four parameter probability model (which satisfied the Anderson–Darling, Kolmogorov–Smirnov and chi-squared goodness of fit tests at α 0.01, 0.02, 0.05, 0.1 and 0.2 levels of significance) illustrated that given the current data distribution pattern, there was a 3% likelihood that the ELV will be exceeded. Model parameters could be used to: forecast the future probability of HAV exposure levels on other utility contracts and provide benchmark indicators to alert senior management to pending breaches of the ELV. HAV field trials are rarely conducted within the UK utilities sector, and the research presented is the first to develop probability models to predict the likelihood of operatives exceeding the ELV based upon field data. Findings presented could go some way to preserving the health and well-being of workers by ensuing that adequate control measures implemented (e.g. procuring low vibrating tools) mitigate the risk posed.
Publisher: Elsevier BV
Date: 05-2018
Publisher: Inderscience Publishers
Date: 2016
Publisher: Hindawi Limited
Date: 25-08-2019
DOI: 10.1155/2019/6356107
Publisher: University of Technology, Sydney (UTS)
Date: 31-03-2017
Abstract: A BIM-enabled Construction Project (BIMCP) refers to a project involving relevant BIM tools to generate, exchange and manage project data between project participants. Success in delivering BIMCPs largely relies on how effective project members collaborate. As a result, collaboration on BIMCP has become a growing field of research while a review of studies on collaboration on BIMCPs is still missing. To address this gap, this paper presents the findings of a systematic review on studies devoted to collaboration on BIMCPs over the past 10 years (2006-2016). To this end, 208 studies published in 12 ICT-oriented journals in the construction context are thoroughly reviewed. The findings bring to light that studies on collaboration on BIMCPs are sporadic, isolated and focus on narrowed, limited and disjointed areas associated with collaboration. The study contributes to the field through highlighting the gaps of the existing literature on the topic. This provides a stepping stone to direct future inquiries that target collaboration on BIMCPs.
Publisher: Elsevier BV
Date: 08-2021
Publisher: Emerald
Date: 29-10-2021
DOI: 10.1108/SASBE-07-2021-0108
Abstract: High-level labor waste is a major challenge in construction projects. This paper aims to identify, quantify and categorize labor waste in the context of Iranian housing construction projects. This research uses a case study approach, with empirical data collected through direct observations and semi-structured interviews. Having triangulated the findings from the literature review and empirical studies, a list of eight types of waste was derived for the thirteen observed laborers in ten case study projects. The empirical studies allowed the labor waste identified from the literature to be verified and refined by considering it in the context of the observed activities, and led to two new types of waste being identified which were not considered in the literature. Findings indicate that nearly 62% of laborers' time is spent on non-value-adding activities. It appeared that “unnecessary movement,” “waiting” and “indirect work” make up the highest labor waste. This research focuses only on onsite resource flows in a housing construction site. It does not include offsite flows such as material delivery to site. The findings have provided substantial evidence on type and amount of labor waste and provide a solid basis to stimulate construction actors to participate in reducing labor waste and improving productivity.
Publisher: Emerald
Date: 14-10-2019
DOI: 10.1108/IJBPA-01-2019-0003
Abstract: The study of house prices has become more relevant in recent times after the global financial crisis. Using a housing data set from three regions of Ghana (collated from real estate agents), the purpose of this paper is to estimate the relative importance of housing attributes to house prices. The hedonic regression analysis conducted indicates that location is the most powerful determinant of house prices. Other relevant factors are the number of bedrooms, the number of floors, the total floor area, land size, age of the house and luxury finishing. The implications of these results are many. Policy wise, the study provides an evidence-based empirical study that supports the need for better urban planning to improve communities, which in turn is associated with house price appreciations. Homeowners, investors and creditors, particularly mortgage lenders could be the immediate beneficiaries. Drawing on this, improved urban planning could mitigate strategic defaults that results from house prices falling below mortgage loan balances. This is important for financial market stability. The paper provides a comprehensive and unique understanding of the hedonic determinants of house prices in Ghana. Future studies could examine the effect of location upon mortgage lending in Ghana.
Publisher: Emerald
Date: 07-04-2015
Abstract: – This study aims to present an integrated conceptual model in order to highlight the major aspects of diffusion of innovations in the architecture, engineering and construction (AEC) context. To this end, a critical review of literature is conducted, accompanied by synthesising the findings of previous studies. The driving force behind this study is stemmed from the fragmentation of literature on innovation diffusion, and paucity of research on diffusion of Global Virtual Engineering Teams (GVETs) as the platform for many technological innovations in relevant literature. Thus, the present study is intended to facilitate filling the gap in GVETs literature. That is, the proposed model will offer a foundation for academia for grounding studies on any innovation including GVETs in the literature on innovation diffusion in the AEC context. – This paper draws upon the qualitative meta-analysis approach encompassing a critical review of the relevant literature. To this end, the review builds upon studies found within 15 prestigious journals in AEC. The domain of this review was confined to areas described as “innovation”, “innovation diffusion” and “innovation adoption”, along with keywords used within a broad review of recently published GVETs literature. The rigour of review is augmented by incorporating 35 authoritative works from other disciplines published in 21 well-known journals in the manufacturing, business and management fields. Moreover, the study deploys the peer-debriefing approach through conducting unstructured interviews with five Australian scholars to verify a model presenting an aggregated summary of previous studies. – The key findings of the study include the following items: synthesising the fragmented studies on innovation diffusion in the AEC context. In doing so, a model capturing the major aspects affecting diffusion of an innovation in AEC projects is presented providing a foundation to address the drawbacks of previous studies within the sphere of GVETs, based on the developed model. – The developed model was only enhanced using a small s le size of academics, as such not empirically validated. – As possibly, the first literature review of innovation in the AEC context, this paper contributes to the sphere by sensitising the AEC body of knowledge on innovation diffusion as a concise conceptual model, albeit verified through the peer-debriefing approach. This study will also further establish the research field in AEC on GVETs along with other methods reliant on virtual working such as building information modelling (BIM) through providing an expanded foundation for future inquiries and creation of knowledge.
Publisher: Emerald
Date: 09-03-2015
Abstract: – This paper aims to present a survey of the perceptions of the barriers to implementing reverse logistics (RL) practices in South Australian (SA) construction organisations. Despite the extensive research on forward logistics and RL, there is a paucity of studies that examine the barriers to implementing RL particularly within the Australian construction industry. This study builds on the ongoing research being undertaken by the authors, entitled “Designing for reverse logistics (DfRL) within the building life cycle: practices, drivers and barriers”, which is examining the best practices and drivers that could be used as a “road map” for developing appropriate solutions for the successful implementation of RL. – Data were collected by utilising a triangulated data collection approach, a literature review and 49 questionnaires. The review of the literature identified 16 barriers to implementing RL. The quantitative survey data were subjected to descriptive and inferential statistics with correlation analysis to examine the relationships between different pairs of variables comprising RL’s critical barriers. – The following barriers were indicated as most significant: lack of incorporation of salvaged materials by designers regulation restrictions to usage of recovered materials and components potential legal liabilities higher costs and longer-time association with deconstructing buildings. The least ranked barriers were mostly drawn from the operational and industrial categories as being: organisational lack of support for deconstruction due to incompatible design lack of organisational support for deconstructing buildings due to higher health and safety risks and inadequate skills and experience for deconstruction (operational). The industrial barrier was related to “higher costs of salvaged materials in comparison to virgin products”. – First, the reported findings are focussed on one study that used questionnaire surveys within the construction industry therefore, the results may not be generalisable to other contexts. Further, studies should be conducted and extended to other industrial sectors beyond the construction industry. Second, the quantitative study ( n = 49) used a smaller s le, and the survey items were based on the review of the literature. – The identified barriers could be used as a “road map” for the development of appropriate solutions for the successful implementation of RL, and to improve the environment-related decision-making processes of contractors. – This study makes a contribution to the body of knowledge on the subject of RL within a previously unexplored SA context. In addition, the study provides some insights on the contributory effects of the barriers to the implementation of RL. It is the first work undertaken to determine the barriers to the adoption of RL within the SA construction industry.
Publisher: Emerald
Date: 13-07-2015
DOI: 10.1108/IJPPM-10-2013-0169
Abstract: – The purpose of this paper is twofold. First, it aims to highlight the main factors and items affecting the productivity of construction projects, based on the perceptions of CEOs in construction companies in Iran. Second, the study compares the elicited CEOs’ perceptions against the findings of studies based on the views of such as project managers, middle managers and employees in other levels. – The study drew upon literature on construction work to develop a conceptual model. Further, a total of 60 CEOs from road construction companies were surveyed using a five-point Likert scale questionnaire to generate the data. The collated data were categorised and ranked according to the CEOs perceived level of importance using the relative importance index. – The findings highlight the main factors and items affecting labour productivity in construction projects in Iran as perceived by CEOs, which are mainly of human resources management nature and could be attributed to motivation and managerial policy aspects. The study also recognises that factors associated with the working environment particularly safety and health are perceived as insignificant by Iranian CEOs which could be a concern for the Iranian construction industry. The discussions shed some light on the discrepancies between the perceptions of CEOs and previous studies in regards to major determinants of productivity in the construction context. – This study is the first study aiming at discussing the perceptions of CEOs of construction companies active in construction projects in Iran. As such, the study highlights the standpoint of the main decision makers in construction companies in regards to labour productivity in the construction sector. Thus, the key contribution of the present study is providing insight into the perceptions of CEOs, who play the most vital role in strategic development of construction companies whereas previous studies have mostly focused on project or middle managers having a lower influence in determining the strategic plans of companies.
Publisher: Inderscience Publishers
Date: 2017
Publisher: Elsevier BV
Date: 11-2023
Publisher: Informa UK Limited
Date: 02-08-2022
Publisher: MDPI AG
Date: 03-04-2023
DOI: 10.3390/BUILDINGS13040952
Abstract: Sewer pipeline failures pose significant threats to the environment and public health. To tackle these repercussions, many deterioration models have been developed to predict the conditions of sewer pipes, most of which are based on CCTV inspection reports. However, these reports are prone to errors due to their subjective nature and human involvement. More importantly, there are insufficient data to develop prudent deterioration models. To address these shortcomings, this paper aims to develop a CCTV-based deterioration model for sewer pipes using Artificial Intelligence (AI). The AI-based model relies on the integration of an unsupervised, multilinear regression technique and Weibull analysis. Findings derived from the Weibull deterioration curve indicate that the useful service life for concrete and vitrified clay pipes are 79 years and 48 years, respectively. The regression models show that the R2 value for vitrified clay sewer pipes, concrete sewer pipes, and ductile iron sewer pipes are 71.18%, 71.47%, and 81.51%, respectively, and 73.69% for concrete stormwater pipes. To illustrate the impact of various factors on sewer pipes, sensitivity analyses under different scenarios are conducted. These analyses indicate that pipe diameter has a significant influence on sewer pipe deterioration, with little impact on stormwater pipes. These findings would guide decision makers in identifying critical pipes and taking necessary precautionary measures. Further, this provides a sound basis for prioritizing maintenance actions, which would pave the way for designing sustainable urban drainage systems for cities.
Publisher: Informa UK Limited
Date: 30-11-2015
Publisher: Springer Science and Business Media LLC
Date: 17-12-2021
Publisher: Emerald
Date: 21-01-2022
DOI: 10.1108/ECAM-08-2021-0751
Abstract: Legal remedies are incorporated into international construction joint ventures (ICJVs) to mitigate contractual breaches. The effectiveness of remedies is predicated on two conditions the comprehensiveness of the contract and its enforceability within the jurisdiction of interpretation. Relational-related weaknesses contribute to contracting parties placing a premium on the contract's capacity for mediating the relationship. However, contracts are not always enforceable. This study aims to examine means by which joint venture relational governance can be maintained under conditions of minimal legal recourse. A relational contracting (RC) theory was used as the theoretical underpinning of the paper. Data were collected and analyzed following a multiple-case study approach from case projects in which ICJVs' was used. The findings reveal (1) 17 relational and contractual governance problems the main six being contractual flexibility, contractual joint venture system, contract reviewing, project conflict, national culture and leader–follower transgressions (2) relational and contractual governance problems are managed differently, depending on financing sources and partners' national culture and (3) that a developed RC-based framework comprising four stages is able to facilitate relational and contractual governance in ICJVs. This study is novel in providing a guided approach to developing non-legal remedies for the mitigation of contractual breaches in ICJVs, grounded in theory and contextualized for the construction sector.
Publisher: Emerald
Date: 07-03-2016
DOI: 10.1108/IJOPM-01-2014-0024
Abstract: – A large number of benefits have been reported when reverse logistics (RL) is fully implemented in the construction industry. However, RL is yet to become common place in the construction sector, particularly in Australia. The particular sub-sector in which RL operates is small and weak and the remainder of the sector must embrace and accommodate it comfortably. Research is lacking on how to promoting RL in the construction industry. Very little has been done to identify the current practices that have the potential to promote RL industry-wide. The purpose of this paper is to identify the practices that work well in the sector, a strategy could be mapped out to promote RL to all stakeholders. – In order to fill the above gap, the present study used a mixed method approach to gather and evaluate current practices and their potential to promote RL in South Australia’s construction industry. Practices that were identified using a comprehensive literature review were evaluated with a questionnaire survey and series of interviews involving construction professionals. – The findings are that practices facilitating deconstruction is the most important, followed by practices facilitating the use of salvaged materials in new construction to promote RL in South Australia. Awareness of deconstruction benefits, challenges and procedures at the organisation level and facilities and services at industry level were associated with RL implementation. Availability of salvaged materials in the market was found to influence its use in new construction and as a consequence its demand. Designing for reverse logistics is another practice that could facilitate deconstruction and the onus of its promotion lies mainly with the designers. – This research was confined to one state in Australia. As such the generalisation to other states and other countries should be treated cautiously. – The findings of this study can help inform the industry and its stakeholders on areas that they need to concentrate more on to make the South Australian construction industry a fully RL integrated one. To that end the authors propose some recommendations arising from the findings reported here. – This study makes a contribution to the body of knowledge on reserve logistics within a previously unexplored South Australian context. In addition, the study provides valuable insights into the contribution of RL practices to the construction industry.
Publisher: MDPI AG
Date: 28-07-2021
DOI: 10.3390/SU13158427
Abstract: This article provides a picture of the latest developments in providing BIM-based tools for construction and demolition waste (CDW) management. The coverage and breadth of the literature on offering BIM-based tools and technologies for dealing with CDW throughout the whole life cycle of construction are investigated, and gaps are identified. Findings reveal that, although various BIM-based technologies are closely associated with CDW, much of the existing research on this area has focused on the design and construction phase indeed, the problem of CDW in post-construction stages has received scant attention. Besides, the now available tools and technologies are lacking in cross-phase insights into project waste aspects and are weak in theoretical rigor. This article contributes to the field by identifying the intellectual deficiencies in offering BIM-based tools and technologies when dealing with CDW. So, too, it points to major priorities for future research on the topic. For practitioners, the study provides a point of reference and raises awareness in the field about the most advanced available BIM-based technologies for dealing with CDW problems.
Publisher: Emerald
Date: 18-02-2021
DOI: 10.1108/SASBE-09-2020-0132
Abstract: The barriers to integrating sustainable practices into construction project management require extensive resource allocations to resolve. Within developing countries such as Iran (where resources are scarce), remedial strategies adopted must prioritise tackling those barriers that can be expected to yield maximum return on investment. The candidate barriers are many, and this paper aims to identify a hierarchy of barriers, providing a priority list of remedial targets. A mixed philosophical stance of interpretivism and post-positivism is adopted within a deductive approach and survey strategy. A list of 30 known barriers are identified from extant literature and used to formulate a questionnaire data collection instrument administered within the Iranian construction industry. Data collected from 176 practitioners are analysed using the relative importance index and Mann–Whitney U test to compare groups based on the participants' demographic variables. The findings challenge the common assumption that items related to market and workforce experience are major inhibitors of change. That is, economics and regulatory dependent barriers have a higher impact on the failure of a shift to sustainable practices in Iran. The most influential barriers to incorporating sustainability in construction projects are: (1) lack of understanding of the potential benefits (2) insufficient cooperation among practitioners, research institutions and environmental organisations and (3) a lack of a systematic approach to pursuing sustainability goals. No significant associations are detected between the affiliation of the respondents and their attitude towards the issue. Thus, a generalised approach can be applied to a broader range of organisations and construction projects in Iran. While studies on sustainability impediments at the firm or project level are ubiquitous within literature, this research identifies that the most significant barriers to sustainable project management in Iran, as an underexplored context, are those experienced at the economic and institutional level. Moreover, this novel research presents important insights into the potential effects of participants' demographic profiles on their view of the importance of identified barriers.
Publisher: MDPI AG
Date: 16-11-2019
DOI: 10.3390/SU11226455
Abstract: This study proposes a framework for the allocation of risk in public private partnerships (PPP) projects. Its contribution lies in the recognition and incorporation of risks introduced by project stakeholders, and as articulated by the principal-agent theory (PAT). The framework assesses risks and routes these risks to those parties best equipped to mitigate their impact on the project. This allocation of risk is facilitated by a thirteen-step process. The practical benefit of this study lies in outlining a clear, systematic method for allocating risk efficiently to both the government and private enterprise parties of the project. In so doing, risk mitigation can be expected to improve project performance, optimize stakeholder goals, and enhance sustainability objectives, including improved operational life-cycle efficiency and elevated social and community benefits.
Publisher: MDPI AG
Date: 30-04-2021
DOI: 10.3390/SU13095040
Abstract: Construction is a complex activity, characterized by high levels of capital investment, relatively long delivery durations, multitudinous risks and uncertainties, as well as requiring the integration of multiple skills delivering a huge volume of tasks and processes. All of these must be coordinated carefully if time, cost, and quality constraints are to be met. At the same time, construction is renowned for performing poorly regarding sustainability metrics. Construction activity generates high volumes of waste, requires vast amounts of resources and materials, while consuming a significant proportion of total energy generated. Digitalization of the construction workplace and construction activities has the potential of improving construction performance both in terms of business results as well as sustainability outcomes. This is because, to put it simply, reduced energy usage, for ex le, impacts economic and “green” performance, simultaneously. Firms tinkering with digitalization, however, do not always achieve the hoped-for outcomes. The challenge faced is that a digital transition of construction firms must be carried out at a strategic level—requiring a comprehensive change management protocol. What then does a digital strategy entail? This study puts forward an argument for the combined economic and sustainability idends to be had from digitizing construction firm activities. It outlines the requirements for achieving digitalization. The elements of a comprehensive digitalization strategy are cataloged, while the various approaches to developing a digitalization strategy are discussed. This study offers practitioners a useful framework by which to consider their own firm-level efforts at digitalization transition.
Publisher: Elsevier BV
Date: 07-2018
Publisher: Elsevier BV
Date: 10-2021
Publisher: Informa UK Limited
Date: 03-05-2022
Publisher: Inderscience Publishers
Date: 2015
Publisher: Vilnius Gediminas Technical University
Date: 03-04-2017
Publisher: Elsevier BV
Date: 10-2017
Publisher: MDPI AG
Date: 25-11-2021
DOI: 10.3390/SU132313028
Abstract: The Special Issue covers sustainability as an emerging requirement in the fields of construction management, project management and engineering. We invited authors to submit their theoretical or experimental research articles that address the challenges and opportunities for sustainable construction in all its facets, including technical topics and specific operational or procedural solutions, as well as strategic approaches aimed at the project, company or industry level. Central to developments are smart technologies and sophisticated decision-making mechanisms that augment sustainable outcomes. The Special Issue was received with great interest by the research community and attracted a high number of submissions. The selection process sought to balance the inclusion of a broad representative spread of topics against research quality, with editors and reviewers settling on thirty-three articles for publication. The Guest Editors invite all participating researchers and those interested in sustainable construction engineering and management to read this summary of the Special Issue and of course to access the full-text articles for deeper analyses.
Publisher: Elsevier BV
Date: 06-2023
Publisher: Emerald
Date: 02-01-2018
Abstract: The “virtuality” of a team collaborative interaction is the extent to which it is accomplished in the same place, in fully distributed virtual teams, or in a hybrid combination of the two. However, existence, strength and process of potential association between virtuality and effectiveness in construction project teams have remained elusive. This paper aims to address this gap in the literature. In this study, a conceptual model demonstrating the association between virtuality and effectiveness of teams was developed through integrating the input-process-output (IPO) model and the “Big Five” theory. This conceptual model was contextualised for the construction industry drawing upon conducting 17 semi-structured interviews with hybrid team experts. The findings provide the first model mapping the associations between virtuality and dimensions of team effectiveness for the construction context. The discovered patterns of associations between virtuality and dimensions of effectiveness for hybrid construction project teams (HCPTs) will assist managers in designing and running more effective teams. In addition, the findings help construction practitioners better understand how virtuality influence the performance and satisfaction of team members in HCPTs. The present study concludes with outlining a set of recommendations based on the findings of the study. As the first study in its kind, the present study offers a new insight into the concept and impacts of virtuality for construction teams and provides instructions and guidelines for designing and maintaining the effectiveness of such teams on construction projects.
Publisher: Springer Science and Business Media LLC
Date: 06-02-2020
DOI: 10.1007/S11948-019-00089-0
Abstract: The construction industry consistently ranks amongst the highest contributors to global gross domestic product, as well as, amongst the most corrupt. Corruption therefore inflicts significant risk on construction activities, and overall economic development. These facts are widely known, but the various sources and nature of corruption risks endemic to the Iranian construction industry, along with the degree to which such risks manifest, and the strength of their impact, remain undescribed. To address the gap, a mixed methods approach is used with a questionnaire, 103 responses were received, and these were followed up with semi-structured interviews. Results were processed using social network analysis. Four major corruption risks were identified: (1) procedural violations in awarding contracts, (2) misuse of contractual arrangements, (3) neglect of project management principles, and, (4) irrational decision making. While corruption risks in Iran align with those found in other countries, with funds being misappropriated for financial gain, Iran also shows a strong inclination to ch ion projects that serve the government's political agenda. Root cause identification of corruption risks, namely, the noticeable impact of authoritarianism on project selection in Iran, over criterion of economic benefit or social good, is a significant outcome of this study.
Publisher: Elsevier BV
Date: 09-2018
Publisher: Emerald
Date: 07-03-2022
DOI: 10.1108/ECAM-09-2021-0817
Abstract: In the study, a five-dimensional-safety risk assessment model (5D-SRAM) is developed to improve the construction safety risk assessment approaches available in the literature. To that purpose, a hybrid multi-dimensional fuzzy-based model is proposed, which provides a comprehensive ranking system for the safety risks existing in a project by considering the contextualization of the construction-related activities resulting in an accident. The developed 5D-SRAM is based on an amalgamation of different fuzzy-based techniques. Through the proposed fuzzy analytic hierarchy process (AHP) method, the importance weights of essential risk dimensions playing role in defining the magnitude of the construction-related risks are obtained, while a precise prioritized ranking system for the identified safety risks is acquired using the proposed fuzzy technique of order preference similarity to the ideal solution (FTOPSIS). Through the application of the proposed 5D-SRAM to a real-life case study – which is the case of green building construction projects located in Hong Kong – contributions are realized as follows: (1) determination of a more complete range of risk dimensions, (2) calculation of importance weightings for each risk dimension and (3) obtainment of a precise and inclusive ranking system for safety risks. Additionally, the supremacy of the developed 5D-SRAM against the other safety assessment approaches that are commonly adopted in the construction industry is proved. The developed 5D-SRAM provides the concerned safety decision-makers with not only all the crucial dimensions that play roles toward the magnitude of safety risks posing threats to the workers involved in construction activities, but also they are given hindsight regarding the importance weights of these dimensions. Additionally, the concerned parties are embellished with the final ranking of safety risks in a more comprehensive way than those of existing assessment methods, leading to sagacious adoption of future prudent strategies for dealing with such risks occurring on construction sites. Numerous studies have documented the safety risks faced by construction workers including proposals for risk assessment models. However, the dimensions considered by such models are limited, generally constrained to risk event probability combined with risk impact severity. Overlooking other dimensions that are essential towards the calculation of safety risks' magnitude culminates in overshadowing the further adoption of fruitful mitigative actions. To overcome this shortcoming, this study proposes a novel 5D-SRAM.
Publisher: Vilnius Gediminas Technical University
Date: 10-04-2012
DOI: 10.3846/20294913.2012.661203
Abstract: The intense competition between the Iranian construction companies has led them to take all appropriate measures to decrease the costs as much as possible. Hence, due to the pivotal role of human resources in construction projects cost, a major part of Iranian construction companies seek their profitability and survival in maximizing the productivity of their operatives. Because of the widespread belief among contractors about the low productivity of daily workers and operatives with basic salary, they commit a major part of their projects activities to sub-contractors. Deployment of sub-contractors by construction firms has become largely conventional in country's construction projects. The aims of this paper is defined as determining the factors and grounds affecting sub-contractors productivity and evaluate their overall negative side effects on project productivity via a structured questionnaire. A total of 31 factors selected and were ided into 7 broad categories. The perceptions of companies managers were asked about the level of effect brought about by the mentioned factors and groups upon productivity on a time based criterion. The analysis indicated that the most important grounds affecting sub-contractors productivity in descending order include: Materials/Tools, Construction technology and method, Planning, Supervision system, Reworks, Weather, and Jobsite condition. Project managers should focus on the identified major grounds and relevant factors in order to improve productivity as long as they commit construction activities to sub-contractors.
Publisher: American Society of Civil Engineers (ASCE)
Date: 07-2018
Publisher: Elsevier BV
Date: 12-2021
Publisher: Emerald
Date: 16-12-2019
DOI: 10.1108/ECAM-05-2019-0270
Abstract: Foreign direct investment in the infrastructure (FDII) of developing countries has a history of at least four decades. Bullish demand for foreign infrastructure services in developing countries, in combination with unstable political environments, has buoyed attention in political risk management (PRM). Even so, research into PRM of FDII remains fragmented and unmapped. Thus, the purpose of this paper is to identify the current body of knowledge in this area, uncover deficiencies and lay the foundation for further practical PRM research in FDII. This paper offers a bibliometric-qualitative review of current literature on political risk in foreign infrastructure in developing countries. A 36-year period is identified, from 1983 to 2018. Publication year, area of focus, author(s), institution and country are classified and analyzed through the medium of social network analysis. The tools used are VOSviewer, CiteSpace and Gephi to analyze citation networks of 345 published papers. Out of 345 papers, 94 highly related studies were selected for further content analysis. The study identified the research trends in related areas of PRM in infrastructure (e.g. PRM in international construction and foreign direct investment) by bibliometric analysis, which includes scattered researcher collaboration, wide-ranging and unfocused journal selection, unsystematic and discontinuous research themes. The specific research weakness in PRM in FDII is recognized by qualitative analysis from the perspective of PRM process, which reveals a lack of understanding of the impact of political risk factors, subjective risk estimations, lacking application of mature political risk database in FDII, combined with a shortage of complete and effective strategies for PRM in FDII in developing countries. This paper is the first of its kind, providing a comprehensive benchmark survey of the research to date in PRM in foreign infrastructure investment in developing countries. It proposes a framework of future research agenda on PRM in FDII, including special issues on this topic, identification and assessment of political risk factors with objective methods, proposition of PRM strategies on FDII with proactive and active approaches, completing strategies of PRM with reactive strategies from the perspectives of whole life cycle of infrastructure projects, political risk factors and stakeholders. It also addressed the need to investigate the suitable literature databases for researching in this area.
Publisher: MDPI AG
Date: 16-11-2020
DOI: 10.3390/SU12229539
Abstract: Integrated project delivery (IPD) is a mode of project procurement recognised as facilitating superior project performance. However, this success is contingent on effective cost management practices that share cost data with all project stakeholders in an accurate, timely and transparent manner. Despite an extensive literature on aspects of cost management, none identifies the essential ingredients required of an effective cost management system, sufficiently robust to support successful IPD projects. Candidate cost management augmenting practices are drawn from the literature, and presented for scrutiny in questionnaire form, to fifty IPD experienced experts, based in the USA, UK and Australia. Findings reveal activity-based costing (ABC) to be effective at identifying overhead costs and creating accounting transparency. Similarly, earned value management (EVM), in combination with ABC, is effective at developing mathematical models for equitable risk-reward distribution. Moreover, web-based management systems, as supported by Building Information Modelling (BIM), are effective at generating trust and collaboration on which IPD success depends. A questionnaire survey using purposive s ling was conducted to assess the factors driving success of implementing IPD regarding cost management process. The contribution to knowledge made by this paper is in identifying requisite support mechanisms essential to elevate traditional cost management practices to the higher standard needed to ensure IPD delivery success.
Publisher: Emerald
Date: 09-04-2018
DOI: 10.1108/IJBPA-08-2017-0034
Abstract: Integrating building information modelling (BIM) into facility management (FM) has generated fervent debate within the extant literature given an increasing realisation amongst practitioners that the majority of BIM benefits reside within the whole lifecycle management. Converting a building’s in-use data and information into tangible business knowledge to augment FM performance is crucial for business growth and prosperity. Yet curiously, scant academic attention has been paid in investigating the data and information hand-over process through BIM required by FM. The purpose of this paper is to address this knowledge gap. The research approach adopted draws upon pertinent BIM in the FM literature and a qualitative discourse accrued via focus group meetings of Australian FM experts. The study’s findings are presented as a data and information typology matrix that captures the associations among different forms of data ownership, FM service delivery categories and data and information typologies for using BIM in FM. The analysis results will prove invaluable for policy-makers, researchers and practitioners by providing a relevant data and information typology and capturing the complex associations in the process of integrating BIM into FM. This study contributes to the field by providing a better understanding of different forms of data and information, required by members of a FM team. The original insight shared here is the necessity to consider a distinctive array of interests and the potential for using different forms of data and information when integrating BIM into FM.
Publisher: Informa UK Limited
Date: 13-05-2021
Publisher: Emerald
Date: 17-09-2021
DOI: 10.1108/ECAM-04-2021-0286
Abstract: Green walls (GWs), comprising living walls and green facades, have been touted as environmentally friendly products in architectural design. GWs can be viable in every aspect of sustainability they provide residents of buildings with a wide range of economic, social and environmental benefits. Despite this, the adoption rate of GW is still in its infancy stage, and the existing literature concerning the hindrances inhibiting GW adoption is very limited. To address these gaps, the aim of this paper is to identify and prioritize the hindrances to GW adoption in Hong Kong. After identifying 17 hindrances through an in-depth review of literature, the fuzzy Delphi method (FDM) is employed to refine the hindrances based on the local context with the help of 21 qualified experts in the field. Subsequently, Fuzzy Parsimonious Analytic Hierarchy Process (FPAHP) is exploited as a recently developed technique to prioritize the identified hindrances. Results reveal that the most significant hindrances to the adoption of GW are maintenance cost, high installation cost, difficulties in maintenance, sophisticated implementation and inducement to fire. Findings call for scholars to address ways to improve GW installation practices and methods in order to eradicate the hindrances and provide lessons for policymakers, assisting them in facilitating the larger-scale adoption of GW. Considering the dearth of studies on hindrances to the adoption of GWs, this paper provides a comprehensive outlook of the issue, providing knowledge that can be used as a building block for future scholars within the field. It also provides valuable insights for stakeholders within the construction industry about the hindrances to the adoption of GWs which could direct their efforts toward better implementation of it.
Publisher: Elsevier BV
Date: 03-2018
Publisher: IEEE
Date: 06-2015
Publisher: Emerald
Date: 30-09-2014
Abstract: – Building upon the results of a critical review of previous studies, the purpose of this paper is to present a framework to enhance the reliability of the theoretical model for international benchmarking of labour productivity (TMIBLP) method for construction project activities. The next part of the paper presents the results of implementing the proposed framework for construction activities in the Iranian construction industry. – This paper draws upon a critical review of the literature to highlight the drawbacks of the previous studies concerning implementing TMIBLP within the construction industry. Identifying these shortcomings, the authors propose a framework for construction projects, which presents the procedure for deploying TMIBLP for construction activities in a reliable manner. The final section of the paper demonstrates the empirical implementation of the proposed framework within the Iranian construction industry. – The primary contributions of the paper include: identifying the drawbacks of previous studies within the construction context, the framework that would lead construction managers towards more reliable implementation of benchmarking for construction projects, and determining the baseline of erecting steel structures in a developing country. – A practical implementation of the TMIBLP method was presented to address the lack of research in Iran and to show the feasibility of using the framework developed. The authors investigated the daily labour productivity for the activity of structural steel erection for six projects in Tehran in order to determine the values of the baseline productivity for each project. Accordingly, the disruption index, performance ratio and project management index as the project benchmarks were calculated for all six projects. – Underlining the necessity of implementing methods such as TMIBLP, this study outlines the outcomes of the first study on the benchmarking of construction activities deploying the proposed framework and using the data on erecting steel structures from six construction projects in Iran. The discussions provide guidelines for construction project managers regarding benchmarking labour productivity. The paper concludes with suggestions for future research opportunities.
Publisher: Elsevier BV
Date: 2023
Publisher: Emerald
Date: 11-05-2020
DOI: 10.1108/IJBPA-12-2019-0111
Abstract: This research paper adopts the fundamental tenets of advanced technologies in industry 4.0 to monitor the structural health of concrete beam members using cost-effective non-destructive technologies. In so doing, the work illustrates how a coalescence of low-cost digital technologies can seamlessly integrate to solve practical construction problems. A mixed philosophies epistemological design is adopted to implement the empirical quantitative analysis of “real-time” data collected via sensor-based technologies streamed through a Raspberry Pi and uploaded onto a cloud-based system. Data was analysed using a hybrid approach that combined both vibration-characteristic-based method and linear variable differential transducers (LVDT). The research utilises a novel digital research approach for accurately detecting and recording the localisation of structural cracks in concrete beams. This non-destructive low-cost approach was shown to perform with a high degree of accuracy and precision, as verified by the LVDT measurements. This research is testament to the fact that as technological advancements progress at an exponential rate, the cost of implementation continues to reduce to produce higher-accuracy “mass-market” solutions for industry practitioners. Accurate structural health monitoring of concrete structures necessitates expensive equipment, complex signal processing and skilled operator. The concrete industry is in dire need of a simple but reliable technique that can reduce the testing time, cost and complexity of maintenance of structures. This was the first experiment of its kind that seeks to develop an unconventional approach to solve the maintenance problem associated with concrete structures. This study merges industry 4.0 digital technologies with a novel low-cost and automated hybrid analysis for real-time structural health monitoring of concrete beams by fusing several multidisciplinary approaches into one integral technological configuration.
Publisher: American Society of Civil Engineers (ASCE)
Date: 09-2018
Publisher: American Society of Civil Engineers (ASCE)
Date: 03-2021
Publisher: MDPI AG
Date: 13-11-2020
Abstract: Occupational Health and Safety (OHS)-related injuries are vexing problems for construction projects in developing countries, mostly due to poor managerial-, governmental-, and technical safety-related issues. Though some studies have been conducted on OHS-associated issues in developing countries, research on this topic remains scarce. A review of the literature shows that presenting a predictive assessment framework through machine learning techniques can add much to the field. As for Malaysia, despite the ongoing growth of the construction sector, there has not been any study focused on OHS assessment of workers involved in construction activities. To fill these gaps, an Ensemble Predictive Safety Risk Assessment Model (EPSRAM) is developed in this paper as an effective tool to assess the OHS risks related to workers on construction sites. The developed EPSRAM is based on the integration of neural networks with fuzzy inference systems. To show the effectiveness of the EPSRAM developed, it is applied to several Malaysian construction case projects. This paper contributes to the field in several ways, through: (1) identifying major potential safety risks, (2) determining crucial factors that affect the safety assessment for construction workers, (3) predicting the magnitude of identified safety risks accurately, and (4) predicting the evaluation strategies applicable to the identified risks. It is demonstrated how EPSRAM can provide safety professionals and inspectors concerned with well-being of workers with valuable information, leading to improving the working environment of construction crew members.
Publisher: University of Technology, Sydney (UTS)
Date: 21-03-2014
Abstract: The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM) approach based on the confirmatory factor analysis (CFA) technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy) is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers.
Publisher: Emerald
Date: 10-07-2017
Abstract: The purpose of this paper is to investigate the implementation challenges of one of lean construction’s recent tools, the last planner system (LPS), by exploring issues in the New Zealand construction sector to identify potential areas for improvement. To achieve this aim, the study formulated two objectives: to present the challenges in LPS use and to explore solutions by using an Excel spreadsheet for facilitating LPS applications. The study drew primarily upon a case study approach. A fieldwork study and document analysis of a New Zealand construction project were conducted with an extensive literature review undertaken on the LPS concept. The findings revealed that although an automated spreadsheet could be a simple and inexpensive option for using the LPS, data collection, storage and transfer into the spreadsheet could significantly influence the reliability of the LPS outcomes. Most data utilisation challenges were found to occur around the three data sets included in the weekly work plan (WWP). The study presented several automation solutions which had been applied to overcome data utilisation challenges. Among the first of its kind in the construction industry, this study, with its first-hand account of an organisation which uses the lean paradigm, provides an in-depth insight into LPS tool implementation. The study extends the current body of knowledge by unearthing the challenges of LPS integration into construction activities and presenting efforts undertaken in a construction case project to overcome relevant issues. This adds value by enhancing the reliability of the LPS and, consequently, the effectiveness of its implementation in practical terms.
Publisher: Vilnius Gediminas Technical University
Date: 26-02-2021
Abstract: Various risks significantly influence pricing of bids and a wide range of factors impact bid pricing risks. Of these, client’s reputation and the record of projects owned by a client have vital contribution on the issue. Current practices however fail to capture the impacts of client-related factors. There is a need for developing a practical quantitative approach, which enables estimators to process bid risk allocation easily. Through reliability analysis, the developed method proposed in this study enables practitioners to make informed bid/no-bid decisions based on estimating the probabilities of schedule and cost overruns. Estimating the probability of project failure enables estimators to quantify the risk element of bid price. In addition, schedule and cost overrun cumulative probability distributions can be used to estimate the expected value of these variables. The practicability of this proposed method is tested by empirical data obtained from 40 university construction projects of one client, for estimating the bid price of a low-rise building. For researchers, findings provide illuminating insight into the potential of using reliability analysis as a valuable tool for bid decision-making practices. So too, the proposed method offers a blueprint for estimating and calculating time and contingency – and managing associated risks – in planning construction projects. The contribution of this study for the world of practice lies in providing a simple, rapid and cost-effective method for bid decision-making processes.
Publisher: MDPI AG
Date: 04-2021
DOI: 10.3390/IJGI10040215
Abstract: Critical issues surrounding the promotion and adoption of building information modeling (BIM) for construction projects are largely country-specific due to contextual socio-cultural, economic, and regulatory environments impacting construction operations and outcomes. There is little information on BIM adoption issues specific to the Cambodian construction industry (‘the industry’). This paper aims to narrow existing knowledge by investigating key drivers for, and barriers to the adoption of BIM in the industry. Using descriptive survey method, feedback was received from contractors and architects that were registered with their respective trade and professional associations in the industry. The multi-attribute method and the Statistical Package for the Social Sciences (SPSS)-based Kendall’s coefficient of concordance (W) test were used to analyze the empirical datasets. Results showed that out of the 13 significant drivers identified in the study, the most influential comprised the technology’s ability to remarkably enhance project visualization and schedule performance this is followed by awareness that the technology is redefining how project information is created and shared among stakeholders and therefore the future of the industry that cannot be ignored. On the other hand, the most constraining barrier to the adoption of the technology, out of 19 significant barriers, related to strong industry resistance to change, especially reluctance to change from 2D drafting to 3D modeling other highly rated barriers included the high initial cost of the software and the shortage of professionals with BIM skills. Implementation of the study findings could support greater uptake of the technology and the leveraging of its key benefits to improving project success and the growth of the Cambodian construction industry, as well as those of other developing economies that share similar socio-cultural, economic, and regulatory environments.
Publisher: Emerald
Date: 10-08-2020
DOI: 10.1108/ECAM-04-2019-0222
Abstract: The amalgamation of integrated project delivery (IPD) and building information modelling (BIM) is highly recommended for successful project delivery. However, IPD lacks an accurate cost estimation methodology at the “front-end” of projects, when little project information is available. This study aims to tackle this issue, through presenting analytical aspects, theoretical grounds and practical steps rocedures for integrating target value design (TVD), activity-based costing (ABC) and Monte Carlo simulation into the IPD cost structure, within a BIM-enabled platform. A critical review was conducted to study the status of cost estimation within IPD, as well as exploring methods and tools that can enhance the cost estimation process for IPD. Thereafter, a framework is developed to present the proposed methodology of cost estimation for IPD throughout its entire stages. A case project is used to validate the practicality of the developed solution through comparing the profit-at-risk percentage for each party, using both traditional cost estimation and the proposed solution. After applying the proposed IPD's cost estimation framework, on a real-life case project, the findings demonstrated significant deviations in the profit-at-risk value for various work packages of the project (approximately 100% of the finishing package and 22% of openings package). By providing a precise allocation of overhead costs, the solution can be used in real-life projects to change the entire IPD cost structure and ensure a fair sharing of risk–rewards among the involved parties in IPD projects. Using the proposed methodology of cost estimation for IPD can enhance the relationship among IPD's core team members all revealed financial deficiencies will be considered (i.e. compensation structure, profit pooling), hence enhancing the IPD performance. This paper presents a comprehensive solution for integrating BIM and IPD in terms of cost estimation, offering three main contributions: (1) an innovate approach to utilise five-dimensional (5D) BIM capabilities with Monte Carlo simulation, hence providing reliable cost estimating during the conceptual TVD stage (2) mathematical models that are developed through integrating ABC into the detailed 5D BIM to determine the three IPD's cost structure limbs and (3) a novel mechanism of managing cost saving (rewards) through distinguishing between saved resources from organisation level, to daily task level, to increase trust among parties.
Publisher: Elsevier BV
Date: 08-2019
Publisher: Emerald
Date: 14-06-2019
DOI: 10.1108/ECAM-09-2018-0390
Abstract: The purpose of this paper is to analyse extant literature on POE of a building’s operations and performance as a means of holistically mapping the existing body of knowledge (BOK) identify impediments preventing its wide-scale adoption throughout practice and develop new theory that seeks to integrate digital technologies (such as building information modelling (BIM)) within facilities management (FM) via a POE feedback mechanism. An inductive and interpretivist methodological approach is adopted that utilises a mixed methods systematic review to map bibliometric data on the POE, associated underpinning processes and benchmarking facilities. Publication and citation metrics are produced via the software VOSviewer to determine the extent to which POE interrelates with other fields of study (namely, digital technologies and FM). The BOK accrued illustrates that whilst POE has received comparatively scant academic attention in comparison to other fields of study, interest in the area is growing. The work also identifies that a stronger community of practice (CoP) is needed (that comprises of academics and practitioners) to ensure that a consistent approach to POE implementation is developed and that the barriers to POE implementation are addressed. Findings presented accentuate the need for design practitioners to reverse engineer POE implementation to inform future design vis-à-vis simply reporting upon an existing building’s performance post construction. Other new theories are also introduced as a means of engendering wider academic discourse in this field of science.
Publisher: Emerald
Date: 25-02-2022
DOI: 10.1108/ECAM-09-2021-0839
Abstract: The business benefits envisaged for BIM represent the main criteria for decision-making about BIM implementation – or shy away from BIM. Despite the significance, traditional evaluation techniques have difficulty to capture “the true value” of BIM from multiple levels and dimensions – as an effective evaluation method is supposed to. This study aims to identify the significant factors that affect BIM return on investment (ROI), develop an integrated model for companies and examine the influence of intangible returning factors of BIM on the rate of BIM implementation. A cluster s ling technique was used 92 questionnaires completed by Australian architecture, engineering and construction small- and medium-sized enterprises (SMEs) provided the basis to identify and analyse the key measurable returning factors, value drivers and strategic benefits associated with BIM ROI. Applying the PLS-SEM technique, findings reveal that a lack of reliable quantification methods for the ROI factors associated with BIM significantly affects the organisation's commitments to implement BIM. In essence, the failure to adequately identify and assess these benefits could result in the system not being appropriately implemented and supported by executive sponsors, who give priority to hard and tangible ROI measurements. The outcome of this study would be of direct appeal to policymakers, industry professionals and the academic community alike, in providing data-informed insight into the intersection between the implementation of BIM and the concept of ROI. Findings would provide a springboard for further research into using ROI factors to increase BIM implementation. Though the findings are directly applicable and contextualised for Australia, they provide lessons and offer a blueprint for similar studies in other countries and settings. That is, regardless of the context, findings raise awareness and provide a point of reference for the quantification of intangible returning factors rather than the tangible returning factors, as one of the first studies in its kind. The study provides original insight in drawing attention to an untapped area for research in BIM implementation, namely BIM ROI. Apart from raising awareness around BIM ROI, the study is novel in providing a quantified model that establishes the links and level of impacts of various factors associated with BIM ROI. Findings of this study, particularly add value to the body of knowledge related to the business implications associated with BIM implementation in the context of Australian SMEs, while providing lessons for other countries and settings.
Publisher: Elsevier BV
Date: 2017
Publisher: American Society of Civil Engineers (ASCE)
Date: 03-2018
Publisher: Inderscience Publishers
Date: 2013
Publisher: Springer International Publishing
Date: 2019
Publisher: Elsevier BV
Date: 04-2018
Publisher: Elsevier BV
Date: 04-2022
Publisher: American Society of Civil Engineers
Date: 29-03-2018
Publisher: Emerald
Date: 12-04-2019
DOI: 10.1108/IJMPB-09-2018-0178
Abstract: The purpose of this paper is to present a systematic review of studies on CPD published between 1985 and 2018. Before identifying common CPD, research trends were examined in terms of the number of publications in selected journals, as well as the contributions made by countries, institutions and researchers. The findings reveal that researchers from developing countries have contributed the most to identifying the causes of CPD. A total of 149 causes of CPD were identified in a thorough review of 97 selected studies. Weather/climate conditions, poor communication, lack of coordination and conflicts between stakeholders, ineffective or improper planning, material shortages, financial problems, payment delays, equipment lant shortage, lack of experience/qualification/competence among project stakeholders, labour shortages and poor site management were identified as the ten most common CPDs. Being the first study of its type, this study provides insight into the research output related to this area and identifies a common set of CPDs, which may provide a better understanding of the key areas requiring attention where steps should be taken to minimise or control factors causing delays in construction projects.
Publisher: Informa UK Limited
Date: 17-08-2020
Publisher: Elsevier BV
Date: 08-2017
Publisher: MDPI AG
Date: 27-03-2018
DOI: 10.3390/SU10040981
Publisher: Palgrave Macmillan
Date: 2015
Publisher: IGI Global
Date: 2013
DOI: 10.4018/978-1-4666-3966-9.CH012
Abstract: Many industries have observed the rise of Virtual Teams (VTs) as highly productive team structures taking advantage of members scattered around the globe while being able to accomplish assigned tasks by communicating through internet based technologies. Nonetheless, the looked-for achievable gains of VTs working heavily rest on meeting the requirements prescribed by the antecedents and critical success factors associated with specific idiosyncrasies of VTs such as the multiculturalism dominating their working environment. In this regard, it is widely recognized that when it comes to adopting VTs, the managerial/leadership matters are among the main challenges facing organisations. The major parts of foregoing issues are stemmed from the limitations of mediums of communications exacerbated by cultural ersity and disparity of members. This chapter first aims at critically analysing the different approaches of managing and leading virtual teams and ascertaining the main influential variables. This is followed by presenting a management/leadership model for VTs based on a dynamic integrated approach, thus labelled, ‘Leading and Managing Virtual Teams’ (LeManViT).
Publisher: MDPI AG
Date: 06-01-2022
DOI: 10.3390/BUILDINGS12010057
Abstract: Lightweight modular construction has become an increasing need to meet the housing requirements around the world today. The benefits of modular construction ranging from rapid production, consistency in quality, sustainability, and ease of use have widened the scope for the construction of residential, commercial, and even emergency preparedness facilities. This study introduces novel floor panels that can be flat-packed and built into modular housing components on-site with minimal labour and assistance. The flooring system uses hollow cellular panels made of various configurations of trapezoidal steel sheets. The structural performance of three different configurations of these hollow flooring systems as a modular component is presented in this study by analysing the failure modes, load-displacement parameters, and strain behaviour. The study confirms significant advantages of the proposed hollow floor systems, with multi-cells reporting higher load-carrying capacity. The hollow flooring system performed well in terms of structural performance and ease in fabrication as opposed to the conventional formworks and commercial temporary flooring systems. The proposed flooring system promises efficient application as working platforms or formworks in temporary infrastructural facilities and emergency construction activities.
Publisher: Emerald
Date: 07-2021
DOI: 10.1108/ECAM-07-2020-0547
Abstract: Reverse logistics (RL) is a waste revaluation process aimed at reintroducing once-used materials back into the production cycle. Public administration (PA) plays a strong role in influencing the implementation of RL in the construction industry through policy and laws. While much research identifies PA as an important driver in RL, no research yet describes how this occurs. A systematic literature review was conducted on the theme PA in RL with 93 relevant publications retrieved. Six strategies used by PA to promote RL were extracted: (1) legislation, (2) government subsidies, (3) landfill disposal fee, (4) government inspection, (5) use in public construction works and (6) penalties and fines. Moreover, a typology built on these six strategies was developed, mapping 15 interactional relationships between strategies, according to three levels of influence: (1) encouragement (2) requirement and (3) regulation. It was found that legislation and government subsidies prove to be the more effective strategies, with the remaining strategies greatly neglected. Importantly, however, this study reveals that a combination of strategies are most effective when appropriately combined. This study confirms the importance of PA in RL, in construction, while documenting the extent of current research. The resulting proposed typology, along with 15 identified future research priorities, is expected to be of value to academics and policy makers looking to advance understanding in this domain.
Publisher: Elsevier BV
Date: 11-2013
Publisher: American Society of Civil Engineers (ASCE)
Date: 09-2019
Publisher: Emerald
Date: 04-10-2019
DOI: 10.1108/ECAM-02-2019-0103
Abstract: Remotely piloted aircraft (RPA) systems have emerged as an established tool within the construction industry. Concurrent with this trend has been the rise in research on RPA, establishing this as a new field of study within the construction management domain. What is needed now is an assessment of the current state of research in this emerging discipline – its strengths and weaknesses – by which future research on RPA in construction may be guided. The purpose of this paper is to address this need. A total of 59 peer-reviewed journal articles covering RPAs within the construction domain were systematically reviewed using a mixed-methods approach, utilizing qualitative-scientometric analyses techniques. The results reveal a field of study in its fledgling stage, with a limited number of experts operating somewhat in isolation, from a limited number of institutions. Key publication outlets are identified, with the main focus of research being in the technical areas of remote sensing, photogrammetry and image processing. The study benefits researchers and industry practitioners alike. For researchers, the identified gaps reveal areas of high priority in future research. For construction companies, particularly small to medium-sized businesses, the study raises awareness of the latest developments and potential applicability of RPAs in the industry. The study exposes what is missing from current research: a broader consideration of organizational adjustments needed to accommodate RPA usage, economic analyses and impediments to wider acceptance.
Publisher: American Society of Civil Engineers (ASCE)
Date: 07-2018
Publisher: American Society of Civil Engineers (ASCE)
Date: 08-2018
Publisher: Informa UK Limited
Date: 22-01-2015
Publisher: Emerald
Date: 22-07-2019
DOI: 10.1108/ECAM-12-2018-0535
Abstract: The purpose of this paper is to quantify the barriers to the use of integrated project delivery (IPD), as assessed by 115 construction professionals in Malaysia. Barriers recording highest citation amongst researchers worldwide were collated in the form of a conceptual model. This model was validated via a partial least squares structural equation modelling technique. Findings advance the body of knowledge on IPD by providing original insights into the nature of key barriers, quantifying the relative importance of each barrier. Despite the above-mentioned contributions, and before drawing any conclusion, it is prudent to acknowledge limitations, particularly the chosen research approach in focusing on the Malaysian context. Therefore, caution must be exercised in direct application of findings to other contexts research findings should be seen through the lens of moderatum generalisations (see Payne and Williams, 2005). Apart from contributions to the body of knowledge, for the world of practice, conditions impacting a transition to IPD are discussed, with a recommendation for change management through a tested mechanism like the European Corporate Sustainability Framework. Being the first empirical study undertaken to quantify the relationship among the identified barriers and IPD, the present study contributes to the field by addressing the gap in IPD research in Malaysia, as an exemplar of a developing country it creates knowledge to inform further improvements in project performance through facilitating IPD use. The study also offers insight to construction stakeholders in other developing countries for tackling issues that hinder the adoption of an IPD approach, and it also points to major barriers such that resources for tackling barriers may be allocated properly.
Publisher: Hindawi Limited
Date: 25-08-2019
DOI: 10.1155/2019/5290690
Abstract: Building information modeling (BIM) is transforming the way of work across the architecture, engineering, and construction (AEC) industry, where BIM offers vast opportunities for improving performance. BIM is therefore an area of great interest across the AEC industry in general and for the structural engineering field in particular. This paper is aimed at providing a broad picture of published papers that relate BIM with structural engineering. This overview will enhance understanding of the state of the research work on this subject, drawing upon bibliometric analysis of 369 papers. Findings provide an updated picture of how now-available studies that link BIM developments and applications in structural engineering are distributed chronologically, across journals, authors, countries, and institutions. Detailed analyses of citation networks present the cooccurrence map of keywords, citation patterns of journals and articles, the most cited journals, and the top 15 most cited articles on BIM in the area of structural engineering. Discussions demonstrate that research on BIM applications for structural engineering has been constantly growing with a sudden increase after 2014. This study reveals that research attempts on this area have been dominated by exploring generic issues of BIM like information management however, technical issues of structural engineering, to be resolved through BIM capabilities, have remained overlooked. Moreover, the research work in this area is found to be conducted largely in isolation, comprising disjointed and fragmented research studies. Gaps and important areas for future research include modeling of structural components, automation of the assembly sequence, planning and optimization of off-site construction, and dynamic structural health monitoring.
Publisher: Edward Elgar Publishing
Date: 24-01-2023
Publisher: Springer Science and Business Media LLC
Date: 07-10-2022
Publisher: Emerald
Date: 23-08-2020
DOI: 10.1108/ECAM-04-2020-0271
Abstract: The Internet of Things (IoT) provides exciting opportunities for the construction industry to solve its time and resource constraints and frequent defaults. This study seeks to identify and rank the perceived importance level of principal research areas associated with the IoT and the construction industry by utilising a scientific mapping tool (i.e. VOSviewer). Such knowledge would enable key drivers for successful adoption of the IoT and digitisation technologies to be outlined. An analysis of key drivers and research trends that facilitates the development of a roadmap for applying the IoT and digital technologies in the construction sector is therefore much needed. An interpretivist philosophical lens was adopted to analyse published work as secondary data, where each publication represented a unit of analysis. A total of 417 peer-reviewed journal review articles covering the IoT within the construction domain were systematically reviewed using a mixed-methods approach, utilising qualitative-scientometric analyses techniques. The results revealed a field of study in a fledgling stage, with a limited number of experts operating somewhat in isolation and offering single-point solutions instead of taking an integrated “holistic” approach. Key publication outlets were identified and the main focus of research undertaken being in the technical areas of smart buildings, smart construction objects and environmental sustainability. The major effects of adopting the IoT within the construction industry were identified as high-speed reporting, complete process control, data explosion leading to deep data analytics, strict ethical and legal expectations. Key drivers of the IoT adoption were outlined: interoperability data privacy and security flexible governance structures proper business planning and models. The study benefits researchers and industry practitioners alike. For researchers, the identified gaps reveal areas of high priority in future research. For construction companies, particularly small to medium-sized businesses, the study raises awareness of the latest developments and potential applicability of the IoT in the industry. For government agencies and policymakers, this study offers a point of reference in directing the adoption of the IoT smoothly in the construction sector and provides guidelines and standards for maximising the potential benefits. The study is the first scientometric review of the existing body of knowledge in the context of application of the IoT in the construction industry. Findings expose knowledge gaps in contemporary research, specifically, a broader consideration of organisational adjustments needed to accommodate the IoT usage, economic analyses and impediments to wider acceptance.
Publisher: Informa UK Limited
Date: 21-03-2017
Publisher: Emerald
Date: 08-11-2022
DOI: 10.1108/ECAM-06-2022-0551
Abstract: To come up with a prudent decision on the installation of an appropriate green wall (GW) on buildings, this study presents a novel decision-making algorithm. The proposed algorithm considers the importance of barriers h ering GW adoption, as well as their relationships with regard to different types of GWs existing in a contextual setting. The proposed methodological approach is based on the integration of qualitative and quantitative techniques by employing focus group discussion, fuzzy-based best-worst method and fuzzy TOPSIS. Based on the experiences of qualified experts involved in related projects in Hong Kong, the following conclusions are drawn: (1) cost, installation and maintenance-related barriers are perceived to have the highest importance, (2) modular living wall system is the most suitable GW system for the context of Hong Kong and (3) existing barriers are found to have a pivotal role in the ranking of the most suitable GW systems. The findings provide valuable insight not only for policymakers and stakeholders, but also for establishing a methodological approach that can assist decision-makers in identifying the most beneficial GW system rather than the most applicable one. This could have significant implications and introduce potential changes to the common way of practice within the industry and lay the foundation for wider adoption of GW. While previous studies have investigated the sustainability-related issues of GW façade applications, the current body of knowledge is deprived of a comprehensive methodological approach for the selection of the most suitable GW systems.